1、 Errata NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems2017 Edition Reference: Various Errata No: 25-17-1 The Technical Committee on Inspection, Testing, and Maintenance of Water-Based Protection Systems notes the following errors in the 2017 edit
2、ion of NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. 1. In Table 5.1.1.2, correct the cross references to read as follows: Table 5.1.1.2 Summary of Sprinkler System Inspection, Testing, and Maintenance Item Frequency Reference Inspection Contr
3、ol valves Chapter 13 Fire department connections Chapter 13 Gauges (wet and deluge systems) Quarterly Chapter 13 Gauges (dry and preaction systems) Monthly/quarterly Chapter 13 Hanger/braces/supports Annually 5.2.3 Heat tracing Per manufacturers requirements 5.2.76 Hydraulic design information sign
4、Annually 5.2.65 Information signs Annually 5.2.7, 5.2.8, 5.2.9 Internal piping condition Chapter 14 Pipe and fittings Annually 5.2.2 Sprinklers Annually 5.2.1 Sprinklers (spare) Annually 5.2.1.4 Supervisory signal devices (except valve supervisory switches) Quarterly 5.2.54 System valves Chapter 13
5、Valve supervisory signal devices Quarterly 5.2.54 Waterflow alarm devices Quarterly 5.2.54 Test Antifreeze solution Annually 5.3.43 Control valves Chapter 13 Gauges 5 years Chapter 13 Main drain Chapter 13 Sprinklers At 50 years and every 10 years thereafter 5.3.1.1.1, 5.3.1.1.1.1, 5.3.1.1.1.2 Sprin
6、klers At 75 years and every 5 years thereafter 5.3.1.1.1.5 Sprinklers (dry) 10 years and every 10 years thereafter 5.3.1.1.1.6 Sprinklers (extra high or greater temperature solder type) 5 years 5.3.1.1.1.4 Sprinklers (fast-response) At 20 years and every 10 years thereafter 5.3.1.1.1.3 Sprinklers (h
7、arsh environments) 5 years 5.3.1.1.2 Supervisory signal devices (except valve supervisory switches) Chapter 13 System valves Chapter 13 Valve supervisory signal devices Chapter 13 Waterflow alarm devices (Mechanical) Quarterly 5.3.32.1 Waterflow alarm devices (vane and pressure switch type) Semiannu
8、ally 5.3.32.2 Maintenance Low-point drains (dry pipe and preaction systems) Chapter 13 Sprinklers and automatic spray nozzles protecting commercial cooking equipment and ventilation systems Annually 5.4.1.7 Valves (all types) Chapter 13 Investigation Obstruction Chapter 14 2. In Table 6.1.1.2, corre
9、ct the cross references to read as follows: Table 6.1.1.2 Summary of Standpipe and Hose Systems Inspection, Testing, and Maintenance Item Frequency Reference Inspection Cabinet Annually 6.2.18 Control valves Chapter 13 Gauges Weekly/quarterly Chapter 13 Hose Annually NFPA 19626.2.5 Hose connection A
10、nnually 6.2.13 Hose nozzle Annually and after each use NFPA 19626.2.6 Hose storage device Annually 6.2.17 Hydraulic design information sign Annually 6.2.32 Hose valves Chapter 13 Hose connection Annually 6.2.1 Piping Annually 6.2.14 Pressure-regulating devices Chapter 13 Test Flow test 5 years 6.3.1
11、 Hose 5 years/3 years NFPA 1962 Hose connections Annually 6.2.1 Hose valves Chapter 13 Hydrostatic test 5 years 6.3.2 Main drain test Chapter 13 Pressure control valve Chapter 13 Pressure-reducing valve Chapter 13 Supervisory signal devices (except valve supervisory switches) Chapter 13 Valve status
12、 test Chapter 13 Valve supervisory devices Chapter 13 Waterflow alarm devices Chapter 13 Maintenance Hose connections Annually Table 6.1.2 Hose valves Chapter 13 Valves (all types) Annually/as needed Chapter 13 3. Correct the cross references in 8.3.3.6.3.3 and 8.3.3.6.3.4 to read as follows: 8.3.3.
