NAVY MIL-C-43438 D-1981 CRIMPER BLASTING CAP M2 PLIER TYPE WITH FUSE CUTTER《带熔丝切断钳的M2型压紧式爆破雷管》.pdf
《NAVY MIL-C-43438 D-1981 CRIMPER BLASTING CAP M2 PLIER TYPE WITH FUSE CUTTER《带熔丝切断钳的M2型压紧式爆破雷管》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-43438 D-1981 CRIMPER BLASTING CAP M2 PLIER TYPE WITH FUSE CUTTER《带熔丝切断钳的M2型压紧式爆破雷管》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、$- 3749 MIL-C-43438D 18 December 1981 SUPERSEDING MIL-C-43438C 11 April 1974 MILITARY SPECIFICATION CRIMPER, BLASTING CAP, M-2, PLIER TYPE, W/FUSE CUTTER This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers
2、 a plier type, manually operated crimping and fuse cutting tool. 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documents, o the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein: SPECIFICATION FED
3、ERAL PPP-P-40 - Packaging and Packing of Hand Tools STANDARDS FEDERAL FED-STD-66 - Steel: Chemical Composition and Hardenability MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes I Beneficial comments (recommendations, additions, deletions) and any perti- nent data w
4、hich may be of use in improving this document should be addressed to: Natick, MA Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. US Army Natick Research and Development Laboratories, 01760 by using the self-addressed Standardization Document I FSC 5120 -_ r- P
5、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- RIL-C-4393D 51 M 979990b 0369635 7 MIL-C-4343 8D DRAWING US ARMY NATICK RESEARCH AND DEVELOPMENT LABORATORIES. 12-1-162 - Crimper, Blasting Cap, M2, Plier Type, W/Fuse Cutter, Assembly and Details (A mi
6、niature copy of Drawing No. 12-1-162 is attached for information purposes only ) (Copies of specifications, standards, and drawings required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2
7、 Other publications. The following documents form a part of this specification to the extent specified herein. in effect on date of invitation for bids or request for proposal shall apply: Unless otherwise indicated, the issue AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) E 18 - Rockwell Hardnes
8、s and Rockwell Superficial Hardness of Metalic Materials (Application for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103.) 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), the contractor shall furnish a sample for fi
9、rst article inspection and approval (see 4.3 and 6.3). 3.2 Material and components (see 6.5). Materials and components shall be as specified herein and on applicable drawings. shall be of the quality normally used by the manufacturer in his crimper, provided the complete item complies with all provi
10、sions of this specification. Materials not definitely specified 3.2.1 Steel. Steel shall conform to the chemical composition of AIS1 1045 of FED-STD-66. * 3.3 Design and construction. The crimper shall be in accordance wih the design and dimensions shown on Drawing 12-1-162. 3.3.1 Fuse cutter. The j
11、aws, operating in unison, shall be capable of cutting militaryblasting time fuse, M700, (commercially known as military safety fuse), and detonating cord without visible evidence of crushing or fraying of the fabric when tested as specified in 4.5.1. 2 Provided by IHSNot for ResaleNo reproduction or
12、 networking permitted without license from IHS-,-,-MIL-C-4343D 51 W 7797706 03b7636 7 *-* MIL-C-43438D 3.3.2 Crimper section. The jaws, operating in unison, shall form a crimper section. cap and the nonelectric commercial No. 8 blasting cap to military blasting time fuse, M700, by indenting a groove
13、 completely around the cap. show no evidence of cracks or splits, and shall not pull loose when tested as specified in 4.5.3. The crimper shall be capable of crimping the nonelectric military blasting The crimped cap shall 3.3 Hardness. The jaws and handles shall be hardened in accordance with the r
14、equirements of Drawing 12-1-162 when tested in accordance with 4,5.2. 3.4 Identification marking. manufacturers identification. The crimpers shall be permanently stamped with the 3.5 Government furnished property. The following property, in the quantities required, will be furnished by the Governmen
15、t (see 6.4): Item No. 1 2 DescriDtion Fuse, Blasting, Time M700 Cap, Blasting, Nonelectric, MO97 Identification NSN 1375-00-028-5246 NSN 1375-00-783-8043 3.6 Workmanship. The crimper shall be free of chips, burrs, slivers, dirt, grease, rust areas, areas of no finish, embedded foreign matter, and sh
16、arp corners and edges except for corners and edges of the screwdriver blade and edges of the cutter and punch tip. and punch tip shall be visually sharp. free from nicks or indentations. Corners and edges of screwdriver blade and edges of cutter All edges of the crimper shall be smooth and 4. QUALIT
17、Y ASSURANCE PROVISIONS * 4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other fac
18、ilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services c
19、onform to precribed requirements. 4.2 Classification of inspection. The inspection requirements specified herein are classified as follows: a. b. First article inspection (see 4.3). Quality conformance inspection (see 4.4). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted witho
20、ut license from IHS-,-,-MIL-C-4343 8D * 4.3 First article inspection. When a first article is required (see 6.2), it shall be examined for the defects specified in 4.4.2.1 and 4.4.2.2 and tested as specified in 4.5.1, 4.5.2, and 4.5.3. The presence of any defect or failure of any test shall be cause
21、 for rejection of the first article. 4.4 Quality conformance inspection. Unless otherwise specified, sampling for inspection shall be in accordance with MIL-STD-105. 4.4.1 Component and material inspection. In accordance with 4.1, components and materials shall be inspected in accordance with all th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC43438D1981CRIMPERBLASTINGCAPM2PLIERTYPEWITHFUSECUTTER 带熔丝 切断 M2 压紧 爆破 雷管 PDF

链接地址:http://www.mydoc123.com/p-977784.html