NEMA SG-IC 1-2013 Smart Grid Interoperable & Conformant (SG-IC) Testing and Certification Scheme Operator Guidelines.pdf
《NEMA SG-IC 1-2013 Smart Grid Interoperable & Conformant (SG-IC) Testing and Certification Scheme Operator Guidelines.pdf》由会员分享,可在线阅读,更多相关《NEMA SG-IC 1-2013 Smart Grid Interoperable & Conformant (SG-IC) Testing and Certification Scheme Operator Guidelines.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、NEMA Standards PublicationNational Electrical Manufacturers AssociationANSI/NEMA SG-IC 1-2013Smart Grid Interoperable b) Launching a formal partnership to facilitate development of additional standards to address remaining gaps and integrate new technologies; and c) Developing a plan for testing and
2、 certification to ensure that Smart Grid equipment and systems conform to standards for security and interoperability. Following a series of public forums on Smart Grid standards facilitated by NIST, in November 2009 it opted to form the SGIP. As stated on the NIST website (http:/www.nist.gov/smartg
3、rid/priority-actions.cfm, searched on May 7, 2012): The SGIP engages stakeholders from the entire Smart Grid Community in a participatory public process to identify applicable standards, gaps in currently available standards, and priorities for new standardization activities for the evolving Smart G
4、rid. Thus, the SGIP supports NIST in fulfilling its responsibilities under the 2007 Energy Independence and Security Act. The task of creating a written document for achieving the third phase of the NIST plan falls on the SGTCC of the SGIP. Through an extensive public process that was co-chaired by
5、a member of the NIST staff and involved a voluntary workforce from the SGIP membership, the SGTCC published its Interoperability Process Reference Manual (IPRM), detailing the “recommendations on process and best practices that enhance the introduction of interoperable products in the marketplace.”
6、(SGIP, SGTCC Interoperability Process Reference Manual, version 2.0, January 2012). As it relates to the IPRM, the operating units of THE SCHEME consist of: a) Interoperability Testing and Certification Authorities (ITCA, plural ITCAs) that own and operate implementations of THE SCHEME; 1 For the pu
7、rpose of simplicity, this document will refer only to “SSOs” and “standards” when discussing the features of THE SCHEME. Please note that any such reference is equally applicable to SDOs as well as specifications, guidelines, etc. ANSI/NEMA SG-IC 1-2013 Page 2 b) Accreditation Bodies (AB, plural ABs
8、) that accredit those performing testing and certification activities meeting THE SCHEME requirements; c) Testing Laboratories (TL, plural TLs) that perform tests under THE SCHEME; and d) Certification Bodies (CB, plural CBs) that perform and manage the product certification activities under THE SCH
9、EME. Under THE SCHEME, product certification indicates that representative specimens of the individual grid elements have successfully passed tests to show compliance with the requirements of the relevant SG-IC Test Suite Specifications (TSS, plural TSSs) endorsed by the ITCA, and that continued pro
10、duction of individual grid elements are consistent with those originally submitted under THE SCHEME. For the purposes of Products being evaluated under THE SCHEME, the Test Suite Specifications (TSS) endorsed by the ITCA will generally center on either an individual standard or specific family of Sm
11、art Grid standards. The concept of the TSS encompasses existing testing standards that were previously developed and published by an SDO or it may be developed by a working group constituted by the ITCA. ANSI/NEMA SG-IC 1-2013 Page 3 2 SCOPE This publication contains a description of the attributes
12、for operating a testing and certification scheme as it relates to establishing the characteristics of “interoperability” between devices and systems associated with the electric grid. For the purpose of this scheme, the term “interoperability” is intended to convey the ability of two or more devices
13、 or systems to seamlessly pass electrical current and readily exchange and use information during the course of its normal duty cycle. 2.1 Items considered in-scope include: a) the identification of use cases for the purpose of testing b) the selection of standards that apply to that use case c) the
14、 identification of environmental conditions necessary for testing to that use case d) the identification of a TSS that incorporates all of the above e) the relationships between the various entities involved in the testing: i. ITCA ii. AB iii. CB iv. TL f) the management aspects associated with the
15、implementation of a testing program based on THE SCHEME: i. Handling related families of products ii. Exception handling for variations in manufacturing processes iii. Grievances against participating entities 2.2 Items considered out-of-scope include: a) individual testing procedures associated wit
16、h a TSS b) specific techniques for accomplishing market surveillance after certification testing ANSI/NEMA SG-IC 1-2013 Page 4 3 NORMATIVE REFERENCES The following referenced documents contain provisions that are to be incorporated through reference. References indicate that the latest edition of th
17、e referenced document applies. NEMA shall decide the timetable for the introduction of new publications or revised editions of existing publications. ISO/IEC Guide 28:2004, Conformity assessment Guidance on a third-party certification system for products ISO/IEC Guide 65:1996, General requirements f
18、or bodies operating product certification systems ISO/IEC Guide 67:2004, Conformity assessment Fundamentals of product certification ISO/IEC Guide 68:2002, Arrangements for the recognition and acceptance of conformity assessment results ISO/IEC 17000:2004, Conformity assessment Vocabulary and genera
19、l principles ISO/IEC 17025:2005, General requirements for the competence of calibration and testing laboratories Smart Grid Testing b) suspensions or withdrawals and the procedure for executing and announcing revocations of previous Product certifications; and c) routine assessments of the CB and th
20、e Products it has certified. 5.3.4 SG-IC Product Listing As part of the responsibilities for certifying products, the CB shall maintain on its Web site a certification file for each Participant, which shall contain a listing of SG-ICcertified products. The listing shall include at minimum: a) a stat
21、ement that only SG-ICcertified products are listed; b) vendor/manufacturer name and contact information; c) brand/model/model number for every certified model; d) certification file number; and 2 In some cases a CB may want to ask the ITCA whether its current accreditations can be permitted, even th
22、ough they may be by International Accreditation Forum (IAF) signatories not yet identified by the ITCA. If a CB already has relationship with an IAF signatory accreditor, it may be a minor scope expansion to participate in THE SCHEME rather than establish a new (and possibly redundant) relationship
23、with another accreditor. ANSI/NEMA SG-IC 1-2013 Page 7 e) certification date 5.3.4.1 Deleted or Discontinued Models Deleted or Discontinued Models are those whose production has ceased, but there is still new stock available for sale. The effective date of the Deleted Model status is the date that a
24、n authorized CB is notified by letter of the decision to delete or discontinue manufacturing the Product by the Participant. Models can be deleted only after production ceases, but they will continue to be subject to market surveillance procedures. Deleted Models should continue to be listed by the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NEMASGIC12013SMARTGRIDINTEROPERABLECONFORMANTSGICTESTINGANDCERTIFICATIONSCHEMEOPERATORGUIDELINESPDF

链接地址:http://www.mydoc123.com/p-994423.html