NAVY MIL-T-18404-1955 TORPEDOES ENVIRONMENTAL REQUIREMENTS GENERAL SPECIFICATIONS FOR《通用技术条件下鱼雷环境要求》.pdf
《NAVY MIL-T-18404-1955 TORPEDOES ENVIRONMENTAL REQUIREMENTS GENERAL SPECIFICATIONS FOR《通用技术条件下鱼雷环境要求》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-18404-1955 TORPEDOES ENVIRONMENTAL REQUIREMENTS GENERAL SPECIFICATIONS FOR《通用技术条件下鱼雷环境要求》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、MILT -18404 (Kord) 25 January 1955 MILITARY SPECIFICATION TORPEDOES, ENVIRONMZNTAL REQUIRdhENTS ; GENERAL SPECIFICATION FOR 1, SCOPE 1.1 Scope. - This specification covers the general environmental re- quirements for the deaign, development, evaluation and laboratory testing of torpedoes. This speci
2、fication sets forth the environmental limits within which torpedoes, related componente, and associated equipment must operate satisfactorily and reliably. The detailed performance and teat require- ments for a particular torpedo, particular components, or associated equip- ment shall be a8 defined
3、in the detailed specfcationa. 2. APPLICABM DOC- MIL-S-901 - Shockproof Equipment, Class Hl (High Impact), Shipboard Application Tests for. MIL-A-8591 - Airborne Stores and Associated Suspension Equipment; General Design Criteria for. 3. REQUIREMENTS 3.1 Definitions. - For the purpoae of this specifi
4、cation the folIawing definition8 will apply. 3.1.1 Torpedo, - Torpedo ehall man the weapon in an asaembled atate, related components, or associated equipment. 3,l.z Related components. Related components are the aeeemblies, aub-assemblies and parta which comprise the torpedo. 3.1.3 Associated equipm
5、ent. - Aaeociated equipment i5 that equipment appended to the torpedo for carryinT-s-oI. 3.1-7 Acceleration (steady state) . - Acceleration (ste over the frequency range of 20 to 150 cps. These vibrations my occur in any direction. 3.2.2 Shock 3.2.2.1 - Torpedo non-operating . ready non-operating or
6、 ready (trana- portatiori. - The torpedo .shall be capable of performing according to the individual specification after being subjected to repeated shock pulaes, as specified in 4.4.2.3, of (a) 69g. peak magnitude: not leas than 8 ms dur- ation, and with a pulae shape approxi.mting a one-half sine
7、wave, or (b) test procedures as outlined irr MIL-S-901 for medium-weight equipmnt; this equipment generates shocks which, in general, produce conditions enabling the torpedo to withstand natural service environments, but are not faithful reproductions of service shock a torpedo will encounter. 3.2.2
8、.2 Torpedo ready or operating - The torpedo shall be capable of performing according to the individual apecification during or after experiencing-the applicable water-entry ahock as listed below and as speci- fied in 4.4.2.3. (a) Submerged tube launching - no additional ahock requirement. (b) Deck l
9、aunching .- 60g peak magnitude, not lesa than 8 me pulse duration, and approximating a one-half sine wave pulse. (c. Air-borne launching with external attachments auch a6 psrachutos, none coverings, etc. - 1506 peak magnitude, not less than 8 ms pulse duration, and approximting a one-half aine wave
10、pulse. (a) Air-borne launching without external attachments - 25043 peak magnitude, not leas than 8 ms pulse duration, and approximating a one-half sine wave pulse. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.3.1 Torpedo ready non-sprrting, r
11、eady or operating. - Torpedoes designed for tube or reck hunchfniTor for use on catapult launched or arrested landed sireaft, OR with misailea using booster take-off, or torpedoes arrested by W gsssaehu%e opening in flight, aha11 be capable of performing accordkng to the fnd$vidual spwiiication afte
12、r experiencing acceleration of l5g applied for no% leas than 0.2 sec. aa apecifitd in 4.4.3. 3.2.4 Tenperature “_ and hum%di%y. 3.2.4.1 Torpedo non-operating . - The torpedo shall be capable of per- forming accor-l apecificatioc after experiencing trana- portatf.on and storage temperatures and humfd
