PFI TB-3-2013 GUIDELINES CLARIFYING RELATIONSHIPS AND DESIGN ENGINEERING RESPONSIBILITIES BETWEEN PURCHASERS ENGINEERS AND PIPE FABRICATOR OR PIPE FABRICATOR ERECTOR.pdf
《PFI TB-3-2013 GUIDELINES CLARIFYING RELATIONSHIPS AND DESIGN ENGINEERING RESPONSIBILITIES BETWEEN PURCHASERS ENGINEERS AND PIPE FABRICATOR OR PIPE FABRICATOR ERECTOR.pdf》由会员分享,可在线阅读,更多相关《PFI TB-3-2013 GUIDELINES CLARIFYING RELATIONSHIPS AND DESIGN ENGINEERING RESPONSIBILITIES BETWEEN PURCHASERS ENGINEERS AND PIPE FABRICATOR OR PIPE FABRICATOR ERECTOR.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、PFI Technical Bulletin TB-3 Denotes revision (Revised December 2013) GUIDELINES CLARIFYING RELATIONSHIPS AND DESIGN ENGINEERING RESPONSIBILITIES BETWEEN PURCHASERS, ENGINEERS AND PIPE FABRICATOR OR PIPE FABRICATOR ERECTOR Prepared by Pipe Fabrication Institute Engineering Committee All PFI Standards
2、 are advisory only. There is no agreement to adhere to any PFI Standard and their use by anyone is entirely voluntary. Copyright by PIPE FABRICATION INSTITUTE Dedicated to Technical Advancements and Standardization in the Pipe Fabrication Industry Since 1913 USA 511 Avenue of Americas, # 601 New Yor
3、k, NY 10011 CANADA 655, 32ndAvenue, # 201 Lachine, QC H8T 3G6 WEB SITE www.pfi-institute.orgPFI Technical Bulletin TB-3 Denotes revision (Revised December 2013) GUIDELINES CLARIFYING RELATIONSHIPS AND DESIGN ENGINEERING RESPOSIBILITIES BETWEEN PURCHASERS, ENGINEERS AND PIPE FABRICATOR OR PIPE FARICA
4、TOR ERECTOR FOREWORD The Pipe Fabrication Institute publishes these guidelines for the use and convenience of designers and consulting engineering firms, for pipe fabricators and fabricator erectors generally, and for the customers of each of them, in order to furnish some intelligent and practical
5、observations concerning the ordinary and accepted responsibilities which are incurred by the design consultant and by the pipe fabricator or pipe fabricator erector in connection with large piping jobs. It has been the aim of those responsible for this publication to furnish guidance to eliminate or
6、 reduce misunderstandings which have arisen in the industry due to lack of impartial definition concerning the area of responsibility which the participating groups assume on these jobs. The guidelines will be of particular interest in situations where no contractual provision is made affecting thes
7、e imprecise areas. It is possible that the guidelines might be used by contracting parties choosing to do so simply by making reference to them in the contract. We recognize that no guides can possibly provide for every contingency, which might arise. For this reason the work has been directed towar
8、d the normal and usual situation, which from time to time confronts the designer and the fabricator or erector. Obviously, use of the guidelines is left to the discretion and judgment of the contracting parties, but it is our belief that an impartial and objective guidepost will find quick support i
9、n the trade, will be welcomed by designers, fabricators, and erectors and appreciated, especially, by their customers. GUIDELINES 1. GENERAL - BIDDING AND CONTRACTOR 1.1 Bid and contract documents shall specify the specific code or code sub-section applicable to the piping systems. 2. PIPING FABRICA
10、TOR/ERECTOR RESPONSIBILITY 2.1 Some major areas of responsibility of the Piping Fabricator or Erector encompass the following: 2.1.1 Furnish materials in compliance with Purchasers specifications, standards, approved construction drawings and applicable code requirements. 2.1.2 Recommend alternate m
11、aterials, fabricator or construction methods and procedures - which comply with applicable codes - whenever they provide advantages. 2.1.3 Prepare all fabrication sketches and details as required for fabricators regular production procedures and furnish copies in reasonable quantities as required by
12、 Purchasers Engineers for their review, approval and records. 2.1.4 Advise Purchasers Engineers upon discovery of any conflict between their specifications and approved construction drawings and/or deviation from applicable codes, standards and any other condition, which may adversely affect the wor
13、k. 2.1.5 Confirm accuracy and compliance of fabricated assemblies in accordance with Purchasers approved construction drawings within the dimensional tolerances of the current PFI Standard ES-3, irrespective of reviews of fabricators sketches by Purchasers Engineers. 2.1.6 Provide the services of ex
14、perienced technical personnel for performing shop and field non-destructive examination in conformance with Purchasers requirements and code procedures. 2.1.7 Advise Purchasers Engineers currently of any conditions of material procurement that adversely affect delivery and erection schedules and pro
15、vide suggestions for available substitutes where feasible. 2.1.8 Comply with code and specification requirements applicable to fabrication and non-destructive examination including required data reports. PFI Technical Bulletin TB-3 Denotes revision (Revised December 2013) 2.1.9 Maintain quality assu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- PFITB32013GUIDELINESCLARIFYINGRELATIONSHIPSANDDESIGNENGINEERINGRESPONSIBILITIESBETWEENPURCHASERSENGINEERSANDPIPEFABRICATORORPIPEFABRICATORERECTORPDF

链接地址:http://www.mydoc123.com/p-1016596.html