1、1Generic Saddle FusionJoining Procedure forPolyethylene Gas PipingTR-41/20021825 Connecticut Ave., NW Suite 680 Washington, DC 20009P: 202-462-9607F: 202-462-9779www.plasticpipe.org2FOREWARDThis report was developed and published with the technical help and financialsupport of the members of the PPI
2、 (Plastics Pipe Institute, Inc.). The members haveshown their interest in quality products by assisting independent standards-makingand user organizations in the development of standards, and also by developingreports on an industry-wide basis to help engineers, code officials, specifying groups,and
3、 users.The purpose of this technical report is to provide important information available toPPI on a particular aspect of polyethylene pipe saddle fusion to engineers, users,contractors, code officials, and other interested parties. More detailed information onits purpose and use is provided in the
4、document itself.This report has been prepared by PPI as a service of the industry. The information inthis report is offered in good faith and believed to be accurate at the time of itspreparation, but is offered without any warranty, expressed or implied, includingWARRANTIES OF MERCHANTABILITY AND F
5、ITNESS FOR A PARTICULARPURPOSE. Consult the manufacturer for more detailed information about theparticular joining procedures to be used with its piping products. Any reference to ortesting of a particular proprietary product should not be construed as an endorsementby PPI, which does not endorse th
6、e proprietary products or processes of anymanufacturer. Industry members in fulfilling their own compliance responsibilitiesoffer the information in this report for consideration. PPI assumes no responsibility forcompliance with applicable laws and regulations.PPI intends to revise this report from
7、time to time, in response to comments andsuggestions from users of the report. Please send suggestions of improvements tothe address below. Contacting PPI directly or visiting the web site can obtaininformation on other publications.The Plastics Pipe Institute, Inc.Toll Free: (888) 314-6774http:/www
8、.plasticpipe.orgOctober 20023I. IntroductionIn 1994, representatives of the U.S. Department of Transportation (DOT), Office ofPipeline Safety requested that the Plastics Pipe Institute assist in promoting greateruniformity in the joining procedures utilized by gas utilities in the butt and saddlefus
9、ion of polyethylene (PE) gas piping products. DOT reported that it had encountereda proliferation of similar but slightly varying joining procedures from individual PE pipeproducers. The slight differences in the various procedures made it more difficult forpipeline operators to qualify persons with
10、 appropriate training and experience in theuse of these procedures, and more difficult for DOT to enforce the joiningrequirements in 49 C.F.R. Part 192.285 (Plastic pipe; qualifying persons makingjoints) of the Code of Federal Regulations.In response to DOTs request, PPI established a task group to
11、review the fusionprocedures currently used and develop a more uniform, or “generic” joining procedurethat could be qualified by pipeline operators This joining procedure would bringgreater consistency to this aspect of gas pipeline installation, facilitate the pipelineoperators efforts to qualify th
12、e procedure, reduce costs, and simplify DOTsenforcement duties.II. ScopeThe program undertaken by the PPI Task Group for the testing of representativematerials under a generic set of conditions was designed to reflect the fusionconditions and parameters specified in most joining procedures recommend
13、ed bypipe producers and qualified by pipeline operators. It produced a PPI TechnicalReport (TR-33/99) that reflects a Generic Butt Fusion Procedure that most of thePolyethylene Gas Pipe manufacturers recommend. At the conclusion of the buttfusion phase of the program, the task group started its test
14、ing to develop a GenericSaddle Fusion Procedure that is based on common interfacial pressures and heateradapter surface temperatures. In anticipation of a change in the Maximum AllowableOperating Pressure (MAOP) and the design factor from .32 to .40, it was felt that thisprocedure was needed to insu
15、re safety in saddle fusion on live gas mains. It wasintended to provide a technical basis for the development of a proposed genericsaddle fusion procedure (see Appendix A) that can be offered to the industry for usewith selected PE piping products. The procedure would be available for use bypipeline
16、 operators who would determine whether the procedure is appropriate fortheir use with the PE piping products they employ. Pipeline operators may considerrecommendations and testing performed by others in their efforts to comply with thefusion procedure qualification requirements of 49 C.F.R. Part 19
17、2.283 (Plastic pipe;qualifying joining procedures).4It is important to emphasize that the testing performed by the PPI Task Group wasintended only to establish a technical basis for developing and proposing a genericfusion joining procedure that may be qualified and used by pipeline operators with a
18、broad range of PE piping products. The testing was not intended to qualify theprocedure for use with any particular pipe product, and PPI offers no opinion onwhether the procedure is properly qualified for use with any particular PE pipe product.PE pipe producers remain solely responsible for any re
19、presentations that they maymake about the use of this generic procedure or any other joining procedure with theirproprietary PE piping products. Pipeline operators remain solely responsible forcompliance with the requirements of 49 C.F.R. Part 192.283 (Plastic pipe; qualifyingjoining procedures) whe
20、n qualifying any procedure for use with the products theyselect for their pipelines.PPI hopes that the inherent value of greater uniformity will provide an incentive formanufacturers and pipeline operators to evaluate the proposed generic procedure inAppendix A as a first option for saddle fusion jo
21、ining of PE piping products. Use ofthis procedure is not mandatory, and each PE pipe producer and pipeline operatorretains the option of developing different procedures for its particular products andpipelines. However, PPI believes that its work in developing this procedure willpromote the use of e
22、ffective, qualified procedures for saddle fusion joining of PE pipe.III. Testing Program to Evaluate Use of PPI-Proposed GenericSaddle Fusion Joining Procedure with Polyethylene GasPiping ProductsThe PPI Task Group consisted of representatives from the following equipment, fitting,and pipe manufactu
23、rers: Performance Pipe, Rinker PolyPipe, Central Plastics,Uponor, Charter Plastics, North American Pipe, KWH Pipe, Rahn Plastics, McElroyManufacturing, and T.D. Williamson.The Task Group collected and examined a large number of diverse procedures nowin use by gas pipeline operators or recommended by
24、 pipe producers for specific PEpiping products. It then identified those conditions and fusion parameters that werecommon to the majority of those procedures. The Task Group proposed the followingsaddle fusion parameters as representative of the conditions in the individualprocedures that they revie
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- PPITR412002GENERICSADDLEFUSIONJOININGPROCEDUREFORPOLYETHYLENEGASPIPING 聚乙烯 输气管道 底座 熔接 一般 程序 PDF

链接地址:http://www.mydoc123.com/p-1016814.html