NAVY MIL-D-18506-1955 DETONATOR MK 45 MOD 0《45号0型炸药》.pdf
《NAVY MIL-D-18506-1955 DETONATOR MK 45 MOD 0《45号0型炸药》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-D-18506-1955 DETONATOR MK 45 MOD 0《45号0型炸药》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-D-l8506(NOrd) 25 April 1955 SUPERSEDING NAVORD OS 1599 18 January 1952 MILITkRY SPECIFICATION DETONATOR MK 45 MOD O 1, SCOPE 1,l This specification governs the manufacture, assembly, loading, and preparation for delivery of Detonator Mk 45 Mod O and the methods of inspection and tests upon which
2、 acceptance will be based. flash initiated. The Detonator 14k 45 Nod O is 2, APPLICABLE DOCUNENTS 2.1 The following specifications, standards, drswings, and publications, of the issue in effect on date of invitation for bids, form a pert of this specification: SPECIFICATIONS MILITARY JAN-T-339 - Tet
3、ryl (trinitrophenylmethylnitramine), STANDARDS MIL-STD-lS- Sampling Procechres and Tables for Inspection by Attributes MIL-STD-129- Marking for Shipment End Storage THIS DOCUMENT CONTAINS 7 PAGES. Licensed by Information Handling ServicesDRAWINGS 1 EVZEATJ OF ORDNANCE LD 166550 - Primer (Fuze, Elect
4、ric) Mk 112 Mod O, LD i66576 - Detonator Mk 45 Mod O, LD 168793 - Detonator Container Mk 3 Nod O, LD 168794 -= Detonator Container Nk 2 Mod O, LI) 185941 - Testing Appnratus,and all documents listed thereon, PUZL ICAT IONS BUREAIJ OF ORDNANCE OP 400 - General Instructions for the Design, Manufacture
5、, and Inspection of Naval Ordnsnce Equipment, (Copies of specifications, standards, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from the prociming ctivity or as directed by the contracting officer, 1 2.2 Other Publications.
6、- The following documents form a part of this specification. Unless otherwise indicated, the. issue in effect on date of invitation for bids shall apply, CODE OF FEDERAL REGULATIONS 49 CFR 71-78 - Transportation, Interstate Commerce Commission, Explosives and Other Dangerous iirticles. (The Entersta
7、te Commerce Commission regulations are now a part of the Code of Federal Regulations (1949 Edition-Revised 1950) available from the Superhtendent of Documents, Government Printing Office, Washington 25, D. C, Orders for the above publication should cite “49 CFR 71-78 (Rev, 19C;O)a“) 3. REQUIRENENTS
8、3.1 General. 3.1.1 Detonators 14k Mod O covered by this specifi- cation shall be manufactured in accordance with Bureau Licensed by Information Handling ServicesMIL-D-18506 13 7777906 0277LI77 8 U -, - MIL-D-l8506(NOrd) of Ordnance List of Drawings LD No. 166576 and all docu- ments listed thereon. O
9、P 400 shall be adhered to wherever applicable. 3.2 Lead Azide. - The moisture content of the lead azide at time of load-ing shall be less than O,3O percent when tested as specified in 4.4. 3.1.2 The requirements and procedures established in 3.3 Tetryl. - The volatiles and moisture content of the te
10、tryl at time of loading shall be less than 0,lO percent when tested as specified in 4.5. 3.4 Functioning. - Each lot of detonators shall pass the functioning test specified in 4.6. 4. QUALITY ASSURANCE PROVISIONS AXD TEST REQUIREITEXTS 4.1 Preproduction Sample. - Before entering into quantity produc
11、tion a preproduction sample of two hundred (ZOO) Detonators INk 45 Plod O shall be delivered by the Contractor for test to an agency designated by the Procuring Agency. These detonators shall be manufactured by the same procedures and processes and at the same location proposed by the Contractor for
12、 the execution of the contract. “hen a preproduction sample is received which proves to be satisfactory for the purpose intended the Contractor will be notified and will be authorized by the Procuring Agency to proceed with the submission of the product for acceptance. Accepted samples will become t
13、he property of the Procuring Agency and will be included in the number called for in the contract schedule. 4.l.l Preproduction Sample for a Subsequent Contract. - The necessity for a preproduction sample will be determined by the Procuring Agency when production under a new con- tract by the same C
14、ontractor at the same location follows the manufacture of satisfactory material as covered by this specification. - 4.2 Production Lot. - A production lot shall consist of 10,000 detonators. consecutive manufacture. The production lot is used for delivery and identification of detonators and is not
15、related to the inspection lot defined in Military Standard The detonators of a lot shall be of MIL-STD-O. - . 3 Y i Licensed by Information Handling Services- MIL-D-18506 13 9999906 O299480 4 = shall be Ln accordance wth General lnstruetio: Desim. Manufacture,and Inspection of Naval Ordnance I accor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILD185061955DETONATORMK45MOD045 炸药 PDF

链接地址:http://www.mydoc123.com/p-978277.html