NAVY MIL-C-50765-1971 CARTRIDGE DELAY CCU-17 B CCU-18 B CCU-19 B ASSEMBLY《延时炮弹CCU-17 B CCU-18 B CCU-19 B型组件》.pdf
《NAVY MIL-C-50765-1971 CARTRIDGE DELAY CCU-17 B CCU-18 B CCU-19 B ASSEMBLY《延时炮弹CCU-17 B CCU-18 B CCU-19 B型组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-50765-1971 CARTRIDGE DELAY CCU-17 B CCU-18 B CCU-19 B ASSEMBLY《延时炮弹CCU-17 B CCU-18 B CCU-19 B型组件》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、 - - S-374s MIL- C- 50765 (MU) 1 November i971 MILITARY SP EGIFICATION CARTRIDGE DELAY , CCU- 17/B, CCU- 18/B , CCU-19/BY ASSEMBLY 1. SCOPE 1.1 This specification covers Cartridge, Delay: CCU-17/BY CCU-i8/B, CCU-19/B Assembly, for use in cartridge actuated devices. 2. APPLICABLE DOCUMENTS: 2.1 The f
2、ollowing documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein: SPECIFICATIONS : Military MIL-A-2550 - Ammunition and Special Weapons, General Speci- MIL-E-5272 MIL- C- 6 05 3 9 - Coating, Anodic, Con
3、venrional, for Aluminum and fication for. Equipment, General Specification for, Aluminum Alloys. - Environmental Testing, Aeronautical and Associated STANDARDS : Military MIL- STD- 105 - Sampling Procedures and Tables for Inspection MIL-STD- 109 MIL-STD-171 - Finishing of Metal and Wood Surfaces MIL
4、- STD-413 by Attributes. - Quality Assurance Terms and Definitions. - Visual Inspection Guide for Rubber O-Rings. DRAWINGS : C87 987 14 Ca798715 D117 38 7 33 Dl1738735 Dl1738737 - Carton, Packing, Amunition for Cartridge Delay - Box, Packing, Ammunition for Cartridge Delay - Cartridge Delay, CCU-l7/
5、B Assembly - Cartridge Delay, CCU-lS/B Assembly - Cartridge Delay, CCU-l9/B Assembly (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contractin
6、g officer.) FSC 1377 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-7 MIL-C-50765 13 W 7777906 0330935 3 W HILI C- 50765 ( W 9 2.2 Other publications.- The following document forms a part of this specification to the extent specified herein. the iss
7、ue in effect on date of invitation for bid or request for proposal shall apply: Unless otherwise indicated, ASA-B-46.1 - Surface Texture (Application for copies should be addressed to the American National Standards Institute (ANSI) 1430 Broadway, New York, New York 10018). 3. REQUIWNTS 3.1 General.
8、- Materials, parts and assemblies shall conform to the applicable drawings (See 6,l and 6.3) and referenced specifications. 3.2 Protective finish.- Protective finish shall be in accordance with MIL-(2-60539 and MIL-STD-171 as referenced on applicable drawings. 3.3 Moisture content of lead azide.- Th
9、e moisture content of the lead azide at the time of loading shall not exceed 0.50 percent. 3.4 Vibration.- The assembled cartridge shall withstand vibration as prescribed in MIL-E-5272, Procedure XII without evidenSe of any disintegration of the primer, delay charge, or relay charge, or derangement
10、of any component. 3.5 Primer sensitivity. 3.5.1 The primer, when primed into Delay Element Housin s, shall all- fire when drop tested at an energy level of 26.0 inch ounces. 3.5.2 The primer, when primed into Delay Element Housings, shall not fire when drop tested at an energy level of 4.0 inch ounc
11、es. 3.6 Shock.- The assembled cartridge shall be temperature conditioned in accordance with Table I, inserted into an acceptable test fixture and shocked 750g in either direction along the major axis, The shock load shall be applied during cartridge function and shall not fail to comply with delay t
12、imes specified in Table I, shall not occur in excess of d x 10 -4 cc/sec. 3.7 Airtightness.- The cartridge shall be sealed such that leakage 3,8 Functional . 3,8,1 The cartridge shall not fail to fnire. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
13、-,-NIL-C-50765 13 m 7977706 0330736 5 m MIL-C-O(MTJ) 3.8.2 Ballistics.- The cartridge when tested shall comply with the requirements specified in Table I. TABLE I Delay Times, Seconds (See 6.2) Temp era tur e CCU-l7/B 1 Sec. Delay -65“ to -70F 1.2 max 65“ to 75F 1.0 2 0.10 200“ to 205F 0.8 min. CCU-
14、 18/B CCU-l9/B 2 Sec. Delay 4 Sec. Delay 2.4 max. 1.6 min. 2.0 2 0.20 4.8 max. 4.0 i 0.40 3.2 min. 3.9 Workmanship. - Workmanship shall be in accordance with the require- ments of the applicable drawings , referenced specifications and the following: 3.9.1 Metal defects.- The metal part shall be fre
15、e from cracks, splits, cold shuts, inclusions, porosity or other metal defects. 3.9.2 Burr.- The part shall not have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.9.3 Foreign matter.- The part or assembly shall no
16、t contain chips, dirt, grease, oil, rust, corrosion or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance (“of all inspection requirements as specified
17、 herein. 5 specified in the contract or order, the supplier may use his own qr any other facilities suitable for the performance of the inspection requirements speci- fied herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in t
18、he specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise 4.1.1 Quality Assurance terms and definitions.- References shall be made to MIL-STD-109 to define the quality assurance terms used. 4.1.2 Inspection. -
19、 Inspection shall be in accordance with MIL-A-2550. 4.2 First Article Sample. 4.2.1 Initial production sample.- At the beginning of regular produc- tion, a sample shall be submitted in accordance with contract requirements and shall consist of 54 assembled cartridges, 10 sets of unassembled componen
20、ts (including explosive components) for visual and dimensional examination and tests, and 100 primed delay housings for primer sensitivity test. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-50765 13 m 7977706,0330737 7 m MTL- C- 50765 (MU)
21、 4.2.1 Continued The sample shall be manufactured using the same materials, equipment, process and procedures as used in regular production. including packaging and packing shall be the same as used for regular production and shall be obtained from the same source of supply. All parts and materials,
22、 4.2.1.1 Examination and tests.- After examination and provisional Bcceptance at source, the sample shall be inspected sf the drawings and specifications at a Government laboratory or such pther facility specified in the contract. for all requirements 4.2.1.2 Ballistics.- The sample for ballistics t
23、ests shall be temperature conditioned and tested to determine compliance with 3.8, The Tempera ture -65“ to -70F 65“ to 75F 200“ to 205F Vibrated 4 4 4 sample for testing shall consist of the following: TABLE III Shock 4 4 4 - Not Vibrated 10 10 10 4.2.1,3 In-tia1 pr0duct-m sample failure.- Fai-are
24、of the sample to comply with the requirements of the drawings and specifications shall result in sample disapproval. 4.3 inspection provisions. 4.3.1 a. 4.3.1.1 Submission of product.- The product shall be submitted in accordance with MIL-STD-105. 4.3.1.2 Size of Lots.- A lot shall consist of an ide
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC507651971CARTRIDGEDELAYCCU17BCCU18BCCU19BASSEMBLY 延时 炮弹 CCU17BCCU18BCCU19B 组件 PDF

链接地址:http://www.mydoc123.com/p-977856.html