NAVY MIL-A-23773 A-1967 ANCHOR UNDERWATER MINE MARK 56 MOD 4 AND MOD 5《MARK 56 MOD 4 AND MOD 5水雷锚点》.pdf
《NAVY MIL-A-23773 A-1967 ANCHOR UNDERWATER MINE MARK 56 MOD 4 AND MOD 5《MARK 56 MOD 4 AND MOD 5水雷锚点》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-A-23773 A-1967 ANCHOR UNDERWATER MINE MARK 56 MOD 4 AND MOD 5《MARK 56 MOD 4 AND MOD 5水雷锚点》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-A-23773A I3 7777906 0303758 I MIL-A-23773A (OS) 10 January i967 SUPERSEDING MIL-A-23773 (Wep) 25 June 1963 MILITARY SPECIFICATION ANCHOR, UNDERWATER MINE, MARK 56 MOD 4 AND MOD 5 This spec if ic,at ion has been approved by the Naval Ordnance Systems Commami, Department of the Navy 1. SCOPE 1.1 f
2、9r the procurement of the Anchor Mod 4 and Mod 5, 549694 and 549719. o3e class. This specification establishes the requirements Underwater Mine, Mark 56 They are of one type and 2. APPLICABLE DOCUMENTS 2.1 Tne following specifications, standards, draw- ings, and publications or such portions thereof
3、 as designated herein of the issue in effect on the date of invitation for bids form a part of this document. SPEC IF ICAT I ONS MILITARY MIL-C-21947 Conpound, Antifouling, For MIL-G- 771 1 Grease, Aircraft, General Purpose Underwater Cables, Navy Formula No, 184 STANDARDS MILITARY MIL-STD-105 Sampl
4、ing P.rocedures and Tables MIL-STD- 129 for Inspection by Attributes Marking for Shipment and Storage FSC 1350 / Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-23773A 13 7979706 0303757 3 M - MIL-A-23773A (OS) DRAWINGS BUREAU OF NAVAL WEAPONS
5、Shi pin Pallet for Mine LD 479467 Anc or ark 56 Type 1l) 549694 Anchor, Underwater Mine, Mark 56 Mod 4 U) 549718 Anchor, Underwater Mine Mark 56 Mod 5 Ri CLASSIFICATION OF DEFECTS CD 2421432 Anchor, Underwater Mine, CD 2421477 Axhor, Underwater Mine, Mark 56 Mod 4 Mark 56 Mod 5 And all specification
6、s, standards and drawings listed there on. (Copies of specifications, standards, drawings, and publica- tions required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 . - T
7、he Anchor, Underwater Mine!, Mark 56 Mod 4 owrein after referred to as the mine anchor is a weigit, including a cable pay out device disengageakle from a mine after launching and operable to anchor the mine at a predetermined depth below the surface of the water. 3.2 1 re-. 3.2.1 rowtion . - A prepr
8、oduction le of the mine anEr shall be =ctured using the met ods and procedures pro osed for the production lot. The preproduction sample s all be prepared for delivery in accordance with Section 5. This sample will be inspected as specified in Section 4 herein and is for the purpose of determining t
9、hat the production meets the requirements of this specification and the design. Provision of the sample shall be in accordance with 4.3,l. R “Y 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-23773A 13 W 7779706 0303760 T W 30202 Fabrication,
10、 - The mine anchor shall be manufactured in accordance with NOSC LD 549694 or 549718, all documents listed therein, and as specified herein, Inspection and acceptance shall be in accordance with Section 4, 3:2,3 Conflicting requirements o - Conflicting requirements arsing between this specification
11、and any other specification, publication, or drawing listed herein shall be referred to the procuring agency or appointed agent in writing for interpretation, clarification and resolut ion, 30204 - Data, - No data is required by applicable documents referenced in Section 2, unless specified in the c
12、ontract or order, 3e3 Performance requirements and product charac- teristics. - The mine anchor and its components and assemblies wet the following performance requirements and product char ac ter is t ics: 30301 Sib-assembly requirements o 3030101 Tube and flange assembly leakam - The tube shall ex
13、hibit no leakage and flange assembly (Dwg, 2428 when tested in accordance with,2,1, 3030102 Safety device assembly leakaE, - The safety device assembly (Dwg, -9) shm exhibit no leakage when tested in accordance with 4,5,2,2, Hold-off nut disen a ement - The hold-off nut shall be threaded on the drum
14、 s a t so that, when the drum shaft is positioned with its threaded end protruding the minimum amount through the anchor housing wg. 1362676), eight (8) to nine (9) turns o-f the drum will cause the hold-0f.f nut (Ihvg, 1388051) to disengage from the finger (Dwg, 1388040) o w 3,302 l a. . . .I t. .,
15、 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-23773A 13 99999Ub U303761 L MIL-A-2377A (OS) 3.3.3 r as movemenlt. - As the nut moves free of the =shaf*rotation of the cable drum, the finger assembly (Dwg. 1388038) shall move free of the pawl
16、weldment (Dwg. 2419554) . 3.3.4 . - The drum as wound with cable and assembleMhe anchor, sAall rotate upon its shaft so as to successfully complete the running-in test of paragraph 4.5.2.6. 3.3.5 euil Out Tm. - The force required to pull the cable out of the cowtail shall be no greater than 100 poun
17、ds to successfully complete the pull out test of paragraph 4 . 5 . 2 o 8 . - The entire length of cable shall be coated with antifouling compound in accordance with the provisions of 4.5.2.3. 3.306 . s- f.lxuhes; coatinns, construction, . - Materials; finishes, coatings construction, or the mine anc
18、hor shall meet the requirements Examination 3.3.7 of u) 549694 or U) 549718 and this specification. shall be in accordance with 4.5.1. 3.4 - rem . 3.4.1 P_ressure. - The container assembly (Dwg. 2428484) of the mine anchor shall be capable of withstanding the pressure test of 4.6.1. all parts, compo
19、nents and the assembly shall be thoroughly cleaned of metal chips and other foreign matter. sharp edges shall be removed. 3.6 W . - The equipment including all parts and accesiisall be constructed and finished in a manner to assure compliance with all requirements of this specification. Particular a
20、ttention shall be paid to neatness and thoroughness of plating, marking of parts and assemblies, and freedom of parts from burrs and sharp edges. 3.5 U-. - Prior to and after final assembly Burrs and I 4 - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
21、,-,- MIL-A-23773A 13 U 9999906 0303762 3 . MIL-A-23773A (OS) The standard of workmanship exhibited in any approved preproduction sample, subject to any qualification stated in the Governments notice of approval, shall determine the requirements of the contract relative to workmanship insofar as not
22、specifically covered by applicable specifications. 40 QUALITY ASSURANCE PROVIS IONS 4.1 for i ection. - Unless otherwise spec if iewh supplier is responsible for the performance of all inspection requirements as specified herein. specified, the su plier may utilize his own facilities or any commerci
23、al la oratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4,2 tion of Itions. - Inspection of the items
24、 covered by this specificaxshall be classified as follows: tract oryurchase order, the Except as otherwise a, b. Quality conformance inspection (See 4.5) c. Periodic production inspection (See 4.6) Preproduction inspection (See 4.5 and 4.6) 4.3 ec t ion. 4,3.1 roducti_on . . - A preproduction sample
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILA23773A1967ANCHORUNDERWATERMINEMARK56MOD4ANDMOD5MARK56MOD4ANDMOD5 水雷 PDF

链接地址:http://www.mydoc123.com/p-976905.html