1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 78 24.00 20 (August 2012)-Preparing Activity: NAVFAC SupersedingUFGS-01 78 24.00 20 (November 2011)UFGS-01 78 24.05 20 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2012*SECTION TABLE OF CONTENTSDIVISION
2、 01 - GENERAL REQUIREMENTSSECTION 01 78 24.00 20FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI)08/12PART 1 GENERAL1.1 GENERAL REQUIREMENTS1.2 DEFINITIONS1.2.1 Component Inventory Management Unit (CIMU)1.2.2 Real Property Inventory Equipment (RPIE)1.2.3 BOTH (Combined CIMU a
3、nd RPIE)1.2.4 Utility and Energy Management (UEM)1.2.5 Systems1.2.6 Computer Assisted Design and Drafting (CADD)1.2.7 eOMSI Spreadsheet Workbook1.2.8 Flat File1.2.9 KTR1.3 ORGANIZATION of eOMSI1.3.1 eOMSI Data Files1.3.2 eOMSI Document Files1.3.3 Order of Precedence of eOMSI Requirements1.3.4 Source
4、s of eOMSI Information1.3.5 Unified Facility Guide Specifications (UFGS) Operation and Maintenance Data Packages1.4 eOMSI MEETINGS1.4.1 eOMSI Start-Up Meeting1.4.2 eOMSI Development Meetings1.4.3 Field Validation Meetings1.4.4 Facility Turnover Meetings1.5 UNITS of MEASURE1.6 QUALIFICATIONS of eOMSI
5、 PREPARER1.7 SUBMITTALS1.8 SUBMITTAL FORMAT1.8.1 eOMSI Data Files1.8.2 eOMSI Document Files1.9 SUBMITTAL SCHEDULE1.9.1 eOMSI, Preliminary Submittal1.9.1.1 Preliminary eOMSI Submittal Review Duration1.9.2 100 percent - Prefinal eOMSI SubmittalSECTION 01 78 24.00 20 Page 1Provided by IHSNot for Resale
6、No reproduction or networking permitted without license from IHS-,-,-1.9.2.1 Prefinal eOMSI Submittal Review Duration1.9.3 eOMSI, Final Submittal1.9.3.1 Final eOMSI Submittal Translation1.10 FACILITY SYSTEMSPART 2 PRODUCTS2.1 DESCRIPTION OF WORK2.1.1 eOMSI DATA FILES2.1.1.1 Equipment Information2.1.
7、1.2 Non-Equipment Information2.1.2 eOMSI DOCUMENT FILES2.1.2.1 Facility Information2.1.2.2 Primary Systems2.1.2.3 Primary Systems Information2.1.2.4 Product and Drawing InformationPART 3 EXECUTION3.1 eOMSI TRAINING3.1.1 Training Plan3.1.2 Training Content3.1.3 Training Outline3.1.4 Training Video Re
8、cording3.1.5 Unresolved Questions from Trainees3.1.6 Validation of Training Completion3.1.7 Quality Control Coordination3.2 FIELD VALIDATION- End of Section Table of Contents -SECTION 01 78 24.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
9、-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 78 24.00 20 (August 2012)-Preparing Activity: NAVFAC SupersedingUFGS-01 78 24.00 20 (November 2011)UFGS-01 78 24.05 20 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2012*SECTION 01 78 24.00 20FACILITY
10、 ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI)08/12*NOTE: This guide specification covers the requirements for Electronic Operation and Maintenance Support Information (eOMSI).Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this g
11、uide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Comments, suggestions and recommended changes f
12、or this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).Use of electronic communication is encouraged.Brackets are used in the text to indicate designer choices or locations where text must be supplied by the designer.This guide specification includes tailo
13、ring options for NAVFAC Design-Build and Design-Bid-Build. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the resulting section to fit the project is still required.*NOTE: Use this section for Navy and Marine Corps projects and edit as
14、noted for Design-Bid-Build or Design-Build.This section includes the facility maintenance training previously located in Section 01 45 00.00 20QUALITY CONTROL.*SECTION 01 78 24.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*NOTE: Modify
15、 this specification section for facilities built on Marine Corp (MC) Bases. The Marine Corps uses a different version of the Computerized Maintenance Management System (CMMS) than Navy and may require different eOMSI Equipment and Non-Equipment Data than is listed in this specification. Marine Corps
16、 also has a different Public Works (PW) structure and may involve different Public Works (PW) structure and may involve different personnel in the review and quality assurance of the eOMSI Data and Documents.*NOTE: The construction requirements of this specification section require process changes f
17、or NAVFAC Capital Improvements and NAVFAC Public Works Business Lines. Contact the Product Line Manager Facilities Management and Sustainment Public Works Business Line at NAVFAC LANT for training on these modified roles and responsibilities.*NOTE: Before beginning to edit this section make the deci
18、sion whether the project is complex and requires a full electronic operation and maintenance support information (eOMSI) submittal or is simple and requires an abbreviated eOMSI submittal. The full eOMSI for complex projects contains the following eOMSI components:a. eOMSI Datab. eOMSI Document(1) F
19、acility Information.(2) Primary System Information.(3) Product and Drawing Information (includingshop drawings, utility schematics andcutoff locations, equipment tagging andvalve locations, and as-built drawings).The abbreviated eOMSI for simple projects contains the following eOMSI components:a. eO
20、MSI Datab. eOMSI Documents(1) Product and Drawing Information(including shop drawings, utilityschematics and cutoff locations,equipment tagging and valve locations).The majority of NAVFAC projects will be classified as simple, requiring the abbreviated eOMSI submittal.*NOTE: Determine the need for a
21、 full eOMSI for SECTION 01 78 24.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-complex projects or an abbreviated eOMSI for simple projects by considering the complexity of the systems that make up the facility. Full eOMSI requires faci
22、lity information and systems level information such as operation instructions and troubleshooting procedures because of the complexities of the HVAC, fire protection, and electrical systems. Complex projects are building types such as Operations buildings, Hangars, Maintenance facilities, Hospitals/
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS01782400202012FACILITYELECTRONICOPERATIONANDMAINTENANCESUPPORTINFORMATIONEOMSIPDF

链接地址:http://www.mydoc123.com/p-984697.html