NASA UFGS-42 22 13 00 40-2011 CENTRIFUGAL PROCESS CHILLERS AND COOLERS《离心工艺的冷却装置和冷却器》.pdf
《NASA UFGS-42 22 13 00 40-2011 CENTRIFUGAL PROCESS CHILLERS AND COOLERS《离心工艺的冷却装置和冷却器》.pdf》由会员分享,可在线阅读,更多相关《NASA UFGS-42 22 13 00 40-2011 CENTRIFUGAL PROCESS CHILLERS AND COOLERS《离心工艺的冷却装置和冷却器》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-42 22 13.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-42 22 13 (May 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2011*SECTION TABLE OF CONTENTSDIVISION 42 - PROCESS HEATING, COOLING, AND DRYING
2、EQUIPMENTSECTION 42 22 13.00 40CENTRIFUGAL PROCESS CHILLERS AND COOLERS02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 SYSTEM DESCRIPTION1.3.1 Equipment and Performance Data1.3.2 Required Drawings and Diagrams1.4 QUALITY ASSURANCE1.4.1 Equipment and Performance Data1.4.2 Referenced Standards Cert
3、ificatesPART 2 PRODUCTS2.1 CENTRIFUGAL WATER-CHILLER PACKAGE2.2 COMPRESSOR2.3 CONDENSER2.4 COOLER (REFRIGERANT EVAPORATOR)2.5 PURGE SYSTEM2.6 CONTROL AND CONTROL PANELS2.7 MOTORS2.8 INSULATION2.9 VIBRATION ISOLATION2.10 SPECIAL TOOLSPART 3 EXECUTION3.1 INSTALLATION3.2 MANUFACTURERS REPRESENTATIVE3.3
4、 REFRIGERANT AND OIL CHARGE3.4 ALIGNMENT3.5 FIELD TESTING- End of Section Table of Contents -SECTION 42 22 13.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-42 22 13.00 40 (February 2011)-Preparing Ac
5、tivity: NASA SupersedingUFGS-42 22 13 (May 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2011*SECTION 42 22 13.00 40CENTRIFUGAL PROCESS CHILLERS AND COOLERS02/11*NOTE: This specification covers the requirements for packaged self-contained hermetic co
6、mpressor units. Rewrite if unit is not self-contained per definition.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not requir
7、ed in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in
8、 the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to au
9、tomatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publi
10、sh print process.SECTION 42 22 13.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic des
11、ignation only.AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)AHRI 480 (2007) Refrigerant-Cooled Liquid Coolers, Remote TypeAHRI 550/590 (2003) Performance Rating of Water-Chilling Packages Using the Vapor Compression CycleANSI/AHRI 520 (2004) Performance Rating of Positive Displacement
12、Condensing UnitsAMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)ASHRAE EQUIP SI HDBK (2008; Errata 1 2010) Handbook, HVAC Systems and Equipment (SI Edition)ASME INTERNATIONAL (ASME)ASME BPVC SEC VIII D1 (2007; Addenda 2008; Addenda 2009) BPVC Section VIII-Rules for
13、Construction of Pressure Vessels Division 1INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)ISO 1940-1 (2003; Cor 2005) Mechanical Vibration - Balance Quality Requirements for Rotors in a Constant (Rigid) State - Part 1: Specification and Verification of BalanceNATIONAL ELECTRICAL MANUFACTURERS A
14、SSOCIATION (NEMA)NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)NEMA MG 1 (2009) Motors and GeneratorsU.S. DEPARTMENT OF ENERGY (DOE)DOE CE-2 (2000) How to Buy an Energy-Efficient Water-Cooled Electric ChillerDOE CE-6 (2000) How to Buy an Energy-Efficient Air-Cooled Electric
15、 Chiller1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Keep submittals to the SECTION 42 22 13.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or
16、 networking permitted without license from IHS-,-,-minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex
17、 and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used fo
18、llowing the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident
19、Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with
20、 a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Sectio
21、n 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsMaterial, Equipment, and Fixture Lists; G; G, _SD-02 Shop DrawingsConnection Diagrams; G; G, _Control Diagrams; G; G, _Installation Drawings; G; G, _Record Drawings; G; G, _SD-03 Product DataCentrifugal Water-Chiller; G; G, _Compressor;
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASAUFGS42221300402011CENTRIFUGALPROCESSCHILLERSANDCOOLERS 离心 工艺 冷却 装置 冷却器 PDF

链接地址:http://www.mydoc123.com/p-836610.html