NAVY MIL-C-46228B-1991 CARTRIDGE DELAY M93 ASSEMBLY.pdf
《NAVY MIL-C-46228B-1991 CARTRIDGE DELAY M93 ASSEMBLY.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-46228B-1991 CARTRIDGE DELAY M93 ASSEMBLY.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、r P U NIL-C-4622BB 13 m 999990b 047bbb5 3 m MLCd6228B 23 ADrii 1991 SUPERSEDING MILC-46228A 6 July 1973 MILITARY SPECIFICATION CARTRIDGE, DELAY, M93 ASSEMBLY is specMcation is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE . 1.1 Scope. This specification cove
2、rs the requirements for the M93 Delay Cartridge (see 6. i). 2. APPLICABLE DOCUMENTS 2.1 Government documents, 2.1.1 Specifications, standards, and handbooks. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues
3、 of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification for MIL-Cd0539 Coating, Anodic, Conventiona
4、l for Aluminum and Aluminum Alloy Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Ordnance Station, Standardization Branch (3730), Indian Head, Maryland 20640-5000, by
5、using the self addressed Standardization Document Improvement Proposal D Form 1426) appearing at the end of this document or by letter. AMSC NIA DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. FSC 1377 Provided by IHSNot for ResaleNo reproduction or networking permi
6、tted without license from IHS-,-,-MIL-C-46228B 13 m 9999906 047bbbb 5 m i MILC-46228B STANDARDS MILITARY MIL-STD-105 Sanipling Procedures and Tables for Inspection by Attributes MIL-STD-109 Quality Assurance Terms and Definitions MIL-STD-453 Inspection, Radiographic MIL-STD-810 Environmental Test Me
7、thods and Engineering Guidelines (unless otherwise indicated, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.1.2 Other Government documents, drawings, and publicati
8、ons. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS NAVAL SEA SYSTEMS COMMAND (CAGE Code 53711) 5 184950 M93 Closed Bomb Assembly NAVAL ORDNANCE STATION
9、 (CAGE Codes 19200 and 19203) DL85933 12 Cartridge, Delay, M93 Assembly 8799620 Box, Packing, Ammunition, For Cartridge, Delay: M93 8799621 Carton, Packing, Ammunition, For Cartridge, Delay: M93 9224944 Carton, Alternative, Packing, Ammunition, For Cartridge, Delay: M70, M93, M113, M155, XM231, OR M
10、293 (Application for copies should be addressed to: Commanding Officer, Naval Ordnance Station, Data Control Branch (Code 3720), Indian Head, MD 20640-5000.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this docume
11、nt takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-4b22BB 23 9999906 047bbb7 7 MIL-C-46228B 3. REQU
12、IREMENTS 3.1 first article. When specified in the contract or purchase order, a first article sample shall be subjected to first article inspection (see 4.4, 6.2, and 6.3). 3.2 Conformance to documents. The M93 Delay Cartridge covered by this specification shall be manufactured in accordance with DL
13、8593312 and all documents listed thereon. 3,3 Materiais. All materials used in the manufacture of the cartridges shall conform strictly to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant
14、 Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposai. 3.4 Components. 3.4.1 Primary components. For the purpose of this specification, the M42 Primer, M8 Delay Elem
15、ent, Igniter Charge and the cartridge propellant charge are considered primary components. Only primary components from a single lot shall be used in a production lot of cartridges; however, one primary component production lot may be used in more than one cartridge production lot. 3.4.U Primer. The
16、 primer shall conform to the applicable drawing and reference specification. Only primers from lots manufactured within the last 24 months or recertified within the last 12 months shall be used in these units. Prior to assembly into a cartridge, the primer shall be radiographically examined for defe
17、cts as specified in 4.7.1. 3.4.2 Hardness. The hardness of each component part shall be in accordance with the applicable drawing (see 4.7.2). 3.4.3 Protective finish. The finish of each component part shall be in accordance with MIL-C-60539 and the applicable drawing (see 4.7.3). 3.5 Assembly. 3.5.
18、1 Radiographic examination. Each cartridge assembly shall be radiographically examined for defects (see 4.7.4). 3.5.2 Airtightness. Each assembled cartridge shall exhibit no air leakage greater than 1 x lo4 standard cubic centimeters per second (see 4.7.5) at a 14.7 psia pressure differential, 3.5.3
19、 Vibration. The assembled cartridge shall withstand vibration as prescribed in MIL-STD-810, Method 514.3, Test Procedure I, Test Condition1 3.2.5 without evidence of any disintegration of the primer, propellant, or igniter, or derangement of any component (see 4.7.7 and 6.2). 3 Provided by IHSNot fo
20、r ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-4622BB 13 = 9999906 0476668 9 = Delay time (sec) Pressure (psig) Lower Upper Lower Upper Temperature (OF) MILC-46228B 3.6 Functional requirements. Time to P- (ms) 3.6J Primer sensitivity. The primer shall fire when dr
21、op tested at an energy level of 26 inch-ounces in a sectioned cartridge void of igniter and propellant charge (see 4.7.8. i). 195 to 205 3.6.2 Cartridge performance. .80 1.15 2300 3400 50 3.6.2.1 Misfires. The cartridge shall not fail to fire. 3.6.2.2 Ballistics. The cartridge, when tested in a clos
22、ed bomb (Drawing 5184950), shall produce the pressures, delay times (see 6.6.1), and times to P, (see 6.6.2) at temperatures specified in table I (see 4.7.8.2). TABLE I. Ballistic reauirements. 65 to75 I .85 1 1.20 I 2300 I 3400 . I 50 3.7.1 Metal defects. All components shall be free from cracks, s
23、plits, cold shuts, inclusions, porosity, or any similar defect. 3.7.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.7.3 Foreign matter. No part or assembly shall contain chips, dirt, greas
24、e, rust, corrosion, or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC46228B1991CARTRIDGEDELAYM93ASSEMBLYPDF

链接地址:http://www.mydoc123.com/p-977790.html