REG NASA-LLIS-0433-1996 Lessons Learned Voyager - Power Subsystem Power Distribution Flight Relay Procurement (~1975).pdf
《REG NASA-LLIS-0433-1996 Lessons Learned Voyager - Power Subsystem Power Distribution Flight Relay Procurement (~1975).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0433-1996 Lessons Learned Voyager - Power Subsystem Power Distribution Flight Relay Procurement (~1975).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0433Lesson Info:a71 Lesson Number: 0433a71 Lesson Date: 1996-07-17a71 Submitting Organization: JPLa71 Submitted by: J.A. RobertsSubject: Voyager - Power Subsystem Power Distribution Flight Relay Procurement (1975) Abstract: Voyagers discovery of defective component lots in wel
2、ded module assemblies led to a re-procurement of the flight relays. For procurement of parts with a prior history of problem/failures, evaluate the design and workmanship of the current production and determine the need for JPL inspections and special screening tests.Description of Driving Event: (R
3、elevant Historical Lesson(s) Learned)During flight welded module fabrication (2) 3SBM relay failures occurred. One relay failed due to a shorted coil, the other failure was due to a broken weld. Subsequent JPL failure analysis on (14) additional flight relays showed failed conditions in one or more
4、of the armature positioning welds.An investigative team visited the vendor to review the failures and the relay manufacturing process/Quality Assurance (QA) controls. The welding process suffered from a component “fit“ problem, worn welding fixtures and an absence of weld schedules. The coil lead op
5、eration had no instructions that precluded the possibility of coil shorts. The QA coverage lacked a systematic method of keeping records and employing corrective action.Based on the deficiencies found in the manufacturing process and the inability to cull defective relays in a non-destructing manner
6、 from the existing flight lots, a re-procurement of flight relays was initiated. The modifications to the fabrication process include: (a) component part inspection prior to kitting, (b) development of weld schedules and weld inspection criteria, and (c) JPL inspection points established at critical
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS04331996LESSONSLEARNEDVOYAGERPOWERSUBSYSTEMPOWERDISTRIBUTIONFLIGHTRELAYPROCUREMENT1975PDF

链接地址:http://www.mydoc123.com/p-1018080.html