1、MILITARY SPECIFICATION BiOWRS, SOOT (SHIPBOARD USE) This amendment forms a part of Military Specifi- cation MIL-B-l947A(SHIPS), 18 August 1960. # Page 1, paragraph 1.2, iisting, Ciass 1, Une 2: Delete “600 and substitute “710“. #. Page 1, paragraph 2.1; Delete reference to all Federal Specifications
2、. NIL-B-1947A (5) 44 9799906 020OL4 9 W II MTL-B-l947A(SHZFS) AMENDMENT - 5 11 July 1966 SUPERSEDING 0 Amendment - 4 18 August 1964 # Page 1, paragraph 2.1: Delete reference to Military Specifications MIL-B-233, MIL-B-10377, MIL-L- 10547, MIL-P-15424 and MIL-C-16173 and substitute: ffMIL-V-22094 - V
3、ades, Globe, Angle and Y, Flanged Bonnet, Manually Operated (Sizes 2 Inches and Below). 1 Page 1, paragraph 2.1: Delete reference to Military Standards , MIL-STD-129 and MIL-STD-167. # Page 2, paragraph 3.1: Delete and substitute: It3. 1 Head design characteristics. - For the head materials specifie
4、d for each class of soot blowers (see 3.5.3.6.1 and 3.5.3.6.2), fluctuations of not more than 25F. are permissible. I # Page 2, paragraph 3.2: First sentence, delete and substitute lfClass 1 soot blowers shall be furnished with ASA standard mounting flanges conforming to ASA Publication B16.5 and AS
5、ME Boiler and,Pressure Vessel Code, Section WI, for the maximum pressure and temperature specifiedtt; Une 8, delete tkxcesst and substitute %ccess“, Page 2: Add as paragraph 3.2.1. “3.2.1 Fiange finish. - The gasket contact-surfaces of all flanges used in the soot-blower assembly (head, companion, o
6、rifice, element flange, and so forth) shall be finished with a circular lay (concentric or phono- graphic) having a roughness not exceeding 500 roughness height rating (RHR) produced by machining cuts of O. 003 inch maximum depth but not less than 40 cuts per inch of face width. The finish within th
7、e above limits selected by the manufacturer is to be designated on all applicable drawings,“ Page 3, paragraph 3.5.2: Delete and substitute: “3.5.2 Type 1 (Stationary) soot blowers (operating mechanism). - Type I (stationary) soot blowers shall include an adjustable orifice that is preset by the sup
8、plier for 300 p. S. i, (or less as approved by the command or agency concerned) steam admission to the element. This orifice installation, or other suitable means to be installed in the viciniv, shall contain a 3/8 inch NPT tap for insertion of pressure measuring device to verify admission steam pre
9、ssure entering element. Unless otherwise specified (see 6. i), type I soot blowers shall be complete with steam valves. Steam valves shall conform to MiL-V-22094, material to be suitable for the source of steam. A spring-loaded air relief valve of corrosion-resistant material (3/8 inch i. p. 8. mini
10、mum) shall be provided to admit purging air to the element and to prevent combustion gases from l/CHANGES FROM PREVIOUS ISSUE. THE OUTSIDE MARGINS OF TRIS DOCUMENT HAVE BEEN MARK- - ED t#ll “0 INDICATE WHERE .CHANGES (DEWTIONS, ADDITIONS, ETC. ) FROM THE PREVIOUS ISSUE HAVE BEEN MADE. SUMES NO LIABI
11、LITY WHATSOEVER FOR ANY INACCURACIES IN THESE NOTATIONS. BIDDERS AND CONTRACTORS ARE CAUTIONED TO EVALUATE THE REQUIREMENTS OF THIS DOCUMENT BASED ON THE ENTIRE CONTENT AS WRITTEN IRRESPECTIVE OF TIIE MARGINAL NOTATIONS AND RELATION- SHIP TO THE LAST PREVIOUS ISSUE. THIS HAS BEEN DONE AS A CONVENIEN
12、CE ONLY AND THE GOVERNMENT AS- Licensed by Information Handling ServicesRIL-B-LSLI7A (5) LI4 9999906 0209035 O Page 5: Add 88 paragraph 3.5.4.3: “3.5.4.9 Connecting piece (swivel or extension tube). - A tubular connecting piece shall be provided be- tween the head and the element. Corrosion-resistin
