NAVY MIL-T-85239 A-1990 TRAILER MUNITIONS MHU-151 M《MHU-151 M弹药拖车》.pdf
《NAVY MIL-T-85239 A-1990 TRAILER MUNITIONS MHU-151 M《MHU-151 M弹药拖车》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-85239 A-1990 TRAILER MUNITIONS MHU-151 M《MHU-151 M弹药拖车》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、IINCH-POUrn I MIL-T-85239 A (AS 1 20 Nov 1990 SUPERSEDES 15 Sept 1978 MI L-T-85239 (AS) MILITARY SPECI FICATION TRAILER, MUNITIONS, MHU-l51/M This specification is approved for use by the. Naval Air Systems Command, Department of the Navy and is available for use by all Departments and Agencies of T
2、he Department of Defense 1. SCOPE 1.1 Scope. This specification establishes the requjrements for a munitions trailer designated as MHU-l51/M 2. APPLICABLE DOCUMENTS 2.1 Government documents . * 2.1 .1 Specifications and standards. The following specifications and standards form a part of this docume
3、nt to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specificstions and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2) SPECI FICATIONS Mi 1 i tary MIL- L- 2 104
4、 - Lubricating Oil Internal Combustion Engine MI L-G- 10924 - Grease, Automotive and Artillery MIL-1-45208 - General Specifications for Inspection Requirements . Benefecial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should b
5、e addressed to: Systems Engineering and Standardization Department (Code 53) Naval Air Engineering Center, Lakehurst, NJ 08733-5100 by using Standard- zation Document Improvement Proposal (DD Form 1426) appearing at the end of this document or bv letter. L AMSC N/A FSC 2330 DISTRIBUTION STATEMENT A.
6、 Approved for public release; distribution is un1 imited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-T-85237A 23 m 777790b 0465727 7 m STANDARDS Mi 1 i tary MI L-STD- 129 - Marking for Shipment and Storage MI 1 -STD-281 MIL-STD-831 - Test
7、Reports, Preparation of (Unless otherwise Indicated, copies of federal and mill tary specifications - Automobi les, Trucks, Trucks-Tractors , and Trai 1 er Dol 1 i es ; Preservation and Packagi ng of and standards are available from the standardization Documents Order Desk, Bullding 4D, 700 Robbins
8、Avenue, Philadelphia, PA 19111-5094 2.1.2 Other Government Drawinss. The following other Government drawings form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS (NAVAL AIR SYSTEMS COMMAND) DLll93ASlOO - Tra
9、ller, Munitions (and all documents listed therein) (Copies of specifications, standards, and drawings required by suppliers in connection with speciflc procurement functions, should be obtained from the procuring activity or as directed by the Contracting Officer.) 2.3 Order of precedence. In the ev
10、ent of conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in thi s document, however, supersedes appl i cable 1 aws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS * 3.1 Flrst article. When sp
11、ecified (see 6.21, a sample shall be subjected to first article inspectlon(see 6.4) in accordance with 4.4. The first article sample shall be manufactured by the same procedures and processes, and at the same locatlon as proposed for the balance of the contract production. 3.2 Design and Constructio
12、n 3.2.1 Construction. The trailer shall be manufactured in accordance wi th Data List 1193AS100 and all documents listed thereon. * 3.2.2 Welding. All welding shall be in accordance with the standards required by the appl icable drawings. * 3.2.2.1 Welders. Welding shall be performed by personnel pr
13、esently qualified to the requirements of the appllcable drawings or lubricating oi 1 MIL-L-2104 as appl icable. 3.2.3 Lubrlcation. The trailer shall be lubricated with grease MIL-G-10924, 3.3 Performance Requirements, The trai ler specified herein shall be capable of transporting various munitions o
14、n unimproved roads or in an enviroment as encountered in an expeditionary airfield. The mobility of the trailer shall not be limited by any side slope of up to eight degrees angle. This trailer may be towed either by Its drawbar or be manually moved as desired. Its lighting and braking systems shall
15、 provide the necessary features required during mob1 1 i ty. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.1 Proof Load. The trailer, when supported by its running gear, shall withstand a proof load of 6,000 +loo/-O pounds. 3.3.2 Brake System
16、. 3.3.2.1 Parking Brakes. The parking brakes shall be capable of holding the trailer, loaded with a 3,000 +loo/-O pound test load, on a T5“ +5/-O grade in either direction. 3.3.2.2 Service Brakes, The service brakes shall be capable of stopping the trailer, loaded with a 3,000 +loo/-O pound test loa
17、d, within 30 feet when traveling at 20 miles per hour, on level, dry concrete. 3.3.2.3 Manual Brake System. The trailers service brake shall be equipped with a hand grip lever to facilitate manual operation of the service brake while under tow. The service brake system shall also be equipped with a
18、cable capable of automatically operating the manual brake lever thereby bringing the trai ler to a halt in the event that the drawbar should break away from the prime mover. 3.4 Towing Force. The towing force required to move the trailer from rest on smooth, dry, level, paved surface, such as brushe
19、d concrete, shall not exceed 100 pounds measured at the drawbar. 3.5 Workmanship. The trailer shall be fabricated in accordance with the drawings and shall be assembled to meet the performance requirements of the specifications. 3.5.1 Hardware and Equipment. Equipment having missing, inoperative, de
20、fective, bent, broken, or otherwise damaqed Darts, will not be acceDtable. The installation of-hardware parts, such as cakhes, pins, handles, nuts, bolts, etc. shall be accomplished in such a manner as to avoid damaging the hardware or the mounting surface. Screws, nuts, and bolts showing cross thre
21、ading, mutilation, detrimental or hazardous burrs shall not be acceptable. 3.5.2 Electrical Installation. Insulated wires shall be formed into cables or ducted whenever possible. Wires, cables, and brake lines shall be routed and positioned in a protective manner to avoid contact with rough or irreg
22、ular surfaces and sharp edges. 3.5.3 Weldments. There shall be no evidence of burn through. Angular or thickness misal lignment, warpage, or dimensional change due to heat from the welding operation shall be within permitted tolerances. There shall be no damage to adjacent parts resulting from weldi
23、ng. The quality of all welds shall conform to the appl i cable drawings. 4. QUALITY ASSURANCE PROVISIONS * 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations a
24、nd tests) as specified herein. otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless di sapproved by the Government. Government reserves the right to perform a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT85239A1990TRAILERMUNITIONSMHU151MMHU151M 弹药 拖车 PDF

链接地址:http://www.mydoc123.com/p-982938.html