NAVY MIL-R-81939 B-1977 RACK BOMB EJECTOR AIRCRAFT BRU-10 BRU-11 AND BRU-19 SERIES《BRU-10 BRU-11 及 BRU-19系列飞机喷射器及炸弹的机架》.pdf
《NAVY MIL-R-81939 B-1977 RACK BOMB EJECTOR AIRCRAFT BRU-10 BRU-11 AND BRU-19 SERIES《BRU-10 BRU-11 及 BRU-19系列飞机喷射器及炸弹的机架》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-81939 B-1977 RACK BOMB EJECTOR AIRCRAFT BRU-10 BRU-11 AND BRU-19 SERIES《BRU-10 BRU-11 及 BRU-19系列飞机喷射器及炸弹的机架》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、i i. - UIL-R-BL737B LO 7777706 0360LL7 6 su 3 9-0 3 - P Y -_ - Mll-R-8T9396 (AS) 28 March 1977 Superseding 16 August 1974 MIL-R-8 1939A (AS) MILITARY SPECIFICATION RACK, BOMB EJECTOR, AIRCRAFT; BRU01 O, BRU-1 1 ANP BRU-19 SERIES This specification is approved far use by the Naval Air Systems Command
2、, Department of the Navy, and is available for use by all departments and agencies of the Department of Defense. 1. SCOPE AND CLASSIFICATION 1.1 Scope. This specification establishes the requirements for the manufacture and inspec- tion of three types of bomb racks capable of carrying and releasing
3、stores having suspension lugs spaced 355.6 millimeters (14 inches) and 762 millimeters (30 inches) apart and weighing from 113.40 kilograms (250 pounds) to 1,814.36 kilograms (4,000 pounds). The test limits in this specification define minimum acceptable capabilities. 1.2 classification. Bomb ejecto
4、r racks, hereinafter called bomb racks, covered by this specification shall be of the following types: Type L Type II Type III BRU-1O/A or BRU-lOA/A Bomb Ejector Rack BRU-1 1/A or BRU-i lA/A Bomb Ejector Rack BRU-i9/A or BRU-l9A/A Bomb Ejector Rack 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. Th
5、e following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS 5 I Military MI L-T-7743 Testing, Store Suspension and Release Equipment; General Specification for Beneficial commen
6、ts (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: z I :i i ENOINEERINO SPECIFICATIONS AND STANDARDS DEPARTMENT (CODE 93) NAVAL AIR ENOINEERINQ CENTER, LAKEHUR8T. N.J. 08733, by using the self-addressed Standardiza
7、tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. L - THIS DOCUMENT CONTAINS lb PAGES. - _. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b7 -_ MIL-R-L739B LO W 7999906 0360LL W . (Copies of speci
8、fications, standards, drawings, and publications required by suppliers in connection. with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2- Order of precedence of specifications and standards. Should a conflict exist betwe
9、en any requirement in this specification and any requirement in the applicable documents referenced herein, the requirements of this specification shall take precedence over the referenced (applicable) document. 3. REQUIREMENTS 3.1 First article. The bomb racks furnished under this specification sha
10、ll be a product which has been inspected and passed the first article inspection specified herein (see 4.3). 3.2 Selection of specifications and standards. Specifications and standards for necessary commodities and services not specified herein shall be selected in accordance with MIGSTD-143. * 3.3
11、Interchangeability. All parts having the same part number shall be directly and com- pletely interchangeable with each other with respect to installation and performance. - 2 MIL-R-819398 (AS) MIL-C-8 1842 Connector Assemblies for Bomb Rack Electric Fuzing Provisions Hooks, Bomb Rack, General Specif
12、ication for MIL-H-85042 STANDARDS Military MIL-STD- 1 O0 Engineering Drawing Practices MIL-STD-129 MIL-STD-130 Marking for Shipment and Storage Identification Marking of US. Military Property M IL-STD- 143 Standards and Specifications, Order of Precedence for the Selection of MIL-STD-704 Electric Po
13、wer, Aircraft, Characteristics and Utilization of MI L-STD-794 Parts and Equipment, Procedure for Packaging and Packing of MIL-STD-831 Test Reports, Preparation of MS3314 Lug, Suspension, 453.6 Kg (1,OOO lb.) class, Airborne Equipment DRAWINGS Naval Air Systems Command 1380540 Lug, Suspension, h3k 3
14、 Mod O * . -_ :*.* . .- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-R-81939B LO m 7799906 03bOLL9 T m MIL-R-819396 (AS) 3.4 Identification of parts. Ali parts shall be marked as specified on the drawings listed in the data list for the bomb r
15、ack being procured, or in accordance with MIL-STD-130, if not specified on the drawings. The item identification and part number requirements of MIL-STD-100 shall govern the part number and changes thereto. 3.5 Bomb rack. 3.5.1 Construction. The construction of the bomb rack shall be in accordance w
16、ith the drawings listed in the data list for the bomb rack being procured and as specified herein (see 6.2. lg). 3.5.2 Performance. The bomb racks shall satisfy all performance requirements when sub- jected to the following inspections in the order specified in Tables I and II. Electromechanical Com
17、ponent Inspection (4.6.1) Bomb Rack Inspection (4.6.2) Functional Test (4.6.3) Arming Mechanism (4.6.4) Electric Fuze Arming (4.6.5) Secondary Release (4.6.6) Manual Function (4.6.7a) Electrical Characteristics (4.6.7b) Lag Determination (4.6.7) High-g Release (4.6.7d) Sand (4.6.7e) Sait Spray (4.6.
18、70 Vibration Test (4.6.78) accordance with MIL-H-85042. a. b. C. d. e. f. g* h. i. j. k. 1. m. n. O. 3.6 Shock Test (4.6.7h) Life Test (4.6.7i) Static Test (4.6.7j) Lock Shut Firing (4.6.8) Bomb rack hooks. The construction and inspection of the bomb rack hooks shall be in 3 Provided by IHSNot for R
19、esaleNo reproduction or networking permitted without license from IHS-,-,-NIL-R-BL737B LO = 777770b 0360320 6 MIL-R-81939B (AS) 3.7 Electric fuze arming unit. The construction and inspection of the electric fuze arming unit shall he in accordance with MIL-C-81842. 3.8 , Workmanship. The workmanship
20、displayed in fabrication and assembly of the bomb racks shall be such as to assure, within design limitations, the ability of the bomb racks to meet their performance requirements under all applicable environmental conditions specified herein. Unauthorized repair, welding, heavy burrs, or parts asse
21、mbled by introduction of high stresses not prescribed in the drawings, are typical signs of inferior workmanship and shall be cause for rejection. The standards of workmanship exhibited in the approved first article sample, subject to any qualification stated in the governments notice of approval, s
22、hall be determinative of the requirements of the contract relative to workmanship. 4. QUALITY ASSURANCE PROVISIONS (see 6.4) 4.1 Responsibility for inspection, Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as specified he
23、rein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the government. The government reserves the right to perform any of the inspections set fort
24、h in the specification, where such inspections are deemed necessary to assure that the supplies and services conform to prescribed requirements. 4.2 Classification of inspection. The inspection of the bomb racks shall be classified as follows: a. First article inspection (see 4.3) b. . Quality confo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR81939B1977RACKBOMBEJECTORAIRCRAFTBRU10BRU11ANDBRU19SERIESBRU10BRU11 BRU19 系列 飞机 喷射器 炸弹 机架 PDF

链接地址:http://www.mydoc123.com/p-981402.html