13、6.3.3 If the test results are not consistent with the previous annual test, the test shall be repeated using the test arrangement described in 8.3.3.6.3.1. 8.3.3.6.3.4 If testing in accordance with 8.3.3.6.3.1 is not possible, a flowmeter calibration shall be performed and the test shall be repeated
14、. 4. In Table 9.1.1.2, correct the cross references to read as follows: Table 9.1.1.2 Summary of Wat er Storage Tank Inspection, Testing, and Maintenance Item Frequency Reference Inspection Air pressuretanks that have their air pressure source supervised Quarterly 9.2.2.1 Air pressuretanks without t
15、heir air pressure source supervised Monthly 9.2.2.2 Catwalks and ladders Quarterly 9.2.54.1 Check valves Chapter 13 Control valves Chapter 13 Expansion joints Annually 9.2.54.3 Heating system tanks with supervised low temperature alarms connected to constantly attended location Weekly* 9.2.32.1 Heat
16、ing system tanks without supervised low temperature alarms connected to constantly attended location Daily* 9.2.32.2 Hoops and grillage Annually 9.2.54.4 Interior all other tanks 5 years 9.2.65.1.2 Interior steel tanks without corrosion protection 3 years 9.2.65.1.1 Painted/coated surfaces Annually
17、9.2.54.5 Support structure Quarterly 9.2. 54.1 Surrounding area Quarterly 9.2. 54.2 Tank exterior Quarterly 9.2. 54.1 Temperature alarms connected to constantly attended location Monthly* 9.2.43.2 Temperature alarms not connected to constantly attended location Weekly* 9.2.4.3 Water level tanks equi
18、pped with supervised water level alarms connected to constantly attended location Quarterly 9.2.1.1 Water level tanks without supervised water level alarms connected to constantly attended location Monthly 9.2.1.2 Water temperature l ow temperature alarms connected to constantly attended location Mo
19、nthly 9.2.4.2 Water temperature low temperature alarms not connected to constantly attended location Weekly 9.2.4.3 Test High temperature limit switches Monthly* 9.3.4 Level indicators 5 years 9.3.1 Low water temperature alarms Monthly* 9.3.3 Pressure gauges 5 years Chapter 13 Tank heating system Pr
20、ior to heating season 9.3.2 Valve status test Chapter 13 Water level alarms Semiannually 9.3.5 Maintenance Check valves Chapter 13 Control valves Chapter 13 Embankment-supported coated fabric (ESCF) 9.4.6.2 Water level 9.4.2 *Cold weather/heating season only. 5. In Table 9.5.1.1, correct the cross r
21、eferences to read as follows: Table 9.5.1.1 Summary of Automatic Tank Fill Valve Inspection and Testing Item Frequency Reference Inspection Strainers, filters, orifices (inspect/clean) 5 years 13.4.1.2 Enclosure (during cold weather) Daily/weekly 13.4.3.1.1 Exterior Monthly 13.4.3.1.63 Interior Annu
22、ally/5 years 13.4.3.1.74 Test Automatic tank fill valve Annually 9.5.3 6. In Table 10.1.1.2, correct the cross references to read as follows: Table 10.1.1.2 Summary of Wat er Spray Fixed System Inspection, Testing, and Maintenance Item Frequency Reference Inspection Backflow preventer Chapter 13 Che
23、ck valves Chapter 13 Control valves Weekly (sealed) Chapter 13 Control valves Monthly (locked, supervised) Chapter 13 Deluge valve 10.2.2, Chapter 13 Detection systems NFPA 72 Detector check valves Chapter 13 Drainage Quarterly 10.2.87 Electric motor 10.2.98, Chapter 8 Engine drive 10.2.98, Chapter
24、8 Fire pump 10.2.98, Chapter 8 Fittings Annually 10.2.43, 10.2.43.1 Fittings (rubber-gasketed) Annually and after each system activation 10.2.43.1, A.10.2.4.1 Gravity tanks 10.2.109, Chapter 9 Hangers, braces, and supports Annually and after each system activation 10.2.43.2 Heat (deluge valve house)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NFPA25ERTA12018STANDARDFORTHEINSPECTIONTESTINGANDMAINTENANCEOFWATERBASEDFIREPROTECTIONSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-1008506.html