NAVY MIL-A-18977 D-1971 AMPLIFIER CHANNEL (FOR TORPEDO MARK 37 MODS 0 2 AND 3)《信道放大器(MARK 37 MODS 0 2 和 3鱼雷用)》.pdf
《NAVY MIL-A-18977 D-1971 AMPLIFIER CHANNEL (FOR TORPEDO MARK 37 MODS 0 2 AND 3)《信道放大器(MARK 37 MODS 0 2 和 3鱼雷用)》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-A-18977 D-1971 AMPLIFIER CHANNEL (FOR TORPEDO MARK 37 MODS 0 2 AND 3)《信道放大器(MARK 37 MODS 0 2 和 3鱼雷用)》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-A-l8977D( OS) 7 June 1971 Superseding MIL-A-18977C( OS) 7 April 1967 MILITARY SPECIFICA!TION (For Torpedo Mark 37 Mods O, 2, and 3) This specification has been approved by the Naval Ordnance Systems Command, Department of the Navy 1. SCOPE 1.1 Scope. This specification establishes the requiremen
2、ts for the procurement, inspection and test of an Amplifier kannel, LD 162565, LD 296726, and Drawing 1154877. 2. APPLIcABmDocs . 2.1 The following documents of the issue in effect on the date of invitation for bids or request for proposal form a part of this specifica- tion to the extent specified
3、herein. Military MIL-P-116 m-82590 Military m-m-105 Preservation, Methods of Enviromental Requirements and Tests (For Torpedo Mk 37 Components and Assenlies ) Sampling Procedures and Tables for Inspection by Attributes Marking for Shipment and Storage Palietized and Containerized Unit LOS, 40 “ x 4.
4、8 “ Pallets, Skids, Runners, or Pallet-Type Base l- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-mL-A-18977( OS) I l LD 162565 Servo Amplifier Assenibled, and Bu 1 r Mods 2 end 3) Rairai Ormnce Systeme Command ts and acirswiblies listed thereon I9
5、 296726. Servo AiiqlllfAer Aseenibled, and all parfis and subassenblies listed there- on (BW 0) IiD i6754 Shipping (Packing) Condition, For One Servo wlifier Assembly NAVORD Dcsg 694739 - Actuetor Assenibled HAVORD wg 696886 Servo AqplifSer Asdenibled (Mods Board# siibsssenibly 2 and 33 Swm wg 8m4Cr
6、7.- NAVORD wg 877408- Semo AmpZifer Assmibled (Mud 6) Schematic Wiring Magram I Amplifier Cbnnei Suassehan reports accompanying samples submitted for preproduction ad Priodic production testing), or by applicable documents referenced in Section 2 - unless specified in the contract or order (see 6.2)
7、. or order, preproduction samples of the amplifier channel shall be mu- factured using methods and procedures proposed for the production lot. The units shall be tested as specified in Section 4 herein and are for the purpose of determining, prior to starting production, that the contractorfs produc
8、tion methods are capable of producing amplifier channels that-com- . piy with the technical requirements of the contract, 3.2.3 Materials. Unless otherwise specrfied in the contract, requisi- tion, Or order, dl materials and purchased pvts entering into the final assdly of the amplifier channel shal
9、l conform to the detailed require- LD 296726, and Drawing ii54877. 3.2.2 Preproduction sample. Unless otherwise specified in the contract See 4.3.1. merits ind-gated on the drawings and specifications listed in LD 162565, 3.2.4 Finishes, coatings, construction, and dimensions. Finishes, coatings, co
10、nstruction, and dimensions for the amplifier channel shall be in accordance with the applicable drawings, specifications, and pblications listed in LD 16565, LD 296726, and Drawing ii54877. 3.2.5 Moisture, fungus, and corrosion. The amplifier channel shall be rendered moisture, fungus, and corrosion
11、 resistant in accordance with detail requirements specified in the drawings and specifications listed in LD 162565, LD 296726, and Drawing 1154877. When moisture, fungus, and corrosion resistance are not specified in these documents, the amplifier channel shall conform as required by NAVORD OS 6341
12、3.2.6 Marking. Marking of asseniblies, subassenblies, and parts shall be in accordance with the applicable drawings listed in LD 162565, LD 296726, an *awing 1154877. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I - - MIL-A-18977D 13 W 997770b 0
