1、Lessons Learned Entry: 0312Lesson Info:a71 Lesson Number: 0312a71 Lesson Date: 1994-03-24a71 Submitting Organization: JPLa71 Submitted by: M. P. ZydowiczSubject: ACTS Pyro Separation Band Anomaly (Shuttle Orbiter) Abstract: Minor damage to the Shuttle was caused when the firing of the primary explos
2、ive cord to deploy the payload from the cargo bay also triggered the backup cord. End-to-end system tests had validated the erroneous design rather than the end function. Document electrical-mechanical interfaces, protect hazardous systems against any possible unintended operation, and consider use
3、of a single cord configuration.Description of Driving Event: During the successful deployment of the ACTS/TOS Payload from the STS-51 cargo bay on September 12, 1993, the “SUPER*ZIP“ pyrotechnic separation joint ruptured, producing debris that caused minor damage. Two explosive cords were initiated
4、and operated in the subsystem (when functioning of one cord was desired), causing considerably more energy to be imparted into this subsystem, resulting in the rupture of the containment tube, doubler plates, lead sheathing, silicone rubber extrusion and in the emission of carbon particles (smoke).
5、One affected plate penetrated through the shuttle orbiter aft bulkhead insulation blanket and punctured a 1/8 x 1/2 inch hole in the aft bulkhead. Flight/crew critical equipment exists immediately behind the bulkhead. Other debris caused at least nine small tears in cargo bay insulation blankets, th
6、ree gouges in wire tray covers and possibly a gouge in a thermal protection system tile.The primary cause of the separation system anomaly was a circuit design error, which resulted in firing one end of both the primary and back-up cords, rather than firing both ends of the primary cord. The direct
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS03121994LESSONSLEARNEDACTSPYROSEPARATIONBANDANOMALYSHUTTLEORBITERPDF

链接地址:http://www.mydoc123.com/p-1017959.html