NAVY MIL-C-21583-1958 CS MECHANISM MARK 1 MODS 3 4 9 AND 11《3 4 9 11型1号铸钢机械》.pdf
《NAVY MIL-C-21583-1958 CS MECHANISM MARK 1 MODS 3 4 9 AND 11《3 4 9 11型1号铸钢机械》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-21583-1958 CS MECHANISM MARK 1 MODS 3 4 9 AND 11《3 4 9 11型1号铸钢机械》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、cs 1. SCOPE RIL-C-21583 (Nord) 20 August 1958 SUPERSEDING NAVORD OS 2676D 12 November 1954 MILITARY SPECIFICATION IECMMISM WIRK 1 XODS 3, 4, 9, AND 11 1.1 This specification establishes the requirements for the procurement of the CS Mechanism Mark 1 Mods 3, 4, 9, and 11, The CS Mechanism Mark 1 is a
2、 clock starter operated by hydro- static pressure. delay mechanism at the proper depth. The various mods differ only in minor variations. It unlocks and starts an attached clock 2. APPLICABLE DOCUMNTS 2.1 The following specifications, standards, drawings, and publications of the issue in effect on d
3、ate of invitation for bids, form a part of this specification, SFECIF ICATI ONS MILITARY MIL-P-116 Preservation, Methods of. STANDARDS MILITARY MIL-STD-105 MIL-STD-12 9 Sampling Procedures and Tables for Inspection by Attributes. Marking for Shipment and Storage U Provided by IHSNot for ResaleNo rep
4、roduction or networking permitted without license from IHS-,-,-DRAWINGS BUREAU OF ORDNANCE LD 130581 LD 130582 LD 139217 LD 169485 LD 291755 LD 295891 LD 299892 1476194 And all do PUBLICATIONS um-nts li-t CS Mechanism Mark 1 Mod . CS Mechanism Mark 1 Mod 9. CS Mechanism Mark 1 Mod 11. Test Pot Mark
5、3 Mod 1. Container, Inner, for CS Mechanisms, Mark 1 type. Container, Outer, for CS Mechanisms, Mark 1 type. Marking Instructions for Storage and Shipping Containers. CS Mechanism Mark 1 Mod 2 . d in the above LDs and drawings, General Instructions for the Design, Manufacture and Inspection of Naval
6、 Ordnance Equipment. BUREAU OF ORDNANCE NAVORD OP 400 (Copies of specifications, standards, drawings, and publica- tions required by contractors in connection with specific pro- curement functions should be obtained from the procuring activity or as directed by the contracting officer), 2.2 Other pu
7、blications. = The following documents form a part of this specification. the issue in effect on date of invitation for bids shall apply, Unless otherwise indicated, NATIONAL BUREAU OF STANDARDS Handbook H28 Screw-Thread Standards for Federal Services. (Application for copies should be addressed to t
8、he Superin- tendent of Documents, Government Prin$i.pg Office, Washington 25, DoCo). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3 . REQUIREMEKTS 3.1 General reuuirement s . 3.1.1 The CS Mechanism Nark 1 shall be manufactured in accordance with t
9、he below listed LDs and all documents listed thereon. Mod 3 LD 130581 Mod 4 LI? 130582 Kod 9 - LD 139217 3.1.2 The requirements and procedures established in OP-400 shall be complied with as applicable. 3.1.3 Preproduction sample. - Unless otherwise specified in the contract ororder, a preproduction
10、 sample shall be manufactured by the same procedures and processes and at the same location as proposed for full production. will be tested for the purpose of determining conpliance with the requirements of this specification, the drawings, and the contract. See 4.1.2. This sample 3.1.4 fnterchanaea
11、bility. - Component parts of assembled units (unless otherwise specified on the applicable drawings) fabricated in strict agreement with their applicable draw- ings shall be interchangeable and shall assemble with mating components of the unit without selection or fitting. If, during assembly of the
12、 fabricated parts of a unit, selection or fitting is required and changes in dimensions are necessary, no changes In the parts as delineated on applicable drawings shall be made without prior approval of the Bureau of Ordnance. 3.2 Requests for deviation. - Requests for deviation from this specifica
13、tion, applicable drawings, specifications, publications , materials and processes specified herein, shall be as set forth in OP 400. 3.3 Conflictinp requirements. - Conflicting requirements arising between this specification or any specifications, publications, or drawings listed herein shall be ref
14、erred in writing to the procuring agency or appointed agent for inter- pretation and clarification. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4 Threads. - Unless otherwise specified, all threads shall be in accordance with the National Bureau
15、 of Standards Handbook H28 and supplements thereto. The class or fit for threads shall be as specified on the applicable drawings, an the NOT-GO gaging practice shall be as set forth in the supplement to the aforementioned Handbook H28. 3.5 Performance reauirements and product characteristics . The
16、mechanism covered by this specification shall meet the following performance requirements and product characteris- tics. 3.5.1 Flange porosity. - The flange shall be capable of withstanding an air pressure of 60 pounds per square inch and show no leakage when tested as specified in 4.5.3. 3.5.2 Asse
17、mbly. - The diaphragm shall be assembled on the The piston before assembly of the diaphragm into the flange. nut holding the diaphragm on the piston shall be tightened with a torque of from 25 to 35 pound-inches without distorting the diaphragm to assure that a watertight seal is made. The piston-di
18、aphragm sub-assembly shall then be installed in the flange. The threads of the ring nut shall be coated with antiseize compound to prevent binding in the flange and special care shall be used to prevent the antiseize compound from contacting the diaphragm. The ring nut shall be tightened on the diap
19、hragm while the piston is in the extended position. A torque of from 150 to 170 inch-pounds shall be used to tighten the ring nut without distorting the diaphragm, to assure that a watertight seal is made. 3.5.3 Hand operation. - The mechanism shall be assembled with the safety device in the unlocke
20、d condition. The piston shall be deprecsed to its fully extended position and then allowed to return to its normal cosition. There shall be no binding during the piston travel. condition, the assembled mechanism shall be capable of with- standing a pressure differential of 60 pounds per square inch,
21、 without leaking, when tested as specified in 4.5.6. 3.5.4 Leakage. - With the safety device in the unlocked Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIGC-21583 (NOrd 3.5.5 Lberatina Dressure. - The CS Mechanisms covered by this specification
22、shall operate within the following pressure limits with no clock delay mechanism attached. be as specified in 4.5.7. Testing shall (a) The piston shall move to its fully extended position when the pressure is increased to some pressure between 2 and 6 pounds per square inch . (b) The piston shall fu
23、lly retract when the pressure is removed. 3.6 Vorkmanship and cleanliness. - The mechanism shall be free from dust, dirt, metal filings, moisture, chips, and other foreign matter. Necessary precautions shall be taken during manufacture and assembly to insure these conditions . 4. QUALITY ASSURANCE P
24、ROVISIONS AND TEST REQUIREMENTS . 4.1 Government InsDection. - The Government inspector will make such inspections as are necessary to determine that all components and assemblies are in accordance with the require- ments of the contract, pertinent specifications and drawings. Unless otherwise speci
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC215831958CSMECHANISMMARK1MODS349AND1134911 铸钢 机械 PDF

链接地址:http://www.mydoc123.com/p-977503.html