13、itiee between -65O. and 16oo. for 28 aery8 a epeeiffed in 4-4.4.1. 3.2.4.2 P“. Torpedo ready - - non-operat hg - . 3.2.4.2.1 Surface and uradervar;er launched. - Torpedoes launched from surface crgft, OF surface launched desilea or torpedoea launched under- water shall be capable of performing accor
14、ding to the individual specifi- catior? over the tempel-ature range o% -20F. to /l3O%?. as specified in 4.4.4.2.1.1 and 4.4.4.3.1. 3.2.4.2.2 Air launched. - Torpedoes launched from aircraft or air- launched mlssilcapab1e of performing according to the Individual epeeificatisn over the tempcseture ra
15、nge of pable of performing according to the nu-vidual specification after .or during exposure to pressure of 6UO pia as .specified in 4.4.5.3. specification -+ af er exposure to huidlty of 9% Bo speclfled in 4.4.4,l. 3.2.6 Humldlt - The torpladb shall perfo 6Og i 6g peak ma.gnitude, not less than 8
16、ms pulse duration, and approxhting a one-half sine wave, or the test procedures defined in MILLS-901 for medium-might equipnt . peak magnitude, not less than 8 ma pulse duration, and approximaing a one-half sine wave. (c) Water entry after air launching without external attachments; 25Og - * 25g pea
17、k magnitude, not less than 8 ms pulse duration, and approxi- mating a one-half sine wave. (b) Water entry after air launching with external attachments; l5Og f l5g 4.4.3 Acceleration (stesdy state) test procedure 4*4a3*1 “ - The torpedo shall be mounted on the testing device to simulate as re istica
18、lly as possible the service installation including shock isolators or mounting devices, if any, as specified in the individual specification. 4.4.3.2 Direction of test. - Acceleration (steady state) tests shall be conducted along the axes specified in 3 .L14 and in the following directions: t a) Axi
19、s a, inertia load forward: arrested landing and parachute opening. b) Axis e, inertia load aft: catapult launched, tube launched, and booster launched. launched, exrested landing, and parachute opening. (c) Axes b and c, inertia load both directions: rack launched, catapult 4- x= . . %* , shall be p
20、erformance checked. 4.4.4,2.2.3 Submarine launched. - The torpedo shall be placed in a test chamber whose temperature shall be lowered to +28oF . f 59. and maintained at this temperature for a period of h8 hours t 5 hours. At the end of this test period the torpedo, while still at the test temperatu
21、re of + period, the torpedo shall be removed and allowed to cool to room temperature and performaace checked. 4.4.8 Tropical enviromnt . - The tropical environmental tests on the, torpedo shall be made with all access covers removed. Drying or wiplng prior to performance checking shall not be done.
22、4.4.8.1 Torpedo non-operat3ag or ready nm-operating. - The torpedo, Including applicable ex%ernal connections, shall be placed in a mold chauWr maintaining an internal temperature of 86oF. f: 5%. and a relative humidity of 90 percent 5 percent and sprayed with the suspension of mixed SpOIWS. These c
23、onditions shitll be maintahad for twenty-eight (28) days. At the conclusion of the test, the torpedo sbbl be allowed to return to roan temperature before prformncs checking. At least five groups of fungi shall be used in torpedo inoculation. Five groups of fungi are lis- Provided by IHSNot for Resal
24、eNo reproduction or networking permitted without license from IHS-,-,-below, and one typ of fungus from each group shall be used. In preparing the spore suspension, distilled water having a pH value between 5.8 and 7.2 at 77W . ) shall be prepared by sterilization in convenient containers (approximt
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT184041955TORPEDOESENVIRONMENTALREQUIREMENTSGENERALSPECIFICATIONSFOR 通用 技术 条件下 鱼雷 环境 要求 PDF

链接地址:http://www.mydoc123.com/p-982541.html