13、g material shall be used where the piece passes through the stuffing box in the head. The connecting piece shall be for the purpose of securing the element to the head during field installation in a suitable manner to insure maintenance of the proper angular position of the nozzles with respect to t
14、he operating mechanism in the head. An indicator to show the angular position of the nozzles to the operator at all times shall be attached to the gear wheel or secured by other means approved by the command or agency concerned. “he swivel tube or the element shall be at least 6 inches longer than d
15、eeigned length to allow for field modification to suit installation conditions. ke2of _. - - MIL-B-l947A(SIIPS) AMENDMENT - 5 entering the piping. A 3/8 inch connection shall be provided for this purpose. The air relief valve shall be provided with fittings suitable for connection to the pressurized
16、 air space by 1/2 inch steel or copper tubing. Unless otherwise specified (see 6. I), type I soot blowers shall be complete with air relief tubing. It Page 3, paragraph 3.5.3.1: Biete and substitute: 113.5.3.1 Operation. - The steam head shall be designed to transmit steam to the element or lance fr
17、om a fixed steam connection without steam leakage when the element or lance is being operated. It shall be design- ed BO that the head inlet is on or below the horizontal in a plane normal to the axis of the soot blower ele- ment. Page 3, paragraph 3.5.3.2, Une 3: Delete “of the head. Page 3, paragr
18、aph 3.5.3.3: Delete and substitute: “3.5.3.3 Steam pressure control in head, - The method of steam admission and steam pressure control shall be as approved by the command or agency concerned. Means of pressure control shall be included in each head design to reduce the pressure at the element a max
19、imum blowing pressure of 300 p, 6. i. A 3/8 inch NPT tap is to be provided in each soot blower head for insertion of a pressure measuring device, This pressure control shall be an adjustable part of the head in order to effect no greater steam entrance pressure to the element than the above designat
20、ed 300 p. S. i. The control shall be capable of external adjustment and shall be present by the supplier for the designated maximum.“ Page 4, paragraph 3.5.3.5, last sentence: Delete and substitute Wnless otherwise specified (see 6. i), the scavenging air relief valves shall be connected to the pres
21、surized air space by 1/2 inch steel or copper tubing and by suitable joints approved by the command or agency concerned. # # Page 4, paragraph 3.5.3.6.1: Heading, delete ft600tt and substitute “710“; listing, delete reference to Head and substitute: # Page 4, paragraph 3.5.3.6.1 listing: Delete refe
22、rence to Head and substitute: “Head-Carbn molybdenum alloy steel castings or forgings in accordance with ASME hbli- cation SA-217 grade WC-1 or SA-I82 grade F1, respectively. It # Page 4, paragraph 3.5.3.6.2 listing: Delete reference to Head and substitute: “3ead-l-l/4 percent chrome; 1/2 percent mo
23、lybdenum alloy steel casting or forging in accor- dance with ASME Publication SA-217 grade WC-6 or SA-182 grade FI1 respectively, It Page 4, paragraphs 3.5.3.7 and 3.5.3.8: Delete. Page 5, paragraphs 3.5.4.2: Delete and substitute: “3.5.4.2 Reduction gearing. - Reduction gearing shall be provided in
24、 the head for notation of the elements, The gear ratio shall be not less than 7 to 1. For manually operated units designed for rotation in one direc- tion only, an arrow shall be cast on or attached to the gear wheel, the sheave wheel or operating handwheel, whichever is most convenient for observat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILB1947A51966BLOWERSSOOTSHIPBOARDUSE 煤烟 吹风机 PDF

链接地址:http://www.mydoc123.com/p-977195.html