NAVY MIL-D-18504-1955 DETONATOR MK 27 MOD 0《MK 27 MOD 0雷管》.pdf
《NAVY MIL-D-18504-1955 DETONATOR MK 27 MOD 0《MK 27 MOD 0雷管》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-D-18504-1955 DETONATOR MK 27 MOD 0《MK 27 MOD 0雷管》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MILITAFiY SPECIFICATION DETONATOR MK 27 MOD O Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking
2、 permitted without license from IHS-,-,-3.8 Detonator Output, - Each explosion of the detonator in the Test Set Mk 136 Mod O shall produce a perforation in the lead disc greater than S.300 inch in diameter. The perforation diameter shall be the diameter of a circle of equal area as determined by use
3、 of the Test Set Mk 170 Mod 1. Testing and acceptance shall be in accordance with 4.5.6. 4. QUALITY ASSURANCE PRViSIONS AND TEST REQUIREMENTS 4.1 S.amplfnq. - Unless otherwise specified, and when applicable, the sampling plans and procedures used by the Goverment Inspector in the determination of th
4、e accepta- bility of products submitted by a supplier for Government Inspection will be in accordance with the provisions of Military Standard MIL-STD-105, “Sampling Procedures and Tables for Inspection by Attributes“, of units of product, the tem “Lot“ shall mean “Inspection Lot,“ if a collection o
5、f units of the product used as a basis for Government Inspection. Unless otherwise speci- fied, the number of units of product in “Inspection Lots“ shall be as determined by the Government Inspector, and may differ from the quantity designated in the contract or order as a lot for production, shipme
6、nt, or other purpose . 4.1.1 Lot. - As applied to the Government Inspection 4.2 Preproduction Sample. - Before entering into quan- roduction a preproduction sample of one thousand tity (10OUp Detonators Mk 27 Mod O shall be delivered by the Contractor for test to an agency designated by the Procurin
7、g Agency. These detonators shall be manufactured by the same procedures and processes and at the same lo- cation proposed by the Contractor for the execution of the contract. When a preproduction sample is received which proves to be satisfactory for the purpose intended, the Contractor will be noti
8、fied and will be authorized by the Procuring Agency to proceed with the submlssion of the product for acceptance. Accepted samples will become the property of the Procuring Agency and will be included in the number called for in the contract schedule. 4.2.1 Preproduction Sample for a Subsequent Cont
9、ract. - The necessity for a preproduction sample will be determined by the ProcGing Agency when production under a new contract by the same Contractor at the same location follows the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-manufacture of sat
10、isfactory material as covered by this spe cf icat ion . 4.3 Production Lot. - For procurement purposes each lot of loaded detonators shall consist of 10,000 units plus those required for all test purposes. The production lot should not be confused with the lot for inspection purposes as defined in M
11、ilitary Standardf MIL-STD-105 4.4 Inspection. - The general inspection procedures shall be in accordance with “General Instructions for the Design, Nanufacture, and Inspection of Naval Ordnance Equipment“, OP 400; Government Inspection shall be in accordance with the provi.sions of General Procedure
12、 for Government Inspection and Contractors Inspection shall be in accordance with Inspection by Cantractor as contained in OP 400. 4.5 Tests. 4.;.i Noisture Content Test for Priming Plixture and Lead Azide. - Conduct at least one test for each lot of detonators and such additional tests as the Inspe
13、ctor considers warranted by variations in the process and materials. Collect an approximate two gram sample of the material being loaded in a tared, stoppered container at the site of and immediately prior to consolidating the charge in the detonator. Weigh the container; open and expose the sample
14、for drying at 50 3- 2 degrees C and at least 28 inches (Hg) vaeuum until constant weight is reached. Cool the container in a desiccator; stopper and weigh. All weighings shall be accurate to dry for approximately 15 minutes at 95 degrees C; cool in a desiccator, and weigh, The percentage loss in wei
15、ght, based on the weight of the orig,inal sample, shall be considered the percentage of potassium chlorate. 4.5.3.2 Lead Azide. - Extract the residue from the potassium chlorate determination with 5 ml portions of saturated ammonium acetate solution at about 25 degrees C. Hot saturated ammonium acet
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILD185041955DETONATORMK27MOD0MK27MOD0 雷管 PDF

链接地址:http://www.mydoc123.com/p-978273.html