1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 58 00 (August 2009)-Preparing Activity: NAVFAC SupersedingUFGS-01 58 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 58 00PROJECT
2、 IDENTIFICATION08/09PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.3.1 Rendering1.3.1.1 Preliminary One Line Drawings1.3.1.2 Final Rendering Sample1.3.1.3 Final Framed Rendering and Copies1.3.2 Facility Recognition Plaque1.4 PROJECT SIGN1.4.1 Project Identification Signboard (Navy)
3、1.4.1.1 Project Rendering1.4.2 Project Signboard (Air Force)1.4.3 Construction Project Signs (USACE)PART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -SECTION 01 58 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAV
4、FAC / AFCESA / NASA UFGS-01 58 00 (August 2009)-Preparing Activity: NAVFAC SupersedingUFGS-01 58 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION 01 58 00PROJECT IDENTIFICATION08/09*NOTE: This guide specification covers the requirem
5、ents for temporary signs for project identification.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective
6、project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.R
7、ecommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for AIR FORCE, AVIANO (Aviano Air Base Italy), NAVFAC Atlantic, and USACE. Selection or deselection of a tailoring option will include or exclude that option in the
8、 section, but editing the resulting section to fit the project is still required.*NOTE: Include the following on project drawings:1. Location of project sign.*PART 1 GENERAL1.1 REFERENCES*SECTION 01 58 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
9、 IHS-,-,-NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference fea
10、ture when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the pro
11、ject specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN WOOD PROTECTION ASSOCIATION (AWPA
12、)AWPA C1 (2003) All Timber Products - Preservative Treatment by Pressure ProcessesAWPA C2 (2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure ProcessesU.S. ARMY CORPS OF ENGINEERS (USACE)EP 310-1-6a (2006) Sign Standards Manual, VOL 1EP 310-1-6b (2006) Sign Standard
13、s Manual, VOL 2, Appendices*NOTE: Include the following Submittal and Quality Assurance paragraphs in all design-build projects and on other applicable projects where the Contractor must provide the rendering. *1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SU
14、BMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are alrea
15、dy marked with a “G”. Only delete an existing “G” if the submittal item is not SECTION 01 58 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the su
16、bmittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects usin
17、g the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy,
18、 Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Contro
19、l approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsPreliminary one line drawings
20、of project rendering; G; G, _preliminary drawing indicating layout and text content; G; G, _Sign Legend Orders; G; G, _SD-04 SamplesFinal rendering sample; G; G, _Final framed rendering and copies; G; G, _ Facility Recognition Plaque; G; G, _1.3 QUALITY ASSURANCE1.3.1 RenderingProvide the project re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0158002009PROJECTIDENTIFICATION 项目 选定 PDF

链接地址:http://www.mydoc123.com/p-984696.html