NAVY MIL-B-18876 A-1976 BOX AMMUNITION 40 MM MARK 1 MOD 0《MARK 1 MOD 0 40毫米弹药盒》.pdf
《NAVY MIL-B-18876 A-1976 BOX AMMUNITION 40 MM MARK 1 MOD 0《MARK 1 MOD 0 40毫米弹药盒》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-B-18876 A-1976 BOX AMMUNITION 40 MM MARK 1 MOD 0《MARK 1 MOD 0 40毫米弹药盒》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-c .- (Aiwtion fox capha should be addressed to te American Society for Tesf=Lng and texias, 1916 Race Slmekr Philadelphiar PA 19103), Provided by IHSNot for ResaleNo reproduction or networking permitted
2、 without license from IHS-,-,-MIL-B-18876A (Oc) 3.4 Surface. drawings and specifications, unless othdse stated in the mntract, order, or requisition. 3.5 interchangeability. Al1 parts shall be capable of interchangeable assembly without interferences, binding, or misaligrment. amprising a permanentl
3、y joined unit (as by welding) and the unit thus fo& shall be capable of interchangeable joining in the assanbled unit and assembly. 3.6 Welding. Ail surfaces to be welded shall be thoroughly cleaned and shall be free from grease, paint, or other foreign substances. and welding machines shall qualify
4、 (4.4.1) and conform to the requirerents and tests of this specification, applicable drawings and in accordance with All parts shall be finished as .prescribed on applicable All partc All welding lQL-P-16594. 3.7 Stacking. The amnunition boxes shall be constructed to stack either vertically or horiz
5、ontally. engage inside upper reinforcing band of tk adjacent box. When stack& horizontally, the stacking projection in the middle of the amnunition box shall be on top and shall engage the stacking pocket on the bottcnn side of the adjacent box. binding. (see 4.5.1.4) When stacked vertically, the bo
6、x bottom shall The boxes shall stack readily without forcing or 3.8 Gasket and gasket bearing surface. the cover with an adhesive c-t ir accordance With M-A-121 and the exposed bearing surface shall be coated with talc or graphite to prevent sticking to the bearing surface of the box. of the boxshal
7、l be forred, turned, or otherwise machined to produce a smoth continuous surface which will not injure the gasket during closing or opening of the amnunition box and which is perpendicular to the axis of the box within tolerances specified on applicable drawings. The rim shall not vary mre than 0.03
8、 inches from a plane surface, as determined by a feeler gage with a surface plate resting on gasket bearing surface, to ensure proper seating of the gasket. Gasket shall provide proper sealing at closure of cover, 3.11. 3.9 Cover pads. pregnated in accordance with MIGC-17057. strips, shall be in acc
9、ordance with MW-A-121. The gasket shall be csmmted in The gasket bearing surface Cover pads shall be made of felt sheet, ml, mnpound im Cement, for securing pas to cover 3.10 Plating. Completed dtion boxes and covers shall be galvanized all ovr, inside aqd outside, as specified on applicable drawing
10、s. Gal- vanizing shall be accmplished by the hot-dip process in accordance With ASIM A-386. deposit& in accordance with QD-2-325, Type II, Class 2. All parts of cover not permanently joined may be z”inc electro- 3.11 Airtightness. Boxes shall be capable of withstandirq internal air pressure test of
11、4.5.1.2 without evidence of any structurai weakness or permanent deformation. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-r * * e * * - u* * 4.3.1 F
12、irst article samples. Unless otherwise specified, as soon as practicable after the award of the contractor order, the first tm boxes manufactured by the mthods and eguiPment proposed for the production of the boxes shall be submitted for first article tests to determine can- pliance with the require
13、mentc of the contract, specifications and drawings. Mer production of the boxes by the supplier propr to approval by the procuring activity or the coqletion of the tests on the first article samples shall be at the suppliers risk. First article sample-s accepted will be applied as part of the quanti
14、ty specified by the cofitxact or order, but shall not be used on any equipment mufactwed for the Gcrven-iment. The first article samples shall be forwarded to the COnaMnding Officer, US Naval Weapns Station, Earle, Colts Neck, NJ 07722, Attention: Director, Naval Weapns Handling Laboratory. The firs
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILB18876A1976BOXAMMUNITION40MMMARK1MOD0MARK1MOD040 毫米 弹药 PDF

链接地址:http://www.mydoc123.com/p-977190.html