NAVY MIL-STD-1320-1-1975 TRUCKLOADING OF HAZARDOUS MATERIALS PALLETIZED UNIT LOADS SINGLE ROW PATTERN《军火和危险物品托盘化组合和单行排列装车》.pdf
《NAVY MIL-STD-1320-1-1975 TRUCKLOADING OF HAZARDOUS MATERIALS PALLETIZED UNIT LOADS SINGLE ROW PATTERN《军火和危险物品托盘化组合和单行排列装车》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-STD-1320-1-1975 TRUCKLOADING OF HAZARDOUS MATERIALS PALLETIZED UNIT LOADS SINGLE ROW PATTERN《军火和危险物品托盘化组合和单行排列装车》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、, I MIL-STD-1320 -I 81 W 7777731 0070074 T MI LITA RY STAN DARD MIL-STD-1320-1 (NAVY) TRUCKLOADING OF HAZARDOUS MATERIALS PALLETIZED UNIT LOADS SINGLE ROW PATTERN 29 JANUARY 1975 SUPERSEDING WE-SIAA 22 AUGUST 1967 NOTES: I. 2. UNLESS OTHEREIISE SPECIFIED DIMENSIONS ARE IN INCHES. FOR CROSS REFERENCE
2、 TO ASSOCIATED PALLETIZING, COMAINER LOADING AND CARLOADING MILITARY STANDARDS. REFER TO INDEX TO STANDARDS, MIL-HDBK-236. INDEX PAGE FTL PROCEWRE SINGLE LAYER) 28.3 FIL PROCEWRE (MULTI-LAYER) 485 - ITEM GENERAL NOTES 2 LTL ALL LENGTH TRAILERS 6 FILLER ASSEFABLY DETAILS 7 UNITIZING DETAIL 8 I8140 II
3、 AUTHORIZED AND RELEASED FOR HIGHWAY SHIPMENTS ONLY ?.- L$,. NAIL FF-N-103, TYPE II, STME IO COMMON BRIGHT; STRAPPING QQ-S-781, TYPE I, CLASS A. FOR GENERAL TRUCKLOADING PROCEDURES, REFER TO THE GENERAL TRUCKLOADING DOCUMENT, MIL-STD-1320 (NAW. 2. 3. 4. 5. 6. 7. 8. 9. PROCEDURE (SINGLE LAYER) I. THE
4、 LOAD SHOWN ON PAGE 3 IS INTENDED TO ILLUSTRATE TYPICAL BLOCKING AND BRACING PROCEDURES FOR A SINGLE LAYER LOAD IN A WOOD FLOOR TRAILER. FOR TRAILERS WITH METAL FLOORS OR METAL FLOOR WITH WOOD NAILING STRIPS, USE THE APPROPRIATE ALTERNATE BLOCKING METHOD (SEE NOTE 3 BELOW). (WAR“O1 Do NOT NAIL BLOCK
5、ING OR BRACING INTO METAL FLOORS. WHEN THE CHARACTERISTICS OF THE UNIT LOAD PREVENTS NAILING SLEEPERS, PIECE 4, TO THE TRAILER FLOOR, USE A FILLER ASSEMBLY, DETAIL L OR M PAGE 7, AS APPROPRIATE, ON EACH SIDE OF THE UNIT LOAD. WHEN THE TRAILER HAS METAL FLOORS OR METAL FLOORS WITH NAILING STRIPS AND
6、THE STRIPS ARE NOT IN THE DESIRED LOCATION, USE A FILLER ASSEMBLY, DETAIL L OR M PAGE 7, AS APPROPRIATE, ON EACH SIDE OF THE UNIT LOAD. THE TYPE OF REAR BLOCKING TO BE USED IS DEPENDENT UPON THE DISTANCE BETVEEN THE TRAILER DOORS, WHEN CLOSED, AND THE REAR OF THE LADING. 2. 3. 4. DISTANCE LESS THAN
7、12 INCHES INSTALL REAR BLOCKING ASSEMBLY, DETAIL 8, AS SHOWN ON PAGE 3. 1 CAUTION I REAR BLOCKING MUST BEAR AGAINST LADING AND TRAILER DOORS WHEN DOORS ARE CLOSED. Do NOT USE TRAILERS WITH ROLL UP DOORS. DISTANCE 12 TO 36 INCHES INSTALL REAR BLOCKING ASSEMBLY, DETAAIL E PAGE 4, AS SHOWN ON PAGE 5. R
8、EAR BLOCKING MUST BEAR AGAINST LADING AND TRAILER DOORS WHEN DOORS ARE CLOSED. DO NOT USE TRAILERS WITH ROLL UP DOORS. DISTANCE GREATER THAN 36 INCHES INSTALL REAR BLOCKING AS SHOWN IN TYPICAL LTL, PAGE 6. DO NOT USE TRAILERS WITH ALL METAL FLOORS. 5. FILLER ASSEMBLIES SHALL FILL THE VOID BEWEEN THE
9、 UNIT LOAD AND TRAILER SIDEWALL. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-1320 -1 1 7777711 007007b 3 MIL-STD-1320-1 (NAVY) REAR BLOCKING ASSEMBLY 1 REQUIRED DETAIL 0 FRONT BULKHEAD 1 REQUIRED THIS DRAWING ILLUSTRATES A LOAD WHEN THE D
10、ISTANCE BEWEEN HE LADING AND THE TRAILER DOORS IS 12 INCHES ORLESS. SEE PROCEDURE NOTE 4 FOR DETAILED INSTRUCTIONS FOR THIS AND OTHER CONFIGURATIONS. 2 x 4 DOUBLED. NAIL 151 PIECE TO TRAILER FLOOR W/6-16d NAILS. NAIL ZND PIECE TO IST INLIKE MANNER. ihi SEE NOTES 2 6 3 I ow SECTION C-C *nv = TRAILER
11、WIDTH Zx4TOSUIT SOLID FILL SLEEPER SEE SECTION C-C 2 4X4X I VERTICAL UNITLOAD HEIGH - I - NO.KS NAIL I NAILS REQD TO SIZE IECE NO. DESCRIPTION I UST OF MATERIALS AND NAIUNG DATA FTL SINOLE LAYER (ALL LENGTH TRAILERS) PAGE 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without
12、 license from IHS-,-,-MIL-STD-1320-1 (NAVY) PROCEDURE (MULTI-LAYER) I. THE LOAD SHOWN ON PAGE 5 IS INTENDED TO ILLUSTRATE TYPICAL BLOCKING AND BQACING PROCEDURES FOR A TVO LAYER LOAD IN A TRAILER WITH ANY TYPE FLOOR (WOOD, METAL OR METAL WITH WOOD NAILING STRIPS). TO PREVENI LONGITUDINAL MOVEMENT IN
13、 THE SECOND (AND THIRD) LAYER(S) WHERE THE LAYER CHANGES FROM WO LAYERS TO ONE LAYER HIGH (OR THREE LAYERS TO TWO LAYERS HIGH) AND AT THE REAR OF THE LOAD WHEN TWO OR MORE LAYERS HIGH, THE UNIT LOADS SHALL BE UNITIZED AS SHOWN ON PAGE 8. THE STIFFENERS SHALL BE POSITIONED TOWARDS THE LOWER UYER(S) O
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILSTD132011975TRUCKLOADINGOFHAZARDOUSMATERIALSPALLETIZEDUNITLOADSSINGLEROWPATTERN 军火 危险物品 托盘 组合

链接地址:http://www.mydoc123.com/p-981838.html