NAVY NAVSEA T9074-AT-GIB-010 2032-2002 EDDY CURRENT INSPECTION OF HEAT EXCHANGER TUBING ON SHIPS OF THE UNITED STATES NAVY《美国海军船舶上的热交换管的涡电流检测》.pdf
《NAVY NAVSEA T9074-AT-GIB-010 2032-2002 EDDY CURRENT INSPECTION OF HEAT EXCHANGER TUBING ON SHIPS OF THE UNITED STATES NAVY《美国海军船舶上的热交换管的涡电流检测》.pdf》由会员分享,可在线阅读,更多相关《NAVY NAVSEA T9074-AT-GIB-010 2032-2002 EDDY CURRENT INSPECTION OF HEAT EXCHANGER TUBING ON SHIPS OF THE UNITED STATES NAVY《美国海军船舶上的热交换管的涡电流检测》.pdf(49页珍藏版)》请在麦多课文档分享上搜索。
1、NAVSEA Technical Publication EDDY CURRENT INSPECTION OF HEAT EXCHANGER TUBING ON SHIPS OF THE UNITED STATES NAVY PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND Revision 1 22 MAY 2002 I IlIll IlIlIl Ill11 IlIll IlIll 11l11ll IlIll Ill IlIll IlIll IlIll IlIll IlIll IlIll IlIl IlIll IlI
2、l *O91 OLP7314800* Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-T9074-AT-GlB-0 10/2032 NAVSEA TECHNICAL PUBLICATION CERTIFICATION SHEET 1 of1 Certifi
3、cation Applies to: New Document 0 Revision Change 0 Applicable TMINSPub. No. T9074-AT-GIB-010/2032 Publication Date (Mo, Da, Yr) MAY 22,2002 Title: EDDY CURRENT INSPECTION OF HEAT EXCHANGER TUBING ON SHIPS OF THE UNITED STATES NAVY CHANGES AND REVISIONS: Purpose: This publication is revision 1 of th
4、e original. NAVSEA procedure ECTIP- 1 is now included as appendix B. Also, several technical changes were made including a caution on data trending, an additional requirement for setting the phase rotation for the calibration setup, a relaxation in the calibration standard wall thickness tolerance s
5、pecification, and deletion of the requirement to report ET data from the calibration standard pulls on the data disk report form. MDER/ACN Numbers Incorporated: N/A Zontinue on reverse side or addpages as needed. CERTIFICATION STATEMENT rhis is to certi that responsible NAVSEA activities have review
6、ed the above identified document For technical adequacy and suitability for the intended use. This form is for internal NAVSEA nanagement use only, and does not imply contractual approval or acceptance of the technical mblication by the Government. Philadelphia, PA 191 11-5094 (215/697-1456) Provide
7、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-REVISION NO. O 1 T9074-AT-GIB-010/2032 RECORD OF REVISIONS DATE ENTERED BY 1 May 2000 Original issue 22 May 200
8、2 NAVSEA 05 Rev. 1 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Rev. 1 ii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-CONTENTS ParaqraDh Paqe 1. 1.1 2. 2.1 2.1.1 2.1.2 2.2 2.3 3. 3.1 3.2 3.3
9、3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.21.1 3.21.2 3.21.3 3.21.4 3.22 4. 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.6.1 4.1.6.2 4.1.6.3 4.1.6.4 4.1.6.5 4.1.7 4.2 4.2.1 SCOPE 1 General 1 APPLICABLE DOCUMENTS 1 Government documents 1 Specifications, stan
10、dards, and handbooks 1 Other government documents, drawings, and publications . . 1 Non-Government publications 2 Order of precedence 2 DEFINITIONS . 2 Absolute mode 2 Calibration . 2 Calibration standard 2 Coil . 2 Defect 2 Differential mode 2 Fill factor . 3 Gain . 3 Inspection activity 3 Noise 3
11、Obstructed tube . 3 Permeability variation 3 Phaseanalysis 3 Phase angle . 3 Plugged tube . 3 Probe 3 Probe motion or probe wobble 3 Signal mix 3 Signal-to-noise ratio 4 Test and inspection 4 Thinning . 4 General thinning . 4 Localized thinning 4 Non-uniform thinning 4 Uniform thinning . 4 Vector an
12、alyzer . 4 GENERAL REQUIREMENTS 4 Equipment 4 Multi-frequency eddy current instrument 4 Strip chart . 5 Magnetic media storage device 5 Probe puller 5 Probes 5 Calibration standards 5 ASME type calibration standard 6 Thinning standard 6 Tapered area sensitivity standard 6 Slotted standard . 6 Option
13、al discontinuity-free standard 6 Borescope 6 Procedure 6 Procedure qualification 7 . . . . . . . . . . . . . . Rev. 1 iii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-T9074-AT-GIB-010/2032 4.3 5 . 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.2 5.2.1 5.2.2 5.2.2.