13、300083 L nt-A-i8977( OS) 3.2.7 Threads. Unless otherwise specified, ali threads SU be in accordance with ?ationa Bureau of Standards Handbook 328. fit for-threads shall be as specified on the applicable drawings. The class or I 3.2.8 Conflicting requremmts. In the event of conflict between the ocuni
14、ents referenced herein and the contents of this specification, the contents of this epecificetion shall apply. . 3.3 Performance reguir-nts and product characteristics. _The ampli- fier cliannels shall met the following Performance reauirements prouct characteristics. ferrea to hereafter are listed
15、on wawing 871408. al three smpifier channels shownon Drawing 877408 are identical. All references to termi- na3. connections in this test refer to connector P -. . k3.1 Preproduction. A preproduction sample of five amplifier channels, manufactured in accordance with 3.2.2, SU be subjectei to the pre
16、produc- tion tests detailed in 4.4 at an activity designated by the procuring activi- ty, Acceptance of the preproduction ssmple shall be based on no defects in the sample. prior to the approval of the preproduction sample, shall be at the suppliers risk. I Further production of the amplifier channe
17、l by the supplier, 4.3.2 Lot size. Unless otherwise specified in the contract or order, each shipment of units of product shall he a separate “inspection lot“ and my differ from the quantity specifiedin the total order or contract In any event, ail units of a single “inspection lot“ shall be made to
18、 the same design, with the same materials and manufacturing techniques, and shall be part of one continuous production run. 4.3.3 Periodic production amples. bom each succeeaing lot or grand 4.5$ a random sample of five amplifier channels will be selected for sub- dssion to an activity designated by
19、 the procuring activity to determine compliance of the samples with the requirements of the contract, specifi- cation, and drawings. The amplifier channels shall be considere satis- factory if they meet all specificstion and pertinent drawings requirements Wd withetand the tests specified in 4.4 an
20、4.5, Failure of the periodic iproduction sample to comply with these requirements will result in the rejection of the lot, as determined by the procuring activity. 1 lot of 300 or less that have passed the quality conformance inspection of 6 Provided by IHSNot for ResaleNo reproduction or networking
21、 permitted without license from IHS-,-,-I HIL-A-L777D 13 R 7777906 0300086 i MIL-A-18977 ( OS) 4.4 i?reproduction and periodic production inspection. The preproduction and periodic production samples, after satisfactorily passing the quality coaformance inspections detailed in 4.5, shall be subjecte
22、d to the fol- lowing tests and examinations, Certified inspection data covering the re- sults of preproduction and periodic production inspections shall be for- warded- to the procuring activity. 4.4.1 Vibration 4.4.1.1 Mounting. The amplifier channel, less pack or packaging, shall be mounted in the
23、 servo amplifier case. The case, mounted securely to a vibration device by means of its mounting holes, shall be tested as spec- fied in 4.4.1.2 and 4.4.1.3. 4.4.1.2 Vibration, nonoperating. The amplifier channel shall be subjected to the “Vibration, nonoperating“ test of 1-82590 and there- after sh
24、all meet the requiremmts of 3.4.1.1. 4.4.1.3 Vibration, operating. The amplifier channel shall be sub- jected to the “Vibration, operating“ test of 1-82590 and during and thereafter shall meet the requiremnts of 3.4.1.2. 4.4.2 Temperature and humidity 4.4.2.1 High temperature and humidity, nonoperat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILA18977D1971AMPLIFIERCHANNELFORTORPEDOMARK37MODS02AND3 信道 放大器 MARK37MODS02 鱼雷 PDF

链接地址:http://www.mydoc123.com/p-976837.html