NAVY MIL-D-18503-1955 DETONATOR MK 22 MOD 0《MK 22 MOD 0雷管》.pdf
《NAVY MIL-D-18503-1955 DETONATOR MK 22 MOD 0《MK 22 MOD 0雷管》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-D-18503-1955 DETONATOR MK 22 MOD 0《MK 22 MOD 0雷管》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-D-18503 (Nard) 25 April 1955 SUPERSSDING IVAVORD OS 3713 25 April 1945 MILITARY SPECIFICATION DETONATOR I4.K 22 XOD O 1. SCOPE 1.1 This specification governs the nanufacture, assembly, ._ loading and preparation for delivery of Detonator Xk 22 Xod O and the methods of inspection and tests upon w
2、hich acceptance will be based. Detonator Xk 22 Hod O is stab initiated . 2. APPLICABLE ECUIVlENTS 2.1 The following specifications, standards, drawings, and publications, of the issue in effect on date of invi- tation for bids, form a part of this specification: SPECIFICATIONS MILITARY JAN-T-339 - T
3、etryl (trinitroshenylmethylnitramine). S T ANDBRDS MIL-STD-105 - Sariipling Procedwoes and Tables for MIL-STD-129 0- Marking for Shipment and Storage. Inspection by Attributes. DRANINGS 4 BUREAU OF ORDNANCE 438236 - Detonator Nk 22 Xod O, LD 166538 - Test Set (Detonator) Nk i36 Mod O, LD 168793 - De
4、tonator Container Mk 3 Mod O, LD 168794 - Detonator Container 3k 2 Mod O, LD 284563 - Test Set Nk 170 Mod O, - Test Ball, and all documents listed thereon. THIS DOCUMENT CONTAlFdS 1 PAGES. 553491 7 c- /-? 75 - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
5、IHS-,-,- - - _I_ MIL-D-18503 13 m 7777706 0277457 7 m MIL-D-i8503 (Nord) PUBLIC AT IONS BREAU OF ORDNANCE OP 400 OD 5823 -0 General Instructions for the Design, Manufactwe, and Inspection of Naval Ordnance Equipment. 0- Sensitivity Test of Primers and Detonators using Test Set Mk i35 Mod O (Primer)
6、and Test Set Mk i36 Mod O (.Detonator). (Copies of specifications, standards, drawings, and publi- cations required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer.) 2.2 Other Publications. - Th
7、e following documents form Unless otherwise indicated, a part of this specification. the issue in effect on date of invitation for bids shall apply CODE OF FEDERAL REGULATIONS 49 CFR 71-78 - Transportation, Interstate Commerce Commission, Explosives and Other “a Dangerous Articles. (The Interstate C
8、ommerce Commission regulations are now a part of the Code of Federal Regulations (1949 Zdition-Ze- vised 1950) available from the Superintendent of Documents, Government Printing Office, Washington 25, D. C, for the above publication should cite “49 CFR 71-78 (Rev, 1950) “ ) Orders 3. REQTJIREMENTS
9、3.1 General. 3.1.1 Detonators Ik 22 Mod O covered by this specification shall be manufactured in accordance with Bureau of Ordnance Drawing No, 438236 and all documents listed thereon. 3.1.2 3.2 The requirements and procedures established in OP 400 Handling. - Loaded detonators shall be pecked by lo
10、ts, shall be adhered to wherever applicable. marked for lot identification, and stored in desiccators (or Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-in hermetically sealed dry atmosphere) until such time as they we loaded into fuzes or prepared
11、for shipment. 3;3 Primina Mixture, - The moisture content of the priming mixture at th e time of loading shall be less than 0.30 per- cent as determined by the procedure of 4.4.1. The composition of the priming mixture shall meet the drawing requirements when subjected to the chemieal analysis descr
12、ibed in 4.4.3. at the time of loading shall he less than 0.30 percent as determined by the procedure of 4.4.1. 3.5 Tetryl. - The volatiles and moisture content of the tetpyl at the time of loadin shall not exceed 0.10 percent when tested as specified in $.4.2. 3.4 Lead Azide. - The moisture content
13、of tne lead azide 3.6 Detonator Sensitivity. - The sensitivity of the detonators shall be ascertained as prescribed in 4.4.4. The sensitivity value shall be used for data card record and process control, Deviations in sensitivity values shall not directly cause the rejection of detonators, but may b
14、e reason for checking materials, processes, and priming mixture com- position for compliance with drawing and specification require- ment s . 3.7 Detonator Ftuictioninq. - The detonator shall function on firing pin penetration when tested in Test Set Mk i36 Hod O using a two ounce test ball and a dr
15、op height of 18 inches. Testing and acceptance shall be in accorance with 4.4.5. 3.8 Detonator Output. - Each explosion of the detonator in the Pest Set Mk 136 Mod O shall produce a perforation in the lead disc greater than 0.10 inch in diameter. ation diameter shall be the diameter of a circle of e
16、qual area as determined by the use of Test Set Mk i70 Mod O. Testing md aeceptance shall be in accordance with 4.4.6. The perfor- 4. QUALITY ASSURANCE PROVISIONS AND TEST REQU1RZI”TS 4.1 Preproduction Sample. - Before entering into quantity production, a preproduction sample of one thousand (1OCO) D
17、etonators Mk 22 Hod O shall be delivered by the Contractor for test to an agency designated by the Procuring Agency. These detonators shall be manufactured by the same procedures and processes and at the same location proposed by the Con- tractor for the execution of the contract. When a prepro- duc
18、tion sample is received which proves to be satisfactory 3 -, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- I MIL-D-18503 13 M 7797706 0299Li57 2 MIL-D-18503 (Nord) for the purpose intended, the Contractor will be notified and will be authorized by
19、 the Procuring Agency to proceed with the submission of the product for acceptance. samp1e.s will become the property of the Procuring Agency and.wil1 be included in the number called for in the contract schedule. Accepted 4,i.l Preproduction Sample for a Subsequent Contract, - The necessity for a p
20、reproduction sample will be determined by the Procuring Agency when production under a new contract by the same Contractor at the same location follows the manufacture of satisfactory material as covered by this spec- ifica-tion, 4.2 Production Lot. - For procurement purposes each lot of loaded deto
21、nators shall consist of 10,000 detonators plus those required for all test purposes. should not be confused with the lot for inspection purposes defined in Milit arg Standard YtIL-STD-lOA “Sampling Procedures and Tables for Inspection by Attributes. The production lot 4.3 Inspection. - The general i
22、nspection procedures shall be in accordance with General Instructions for the Design, Manufacture, and Inspection of Naval Ordnance Equipment, OP 400; government inspection shall be in accordance with the provisions of General Procedure for Government Inspection and contractors inspection shall be i
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILD185031955DETONATORMK22MOD0MK22MOD0 雷管 PDF

链接地址:http://www.mydoc123.com/p-978271.html