14、1 5.2.2.1.1 5.2.2.1.2 5.2.2.2 5.2.2.3 5.2.3 5.2.4 5.2.5 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6 5.4 5.4.1 5.4.1.1 5.4.1.2 5.4.1.3 5.4.1.4 5.4.1.5 5.5 6 . 6.1 6.2 6.3 Fiqure Personnel 7 DETAILED REQUIREMENTS 7 Heat exchanger inspection preparation 7 Heat exchanger design review 7 Tubecleaning 7 Tube
15、identification 7 Extent of inspection 8 Eddy current inspection procedure 8 Equipment 8 Calibration techniques 8 Differential mode probe calibration 8 90-10 CuNi material 8 Absolute mode probe calibration . 11 Special probe calibration for crack detection 11 Recalibration 12 Noise interference 12 Sp
16、ecial requirements for titanium tubes . 12 Inspection techniques 12 Detection of local volumetric defects 12 Detection of thinning 12 Detection of cracks . 13 Detection of denting . 13 Evaluation of permeability variations 13 Obstructed tubes . 13 Reporting and record requirements 13 Reporting 13 In
17、spection summary cover letter . 13 Detailed test parameters . 14 Detailed inspection results . 14 Tube sheet diagrams . 14 Metallographic or metallurgical reports . 15 Maintenance of inspection records 15 NOTES 15 Intendeduse . 15 IssueofDODISS . 15 Subject term (key word) listing . 15 . . . . . . A
18、ll materials except 90-10 CuNi material 9 FIGURES Paqe 1 . ASME type calibration standard with typical signal presentation . . 16 2 . 360-degree machined ring standard . 17 3 . Milled flat thinning standard . 18 4 . Tapered area sensitivity standard . 19 5 . Slotted standard 20 6 . Typical defect ev
19、aluation curve for phase angle analysis 21 7 . Typical absolute mode calibration curve for wall thinning . 22 Rev . 1 iv Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Armendix APPENDICES A. Format for reporting eddy current inspection data . . . .
20、. . . B. Eddy Current Inspection Supplemental Requirements . . . . . . . Pacre 23 29 Rev. 1 V Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1. SCOPE 1
21、.1 General. This standard provides the minimum requirements (unless otherwise specified) to conduct the eddy current inspection of nonferromagnetic tubing in heat exchangers on Navy ships. In this document, the term “heat exchanger“ applies to condensers, reboilers, etc. Minimum requirements are spe
22、cified for inspection personnel, equipment, procedures, evaluation, and reporting of results. 1.2 Data Trendinq. A review of comparative inspections of the same heat exchanger by different inspection activities has concluded that there is a relatively large amount of inspection variability in the re
23、sults. Caution should be used when using the data generated with the procedures in this document for trending of the tube degradation. A comprehensive, statistical study of inspection consistency would be required to quantify the inspection variability. 2. APPLICABLE DOCUMENTS 2.1 Government documen
24、ts. 2.1.1 Specifications. standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specif
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYNAVSEAT9074ATGIB01020322002EDDYCURRENTINSPECTIONOFHEATEXCHANGERTUBINGONSHIPSOFTHEUNITEDSTATESNAVY

链接地址:http://www.mydoc123.com/p-984258.html