1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 20 00.00 20 (November 2011)-Preparing Activity: NAVFAC SupersedingUFGS-01 20 00.00 20 (August 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTIO
2、N 01 20 00.00 20PRICE AND PAYMENT PROCEDURES11/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 SCHEDULE OF PRICESEARNED VALUE REPORT1.3.1 Data Required1.3.2 Schedule Instructions1.3.3 Real Property Assets1.3.4 Schedule Requirements for HVAC TAB1.4 CONTRACT MODIFICATIONS1.5 CONTRACTORS INVOICE AND CO
3、NTRACT PERFORMANCE STATEMENT1.5.1 Content of Invoice1.5.2 Submission of Invoices1.5.3 Final Invoice1.6 PAYMENTS TO THE CONTRACTOR1.6.1 Obligation of Government Payments1.6.2 Payment for Onsite and Offsite MaterialsPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -SECTION 01 20 00.00
4、 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 20 00.00 20 (November 2011)-Preparing Activity: NAVFAC SupersedingUFGS-01 20 00.00 20 (August 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are
5、 in agreement with UMRL dated October 2011*SECTION 01 20 00.00 20PRICE AND PAYMENT PROCEDURES11/11*NOTE: This guide specification covers the requirements for payment instruction paragraphs required for use in all projects.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format S
6、tandard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information a
7、nd requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for NAVFAC LAN
8、T and NAVFAC PAC. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the resulting section to fit the project is still required.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the gui
9、de specification. The publications are referred to in SECTION 01 20 00.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the R
10、eference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be
11、deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.U.S. A
12、RMY CORPS OF ENGINEERS (USACE)EP-1110-1-8 (2009) Construction Equipment Ownership and Operating Expense Schedule1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the proj
13、ect. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be r
14、eviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “
15、G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “
16、PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.SECTION 01 20 00.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Choose the first bracketed item for Navy, Air Force and NASA pr
17、ojects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation ident
18、ifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction Submittals*NOTE: When a cost-loaded Network Analysis Schedule (NAS) is included in the project, the information required
19、 by this Section for the Schedule of Prices will be an integral part of the cost-loaded NAS. In this case, delete the requirement for the submittal of the Schedule of Prices and substitute the requirement for the submittal of the Earned Value Report. Edit the remainder of the section appropriately.
20、*Schedule of PricesEarned Value Report; G1.3 SCHEDULE OF PRICESEARNED VALUE REPORT1.3.1 Data RequiredThis contract requires the use of a cost-loaded Network Analysis Schedule (NAS). The information required for the Schedule of Prices will be entered as an integral part of the Network Analysis Schedu
21、le. Within 15 _ calendar days of notice of award, prepare and deliver to the Contracting Officer a Schedule of Pricesan Earned Value Report (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various ki
22、nds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.1.3.2 Schedule InstructionsPayments will not be made until the Schedule of PricesEarned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contract
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS01200000202011PRICEANDPAYMENTPROCEDURES 价格 付款 规程 PDF

链接地址:http://www.mydoc123.com/p-984683.html