NAVY MIL-C-46274 C-1992 CARTRIDGE IMPULSE M94 ASSEMBLY《脉冲炮弹M94型组件》.pdf
《NAVY MIL-C-46274 C-1992 CARTRIDGE IMPULSE M94 ASSEMBLY《脉冲炮弹M94型组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-46274 C-1992 CARTRIDGE IMPULSE M94 ASSEMBLY《脉冲炮弹M94型组件》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-Yh274C 13 W 9999906 057570.5 2 W I INCH-POUND I MIL-C-46274C 23 June 1992 SUPERSEDING MIL4274B(MU) 7 December 1971 MILITARY SPECIFICATION CARTRIDGE, IMPULSE, M94 ASSEMBLY mis specijcation is approved for use by all Departments and Agencies of LE Department of Defense. 1. SCOPE 1.1 Scope. This
2、specification covers the requirements for the M94 Impulse Cartridge (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2,.1.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, th
3、e issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For MIL-A-8625 Anodic Coatings, For
4、 Aluminum And Aluminum Alloy Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be adressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Standardization Branch (Code 0343), 101 Strauss Avenue,
5、 Indian Head, MD 20640-5035, by using the Standardization Document Improvement Proposal D Form 1426) appearing at the end of this document or by sending a letter. ,AMSC NIA DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. FSC 1377 Provided by IHSNot for ResaleNo repr
6、oduction or networking permitted without license from IHS-,-,-MIL-C-46274C 13 = 9997906 0575706 4 MIL-C-46274C STANDARDS MILITARY MIL-STD-105 Sampling Procedures And Tables For Inspection By Attributes MIL-STD-109 Quality Assurance Terms And Definitions MIL-STD-4 13 Visual Inspection Guide For Elast
7、omeric O-Rings MIL-STD-453 Inspection, Radiographic MIL-STD-8 10 Environmental Test Methods however, one primary component production lot may be used in more than one cartridge production lot. 3.4.1.1 Primer. The primer shall conform to the applicable drawing and reference specification. Prior to as
8、sembly into a cartridge, the primer shall be visually examined in accordance with 4.6.2 and radiographically examined for defects as specified in 4.7.1. 3.4.2 Hardness. The hardness of each component part shall be in accordance with the applicable drawing (see 4.7.2). 3.4.3 Protective finish. The fi
9、nish of each component part shall be in accordance with MIL-A-8625 and the applicable drawing (see 4.7.3). 3.5 Assembly. 3.5.1 Radiographic examination. Each cartridge assembly shall be radiographically examined for defects (see 4.7.4). 3.5.2 Airtightness. Each assembled cartridge shall exhibit no a
10、ir leakage greater than 1 x 10-4 standard cubic centimeters of air per second at a 14 psia pressure differential (see 4.7.5). 3.5.3 Vibration. The assembled cartridge shall withstand vibration as prescribed in MIL-STD-8 10, Method 514.3, Test Procedure I, Test Condition 1-3.2.5 without evidence of a
11、ny disintegration of the primer, propellant, or igniter, or derangement of any component (see 4.7.7 and 6.2). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-46274C 13 9999906 0575708 8 n MIL-C-46274C 3.6 Functional requirements. 3.6.1 Primer
12、 sensitivity. The primer shall fire when drop tested at an energy level of 120 inch-ounces in a sectioned cartridge void of igniter and propellant charge (see 4.7.8.1). 3.6.2 Cartridge performance. 3.6.2.1 Misfires. The cartridge shall not fail to fire. 3.6.2.2 Ballistics. The cartridge, when assemb
13、led into an acceptable M15 Thruster and fired at - 60“ to - 70“F, 65“ to 75“F, and 195“ to 205“F, shall produce a thrust sufficient to propel an 11- pound mass along a horizontal plane, shearing a shear pin with a shear value of 3750 pounds, simultaneously overcoming a 2250-pound resistive load from
14、 zero inches stroke to a minimum of 4.42 inch stroke. Time from initiation of cartridge to completion of stroke shall be not less than 200 milliseconds or more than 750 milliseconds. 3.6.2.3 Initiation. The thruster shall be fired by a source delivering an output pressure f 700 + 25, - O pounds per
15、sqaure inch gage (psig) at the end of 15 feet of aircraft hose, MS28741-4, at 70“ however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.1.2 Quality assurance terms and definitions.
16、 Reference shall be made to MIL-STD-109 to define the quality assurance terms used. 4.1.3 Inspections. Inspections shall be in accordance with MIL-A-2550 and MIL-STD-453. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspe
17、ction (see 4.4) b. Quality conformance inspection (see 4.5) 4.3 Inspection conditions. Unless otherwise specified in the contract or purchase order (see 6.2), inspection conditions shall be as follows: a. Temperature: Room ambient 20“ to 25“ C (68“ to 77“ F) b. Altitude: Sea level c. Humidity: 50 pe
18、rcent relative, maximum d. Atmospheric: 14.7 psia 4.4 First article inspection. At the beginning of regular production, the contractor shall submit a first article sample to a Government approved facility for evaluation. The sample shall consist of 21 assembled cartridges for ballistics testing incl
19、uding 12 for vibration tests (to be selected from ballistic samples), 5 assembled cartridges for sealant tests, 10 sets of unassembled components for dimensional and visual examination, and a quantity in accordance with 4.4.2, Le., cartridges assembled without the igniter and propellant charge for p
20、rimer sensitivity test. The first article sample shall be manufactured using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing, shall be the same as used for regular production and shall be obtained from t
21、he same source of supply. When it becomes necessary to make a change in either the primer, propellant, or igniter lot after initial production, 12 assembled cartridges from the first production lot thereafter shall be tested in accordance with 4.7.7. The Government reserves the right to require new
22、first article samples until an acceptable sample is submitted (see 6.3). 4.4.1 Examination, tests, and facility. After provisional acceptance at source, the sample shall be inspected for all requirements of the drawings and specifications at a Government laboratory or other such facility specified i
23、n the contract (see 6.2). 4.4.2 Sample size for primer sensitivity. The number of cartridges assembled without igniter or propellant to be submitted for primer sensitivity tests shall be in accordance with table I. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
24、e from IHS-,-,-MIL-C-46274C 13 m 9997706 0575730 b m Lot Size 3 to 15 MIL-C-46274C Sample Size 3 TABLE I. Primer sensitivitv. 1. il 181 to 300 301 to 500 25 30 16 to 25 801 to 1300 Over 1300 4 40 50 II Temperature (OF) Not vibrated -60 to -70 3 5 II Vibrated 4 II 41 to 65 7 II 66to 110 51 111 to 180
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC46274C1992CARTRIDGEIMPULSEM94ASSEMBLY 脉冲 炮弹 M94 组件 PDF

链接地址:http://www.mydoc123.com/p-977808.html