NAVY MIL-C-81089-1964 COORDINATE CONVERTER MARK 54 MOD 0《54 MOD 0坐标转换标志》.pdf
《NAVY MIL-C-81089-1964 COORDINATE CONVERTER MARK 54 MOD 0《54 MOD 0坐标转换标志》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-81089-1964 COORDINATE CONVERTER MARK 54 MOD 0《54 MOD 0坐标转换标志》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-81089 LE I 9999906 0358603 5 i . - MIL-C-810$9 (Wep) 1 June i964 MILITARY SPECIFICATION COORDINATE CONVERTER MARK 54 MOD O This specification has been approved by the Bureau of Naval Weapons, Department of the Navy. 1. SCOPE 1.1 Scope. - This specification establishes the requirements for the
2、procurement of a Coordinate Converer Mk 54 Mod O, BTJWEPS LD 162276. 2. APPLICABU DOCWNTS 2.1 The following specifications, stmdards, drawings and publica- tions, of the issue in effect on the date of invitation for bids, or re- quest for proposal, form a part of this specification to the extent spe
3、ci- fied herein. SPECIFICATIONS FEDERAL PPP-B-566 Boxes, Folding PPP-B-63 6 Boxes, Fiber PPP -B-676 Boxes, Setup MILITARY Preservation, Methods of Shockproof Equipment, Class HI (High Impact) Shipboard Application, Tests for -_ MIL-P-116 MIL-s-go1 MIL-E-203 6 the General Specification for Design and
4、 Procurement of Weapons, Handling and Preparation for Delivery of; General Requirements for Definitions of and Basic Requirements for forth in this specification where such in- 4.1.1 4,1.2 Classification of inspections. - Inspection of the converter shall be classified as follows: a. Pre-production
5、inspection (paragraph 4.5) b. Acceptance inspection (paragraph 4.4) c . Periodic production inspection (paragraph 4.5). 4.2 Sampl.ing 4.2.1 Pre-production Smpling, - A pre-production sample of one (1) converter manufactured in accordance with 3.2 shall be subjected to the pre-production tests detail
6、ed in 4.5 at an activity designated shall be based on no defects in the sample. converter by the supplier, prior to approval of the pre-production sample shall be at the suppliers risk. . by the procuring activity. Acceptance of the pre-production sample Further production of the Provided by IHSNot
7、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-81087 12 = 997770b 0358b10 2 i .! 1-C-81089(ep) 4.2.2 Periodic Production Sampling. - Periodic production saples These samples shall be subjected to the tests shall be selected from wits that have satisfactorily pas
8、sed the accept- ance inspections of 4.4. of 4.5 at an activity designated by the procuring activity. production sampling shall be as follows: Periodic Step 1. Upon initiation of production, randomly select one (1) unit from each group of ten (10) units. sanples selected from three (3) consecutive gr
9、oups, shift to Step 2. five (25) units. consecutive groups, shift to Step 3. mon satisfactory compliance of Step 2. Randomly select one (1) unit from each group of twenty- Upon satisfactory compliance of samples from three (3) Randomly select one (1) unit from each group of fifty Step 3. (50) units.
10、 a defective unit is found. Continue with Step 3 for the balance of the contract or imtil When a defective unit is found in any group, acceptance of all wits on hand shall be withheld and the conixactor shall: a, Determine the cause and effect. b. Take the necessary actions to correct or eliminate t
11、he de- fect from all units on hand and, if so directed by the procuring activity, from those units previously shipped. c. Submit to the procuring activity for approval, the proposed corrective action to prevent recurrence of the defect. Return to Step 1 and proceed as indicated when inspection is re
12、sumed. 4.3 Test Equipment. - Items of test equipment required to perform acceptance tests se% forth in this specification are listed in QAP-8LO89 4.4 Acceptance Inspection. 4.4,l Each converter delivered under contract shall be subjected to all the tests detailed in QAP-81089. Failure to satisfactor
13、ily pass any test specified therein shall be considered cause for rejection. 4.4.2 Test Conditions - Unless otherwise specified, the converter 4.4.2.1 shall be subjected to acceptance tests under the following conditions. Temperature. - Room ambient 65 degrees F to 95 degrees F (18.33 degrees C to 3
14、5.0 degrees C), 4.4.2.2 Altitude. - Normal ground. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL- c-8io$g(weP) 4.5.3.2.1 Mounting. - The converter
15、 shall be mounted on the vibration testing machine to simulate as realistically as possible the service in- stallation including vibration isolator or mounting devices, The converter shall be secured to the vibration testing machine in such a manner that the direction of vibration will be along each
16、 of the principle axes separately. The converter may be reoriented on the horizontal vibrating machine between each test, if necessary, to obtain such motion. At no time shall the con- verter be mdunted in any other way than its normal position. 4,5.3.2.2 Test Procedures. - The converter shall be en
17、ergized %o per- form its normal function in the operating condition and subjected to the vibration tests, specified in Standard MIL-STD-167, Type 1, 4,5.4 Shock. 4.5.4.1 Transportation, Storage md Eandling. - The converter, packe and packaged as defined in 5., shall.be sub jected to the appropriate
18、shock isolation tests specified in Weapons Requirement WR-li, shall be in accordance with Weapons Requirement WR-1 i , Selection of tests 4.5.4.2 Operating. - The converter shall be mounted on the standard mounting bracket of a shock testing machine in a manner most closely sim- ulating actual servi
19、ce installation, including shock mounts, The converter shall be energized to perform its normal function in the operation condi- tion, and shall be subjected to shock tests specified in Specification MIL-s-901 , 4.5.5 Climatic Conditions. - The converter shall be tested for catis- factory operation
20、at the ambient temperatures and conditions, and cold weather operation conditions as specified herein. When separate high tem- perature and low temperature chambers are not available, it is permissible to perform the hot and cold tests in the same chamber by raising the am- bient air temperature fro
21、m the low to the high temperature as specified in 4.5.5 2. 4.55.1 The converter shall be chilled to zero degrees F with power off and covers in place. has dropped to within five degrees of the specified minimum, the power supply shall be turned on and the converter allowed to stand in a “ready“ cond
22、ition, but not operated for two hours. tested for satisfactory operation. When the air temperature inside the converter The converter shall then be 4.5.5.2 After the tests described in 4.5.5.1, the ambient air temper- ature shall be raised to plus 110 degrees F with relative humidity between ninety-
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC810891964COORDINATECONVERTERMARK54MOD054MOD0 坐标 转换 标志 PDF

链接地址:http://www.mydoc123.com/p-977951.html