NAVY MIL-D-18616-1955 DETONATOR MARK 56 MOD 0《MARK 59 MOD 0雷管》.pdf
《NAVY MIL-D-18616-1955 DETONATOR MARK 56 MOD 0《MARK 59 MOD 0雷管》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-D-18616-1955 DETONATOR MARK 56 MOD 0《MARK 59 MOD 0雷管》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-LbLh 13 m 777790b 0297597 3 m MIL-18616( Nord) 3.1.1 The reqummenta bd procedures establiahed in O
2、P 400 shall be adhered to wherever applicable, 3.2 Prhin mixture. 1- The moiature content of the priming mixture at the time of loading shall be lesa than 0.30 percent as determinod by the proceure epecified in 4.c.l. The composition of the priming mixture shall meet the drawing requirements when su
3、bjected to the chemical analysis specified in 4.5.3. - y . 3.3 Lead azide. 0- The moisture content of the lead azide at the tima of loading shall be less than 0.30 percent as determined by the procedure specified in 4.5.1. 3.4 Tetryl. - The volatiles and moisture content ofthe tetryl at the time of
4、loading: shall not exceed 0,lO percent when tested a3 apecified in 4.5.2. explosive components of the detonator shall be 88 specified on the applicable drawinc. to the drawing requirements shall be controlled and determined by the procedures specified in 4.5.4 and 4.5.5. 3.5 - Detonator loadinfr,. 0
5、- The charge weights of the The conformance of these weights 3.6 Detonator sem it iv i ty . detonatm shall be ascertaine sensitivity value shall be us process control, Deviations not directly cause the reject be reason foc checking matei4 mixture composition for cornpl specification requirernents. =
6、- The sonsitivit of, the d as spocified in .S.6. ed for data card record and in sensitivity values shall ion of detonators, but may als, processes* and priming .iance with drawint, and . The 3.7 Detonator functioninq. - The detonator shall function on firing pin penetration when tested in Test Set (
7、Detonator) Mk i36 Nod O using a two ounce test ball and a drop height of. 12 inches. in 4.5. Test Set i:.;k 136 hod U shall produce perforstions in the lead dieCs for 85 gercent of the detonators tested. The average diameter of the perforations shall be 0.200 Inch or greater. of a circle of equal am
8、a as determined by the use of Test Set i-lk 170 Mod 1. Each individual indentation produced in lead discs which are not perforated shall be 0.195 incii or greater in depth, Testing and acceptance shall be as speoi- fled in 4.5.8. Testin, preproditction sample is received which proves to bo Satis* fa
9、ctory for the purpose incendod, the Contractor will b6 notified and will be authorized by the Procuring Agency to Accepted aamples will become the property of the Yrocming Agency and will be included in the number called for in When a , i I proceed with the submission of the product for acceptance.
10、i I the contract schedule. t 4.2.3 Preproduction sample for a subsequent contract, - The nbceaslty for a. preproduction stmple will be detormined by the Procuring Agency when production under a new contraot by the ame Contractor at the same Location follows the manufacture of satisfactory msterial a
11、s covered by this speclflsation, 4.3 Produotion lot, - For procurement lot of loaded detonators shal coiisist of .plus those required for all test purposes stated in the oontraot, order, or requisi test pyrposea shall be at the expense of The produotion lot should not be oonfused inspection puofms a
12、s defined in 4.E.1. purposes each 10,000 units . Unless otherwise tion all units for the Contractor. with the lot for Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license
13、 from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL- D- 18616 (NOr d) 4.5.3.4 Carborundum, - Subtract the original weight of the ignitedmtering crucible from the weight of the cru- cible and residue acter the antimony sulphide deterniin
14、ationo This difference, calculated as a percentage of the original sample, shall be considered the percentage of oarborundum. ! 4.5.4 Process control tests for detonator charRe weights, - !I Process control tests shall be conducted for each variation in the operating procedures, processes, or materi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILD186161955DETONATORMARK56MOD0MARK59MOD0 雷管 PDF

链接地址:http://www.mydoc123.com/p-978279.html