NAVY MIL-R-85895-1988 RACK BOMB EJECTOR AIRCRAFT BRU-32 A《BRU-32 A飞机喷射器及炸弹机架》.pdf
《NAVY MIL-R-85895-1988 RACK BOMB EJECTOR AIRCRAFT BRU-32 A《BRU-32 A飞机喷射器及炸弹机架》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-85895-1988 RACK BOMB EJECTOR AIRCRAFT BRU-32 A《BRU-32 A飞机喷射器及炸弹机架》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-R-85895(A$: 28 MARCH 1988 MILITARY SPECIFICATION RACK, BOMB EJECTOR, AIRCRAFT BRU-32/A This specification is approved for use within the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. 1. 1.1 man1 SCOPE Sco
2、pe. This specification establishes the requirements for the dfacture, testing, and acceptance of the BRU-32A bomb rack capable of carrying, releasing, and ejecting stores having suspension lugs spaced 14 inches and 30 inches apart. The BRU-32A bomb rack shall be utilized for carrying and forced ejec
3、tion release of stores weighing from 500 pounds to 2,600 pounds. The test units in this Specification define minimum acceptable requirements. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Comm
4、anding Officer, Naval Air Engineering Center, Systems Engineering and Standardization Department (SESD) Code 93, Lakehurst, NJ 08733-5100, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1095 ,
5、Distribution Statement A. Approved for public release; distribution is unlimited THIS DOCUMENT CONTAINS “-1 7 PAGES. 7- Licensed by Information Handling ServicesMIL-R-85895 (AS) 2. APPLICABLE DOCUMENTS 2.1 Government Documents 2.1.1 Specifications and Standards. The following specifications and stan
6、dards form a. part. of this specifica.tion to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation. SPECI
7、FICATIONS Military MIL-W-5088 MIL-T-7743 MIL-C-81842 MIL-H-85042 MIL-A-85046 MIL-A-85836 STANDARDS Military DOD-STD-100 MIL-STD-129 MIL-STD-130 MIL-STD-143 MIL-STD-461 Wiring, Aerospace Vehicle Testing, Store Suspension, and Release Equipment, General Specification for Connector Assemblies for Bomb
8、Rack Electric Fuzing Provisions Hooks, Bomb Rack, General Specification for Actuator, Linear, Electromechanical Arming Unit, Zero Retention Force Engineering Drawing Practices Marking for Shipment and Storage Identification Marking of U.S. Military Property Standards and Specifications, Order of Pre
9、cedence for the Selection of Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference Y MIL-STD-704 MIL-STD-794 Aircraft Electric Power Characteristics Parts and Equipment, Procedures for Packaging of 2 P Licensed by Information Handling ServicesMIL-R-
10、85895 (AS) MIL-STD-831 Test Reports, Preparation of MS-3314 Lug, Suspension, (1,000 lb. Class) Airborne Equipment MIL-B-5087 Bonding, Electrical, and Lightning Protection, for Military Aircraft 2.1.2 Drawings. The following drawing forms a part of this specification to the extent specified herein un
11、less otherwise specified, the issue shall be that in effect on the date of the solicitation. Naval Air Systems Command 1380540 Lug, Suspension, MK-3 Mod O (copies of specifications, standards, and drawings required by contractors in connection with specific acquisition functions should be obtained f
12、rom the contracting activity or as directed by the contracting activity.) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this s
13、pecification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order, a sample(s) shall be subjected to first arti
14、cle inspection (see 4.3 and 6.3.1) 3.2 Selection of specifications and standards. Specifications and standards for necessary commodities and services not specified herein shall be selected in accordance with the requirements of MIL-STD-143. 3.3 Interchangeability. All parts having the same part numb
15、er shall be directly and completely interchangeable with each other with respect to installation and performance. 3.4 Identification and marking. All parts shall be marked as specified on the drawings for the bomb rack (see 3.5.1); or in accordance with MIL-STD-130, if not specified on the drawings.
16、 The item identif.ication and part number requirements of DOD-STD-100 shall govern the part number and changes thereto. 3.5 Bomb Rack.- 3.5.1 Construction. The construction of the bomb rack shall be in accordance with the drawings listed in the data list for the bomb rack being procured and as speci
17、fied in the contract. 3 Licensed by Information Handling ServicesMIL-R-85875 LO W 7799706 0366L8L L MIL-R-85895 (AS) 3.5.2 Performance. The bomb rack shall meet the performance 0 requirements when subjected .to the following tests in the order specified in Tables I and II. a. b. C. d. e. f. g* h. i.
18、 j* k. 1. m. n. O. P* q* r. S* t. U. Bomb rack inspection (see 4.6.1) Functional (see 4.6.2) Arming unit (see 4.6.3) Electric fuze arming. (see 4.6.4) Manual operation (see.4.6.5.1) Electrical characteristics (see 4.6.5.2) Electromagnetic compatibility (see 4.6.5.3) Lag time determination (see 4.6.5
19、.4) Icing (see 4.6.5.5) Shock (see 4.6.5.6) Vibration (see 4.6.5.7) Sand (see 4.6.5.8) Temperature shock (see 4.6.5.9) High-g (see 4.6.5.10) Life (see 4.6.5.11) Stress corrosion (see 4.6.5.12) Humidity (see 4.6.5.13) Fungus (see 4.6.5.14) Lock shut firing (see 4.6.5.15). Static test (see 4.6.5.16) S
20、alt spray/altitude (see 4.6.5.17) 3.6 Requirements for parts. 3.6.1 Hooks. The construction and inspection of the hooks shall be in accordance with MIL-H-85042. Prior to installation into bomb racks, the hooks shall have met all of the first article and sampling requirements of MIL-H-85042. Licensed
21、 by Information Handling ServicesMIL-R-85895 (AS) 3.6.3 Mechanical Fuze Arming Unit. Two mechanical fuze arming units shall be in accordance with MIL-A-85836. 3.6.4 Electrical Fuze Arminq Unit, Electrical fuzing shall be in accordance with MIL-C-81842. 3.7 Electrical Bonding, The bomb rack shall mee
22、t the design requirements of MIL-B-5087. 3.8 Workmanshi . The workmanship displayed in fabrication and assembly of thds shall be such as to assure, within design limitations, the ability of the bomb racks to meet their performance requirements under all applicable environmental conditions specified
23、herein, The standards of workmanship exhibited in the approved first article sample, subject to any qualification stated in the governments notice of approval, shall determine the requirements of the contract relative to workmanship (see 4.6.1). 4. QUALITY ASSURANCE PROVISIONS 4,l Responsibility for
24、 inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facility suita
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR858951988RACKBOMBEJECTORAIRCRAFTBRU32ABRU32A 飞机 喷射器 炸弹 机架 PDF

链接地址:http://www.mydoc123.com/p-981467.html