NAVY UFGS-23 22 26 00 20-2010 STEAM SYSTEM AND TERMINAL UNITS《蒸汽系统和终端装置》.pdf
《NAVY UFGS-23 22 26 00 20-2010 STEAM SYSTEM AND TERMINAL UNITS《蒸汽系统和终端装置》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-23 22 26 00 20-2010 STEAM SYSTEM AND TERMINAL UNITS《蒸汽系统和终端装置》.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 22 26.00 20 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-23 22 26.00 20 (November 2009)UFGS-23 22 26.00 20 (April 2006)UFGS-15183N (September 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECT
2、ION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONINGSECTION 23 22 26.00 20STEAM SYSTEM AND TERMINAL UNITS02/10PART 1 GENERAL1.1 REFERENCES1.2 GENERAL REQUIREMENTS1.2.1 Classes and Maximum Working Pressures1.2.2 Standard Commercial Product1.2.3 Welding Safety1.2.4 Definitions
3、1.2.4.1 High Pressure Piping System1.2.4.2 Low Pressure Piping System1.2.4.3 Terminal Unit1.2.4.4 Piping and Piping System1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Welding Procedure1.4.2 Welders Performance Qualification Record1.4.3 Previous QualificationsPART 2 PRODUCTS2.1 PIPE AND PIPE SYSTEM2.1.1
4、High Pressure Steam Piping System (Over 103 kPa (Gage)Over 15 psig)2.1.1.1 High Pressure Steam Piping2.1.2 Low Pressure Steam Piping System2.1.2.1 Low Pressure Steam Piping2.1.3 Condensate Return Piping (690 kPa (gage)100 psig or Less)2.1.3.1 Steel Piping2.1.3.2 Copper Tubing (103 kPa (Gage)15 psig
5、or Less)2.1.4 Fittings2.1.4.1 Fittings for Steel Pipe2.1.4.2 Fittings for Copper Tubing2.1.5 Unions2.1.5.1 Unions for Steel PipeSECTION 23 22 26.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.5.2 Unions for Copper Tubing2.1.6 Flanges
6、2.1.6.1 Steel Flanges2.1.6.2 Bronze Flanges2.1.7 Valves2.1.7.1 Gate Valves2.1.7.2 Globe and Angle Valves2.1.7.3 Check Valves2.1.7.4 Steam Pressure Reducing Valves2.1.7.5 Temperature Regulating Valves2.1.7.6 Air Vent Valves2.1.7.7 Radiator Valves2.1.7.8 Valve Operating Mechanism2.1.7.9 Safety Valves2
7、.1.8 End Connections2.1.8.1 Steel Piping2.1.8.2 Joints for Copper Tubing2.1.9 Expansion Joints2.1.9.1 Packless Type2.1.9.2 Guided Slip-Tube Type2.1.10 Instrumentation2.1.10.1 Pressure and Vacuum Gages2.1.10.2 Tank Gages2.1.10.3 Indicating Thermometers2.1.11 Miscellaneous Pipeline Components2.1.11.1
8、Steam Meters2.1.11.2 Air Traps2.1.11.3 Steam Traps2.1.11.4 Strainers2.1.11.5 Exhaust Heads2.1.11.6 Hangers, Supports, Spacing Requirements, and Attachments2.1.11.7 Flash Tanks2.2 UNIT HEATERS2.3 CONVERTORS2.4 CONDENSATE RETURN UNITS2.4.1 Condensate Return Pumping Units2.4.2 Pump Motors2.4.3 Motor St
9、arters2.5 RADIATION UNITS2.5.1 Finned Tube Radiation Units2.5.2 Cast Iron Baseboard Radiation Units2.5.3 Convectors2.6 STEAM TO AIR HEATING COILSPART 3 EXECUTION3.1 INSTALLATION3.1.1 Piping3.1.1.1 Welding3.1.1.2 Brazing and Soldering3.1.1.3 Hangers and Supports3.1.1.4 Grading and Venting of Pipe Lin
10、es3.1.1.5 Pipe Sleeves3.1.1.6 Floor, Wall, and Ceiling Plates3.1.1.7 Flashing for Buildings3.1.1.8 Unions and Flanges3.1.1.9 Traps and Connections3.1.1.10 Connections for Future Equipment3.1.2 ValvesSECTION 23 22 26.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted wit
11、hout license from IHS-,-,-3.1.2.1 General3.1.2.2 Globe Valves3.1.2.3 Steam Pressure-Reducing Valves3.1.2.4 Valves for Radiators3.1.2.5 Safety Valves3.1.3 Pressure Gages3.1.4 Thermometers3.1.5 Steam Meters3.1.6 Strainers3.1.7 Equipment Foundations3.1.8 Equipment Installation3.1.9 Cleaning of System3.
12、1.10 Cleaning and Painting of Piping and Equipment3.1.11 Identification of Piping3.2 FIELD TESTS AND INSPECTIONS3.2.1 Field Inspections3.2.2 Field Tests3.2.2.1 Piping System3.2.2.2 Start-Up and Operational Test3.2.2.3 Extent of Field Tests- End of Section Table of Contents -SECTION 23 22 26.00 20 Pa
13、ge 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 22 26.00 20 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-23 22 26.00 20 (November 2009)UFGS-23 22 26.00 20 (April 2006)UFGS-15183N (September 19
14、99) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 23 22 26.00 20STEAM SYSTEM AND TERMINAL UNITS02/10*NOTE: This guide specification covers the requirements for provision of a complete steam system within the building including steam, condensate
15、, and terminal units for heating.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or
16、 not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended changes
17、to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: This guide specification does not include steam boilers, feedwater treatment equipment, or process steam terminal units, boiler feed, and blow-off piping.*NOTE: The following information shall be shown on the project drawings:1.
18、 Extent of work including point of connection of new work to existing2. General arrangement of the pipingSECTION 23 22 26.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. Valve locations4. Safety valve location, setting, pipe size, and
19、method of termination5. Valve clearances to permit proper valve operation in confined spaces6. Floor stand, chainwheel operator, and power operator locations, when required7. Floor stand details, when required8. Electrical or compressed air power supply for power operators, when required9. Expansion
20、 joints10. Instrumentation11. Condensate meters12. Steam and air traps13. Unit heaters, when required14. Convertors, when required15. Condensate return pumping units including pump capacity and electrical characteristics for the pump motor16. Radiation units including size and capacity17. Location w
21、here cold-springing is permitted18. Connections for future equipment, when required.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in t
22、his paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS23222600202010STEAMSYSTEMANDTERMINALUNITS 蒸汽 系统 终端 装置 PDF

链接地址:http://www.mydoc123.com/p-984800.html