1、MIL-Dd0572B 16 December 1994 SUPERSEDING 23 April 1991 MIL-Dd0572A MILITARY SPECIFICATION DELAY ELEMENT, CARTRIDGE, M28 ASSEMBLY mis specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the
2、M28 Cartridge Delay Element (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents a
3、re those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-B-550 Barium Chromate MIL-A-2550 Ammunition, General Specification for MIL-A-8625 Anodic Coating for Alum
4、inum and Aluminum Alloys MIL-B-5 1092 Boron, Amorphous, Powder I 1 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, Indian Head Divison, Naval Surface Warfare Center, 101 Strauss Avenu
5、e, Standardization Branch (8420), Indian Head, Maryland 20640-5035, by using the Standardization Document Improvement Proposal D Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided
6、 by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-60572B 9997906 1995918 686 MIL-D-60572B STANDARDS MILITARY MIL-STD-105 Sampling Procedures and Tables for Inspection by Attributes MIL-STD- 1 O9 Quality Assurance Terms and Definitions MIL-STD-453 Inspect
7、ion, Radiographic MIL-STD-8 10 Environmental Test Methods and Engineering Guidelines (Unless otherwise indicated, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 19 1 1 1-5094.) 2.1
8、.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS Naval Surface Warfare Center (CAGE Codes 19200
9、 and 19203) DL1052 1650 Delay Element, Cartridge, M28, Assembly 8826728 Ammunition, Container, Metal, M21 for Delay Element, M5 or M8 8826729 Box, Packing, Ammunition, for Delay Element, M5 or M8 in Metal Container M21 (Application for copies should be addressed to: Commander, Indian Head Division,
10、Naval Surface Warfare Center, Data Control Branch (Code 8410), 101 Strauss Avenue, Indian Head, MD 20640-5035.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document,
11、 however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order, a first article sample shall be subjected to first article inspection (see 4.4, 6.2, and 6.3). 3.2 Conformance to d
12、ocuments. The M28 delay element covered by this specification shall be manufactured in accordance with DL10521650 and all documents listed thereon. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-bO572B 9999906 L9959L9 512 MIL-D-60572B 3.3 Ma
13、terials. All materials used in the manufacture of the cartridges shall conform strictly to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture, When
14、 alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.4 Components. 3.4.1 Primary components. For the purpose of this specification, the PVU-1/A Ignition Device, Delay Charge, and output material charge are con
15、sidered primary components. Only primary components from a single lot shall be used in a production lot of cartridges; however, one primary component production lot may be used in more than one cartridge production lot (see 6.7). 3.4.1.1 Ignition device. The ignition device shall conform to the appl
16、icable drawing and reference specification. Only ignition devices from lots manufactured within the last 24 months or recertified within the last 12 months shall be used in these units. Prior to assembly into a delay element, the ignition device shall be visually examined in accordance with 4.6.5 an
17、d radiographically examined for defects as specified in 4.7.1. 3.4.2 Protective finish. The finish of each component part shall be in accordance with MIL-A-8625 and the applicable drawing (see 4.7.2). 3.5 Assembly. 3.5.1 Radiographic examination. Each delay element assembly shall be radiographically
18、 examined for defects (see 4.7.3). 3.5.2 Vibration. The assembled delay element shall withstand vibration as prescribed in MIL-STD-810, Method 514.3, Test Procedure I, Test Condition 1-3.2.5 without evidence of any disintegration of the ignition device, propellant, or igniter, or derangement of any
19、component (see 4.7.4 and 6.2). 3.6 Functional requirements. 3.6.1 Delay element performance. 3.6.1.1 Misfires. The ignition delay element shall not fail to fire. 3.6.1.2 Ballistics. The ignition delay charge shall consist of barium chromate, as specified in MIL-B-550, and boron, as specified in MIL-
20、B-51092, in the proportion and quantity fixed by the contractor to produce the ignition delay times required in table I (see 6.6.1). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-60572B Temperature (O F) -60to -70 65 to 75 195 to 205 TABLE
21、I. Ballistic reauirements. Lower upper 0.425 0.575 0.425 0.475 0.350 0.475 Ignition delay time (sec) 3.7 Workmanship. Delay elements shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3.7.1 Metal defects. All
22、 components shall be free from cracks, splits, cold shuts, inclusions, porosity, or any similar defect. 3.7.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.7.3 Foreign matter. No part or a
23、ssembly shall contain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (exam
24、inations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILD60572B1994DELAYELEMENTCARTRIDGEM28ASSEMBLYM28 炮筒 延迟 发射 装置 PDF

链接地址:http://www.mydoc123.com/p-978354.html