1、 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MPR 8823.1 REVISION D EFFECTIVE DATE: October 20, 2008 EXPIRATION DATE: October 20, 2013 MARSHALL PROCEDURAL REQUIREMENTS AS01 DESIGN CONTROL OF FACILITIES Provided
2、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 Design Control of Facilities MPR 8823.1 Revision: D Date: October 20, 2008 Page 2 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VE
3、RIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 12/13/99 Revision A 6/14/01 Extensive rewrite to incorporate ISO 9001:2000. Revision B 9/27/2004 Changed title to “Marshall Procedural Req
4、uirements.” Changed “MPG” to “MPR,” “will” to “shall,” and “must” to “shall” in various paragraphs. Reflects minor editorial changes. Revision C 8/22/2005 Revised to reflect organizational changes. Revision D 10/20/2008 Revised applicability statement and organizational change in paragraph 2.4. Revi
5、sed paragraph P.1 to add MAF. Revised paragraphs 1.4 and 1.5. Revised paragraphs 2.1.2, 2.2.3, 2.2.5, 2.4.1, 2.5.1, 3.1, 3.2.2, 3.2.5, 3.6 and 4.0 to separate the “Shalls.” Added reference NPR 1441.1 to Paragraph 4. Provided by IHSNot for ResaleNo reproduction or networking permitted without license
6、 from IHS-,-,-Marshall Procedural Requirements AS01 Design Control of Facilities MPR 8823.1 Revision: D Date: October 20, 2008 Page 3 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS Preface
7、P.1 Purpose P.2 Applicability P.3 Authority P.4 Applicable Documents P.5 References P.6 Cancellation Document Content 1. Definitions 2. Responsibilities 3. Procedures 4. Records 5. Flow Diagram Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall
8、 Procedural Requirements AS01 Design Control of Facilities MPR 8823.1 Revision: D Date: October 20, 2008 Page 4 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE PREFACE P.1 PURPOSE This Marshall Procedural Req
9、uirements (MPR) defines the methods and responsibilities for design control of facility designs at the Marshall Space Flight Center (MSFC) and MSFCs Michoud Assembly Facility (MAF). P.2 APPLICABILITY This MPR applies to the personnel, programs, projects, and activities at MSFC and MSFCs MAF, includi
10、ng contractors and resident agencies to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.) P.3 AUTHORITY NPD 8820
11、.2, “Design and Construction of Facilities” P.4 APPLICABLE DOCUMENTS a. NPR 1441.1, “NASA Records Retention Schedules (NRRS)” b. MPR 1440.2, “MSFC Records Management Program” c. MPR 5000.1, “Purchasing” P.5 REFERENCES None P.6 CANCELLATION MPR 8823.1C dated August 22, 2005 Original signed by David A
12、. King Director Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 Design Control of Facilities MPR 8823.1 Revision: D Date: October 20, 2008 Page 5 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/dir
13、ectives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT CONTENT 1. DEFINITIONS 1.1 Design and Development Input. Functional, special, statutory, regulatory, and performance requirements that the product has to meet. 1.2 Design and Development Output/Product. Result of the
14、design process such as design drawings, specifications, sketches, instructions, etc. The design output is the product for this MPR. 1.3 Design and Development Process. An organized effort by qualified personnel to create design output that produces a product that meets the design input requirements.
15、 1.4 Design and Development Validation. Confirmation by examination and objective evidence that specified requirements for the design output/product are fulfilled. 1.5 Design Organization. The MSFC organization responsible for the design. The design organization may use a qualified design firm for t
16、he design production. 1.6 Facility. Land, buildings, structures, and other real property improvements including utility systems and collateral equipment. The term does not include operating materials, supplies, special tooling, special test equipment, flight hardware, and noncapitalized equipment. T
17、he term facility is used in connection with land, buildings (facilities having the basic function to enclose usable space), structures (facilities having the basic function of a research or operational activity), and other real property improvements. 1.7 Product User. The MSFC or contractor organiza
18、tion that requests facility design services from the design organization. 2. RESPONSIBILITIES 2.1 Product User shall: 2.1.1 Request design services from the design organization. Design requests shall be documented. 2.1.2 Provide functional, special, and performance requirements that the product shal
19、l meet. 2.1.2.1 Product requirements shall be reviewed for adequacy. 2.1.2.2 Requirements shall be complete, unambiguous, not in conflict with each other, and documented. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirement
20、s AS01 Design Control of Facilities MPR 8823.1 Revision: D Date: October 20, 2008 Page 6 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 2.1.3 Participate in design reviews to verify that the design meets all
21、 users requirements at the various stages of the design process. Design verification, including any necessary actions, shall be documented. 2.1.4 Validate the design at design completion to ensure the product conforms to the defined users requirements. Design validation, including any necessary acti
22、ons, shall be documented. 2.2 Design Organization shall: 2.2.1 Establish and maintain plans and procedures to plan and control the design and development of facility designs in order to ensure the product users requirements are met. Plans and procedures shall: 2.2.1.1 Determine the design and develo
23、pment stages and the review, verification, and validation that are appropriate to each design. 2.2.1.2 Determine the responsibilities and authorities for design and development. 2.2.1.3 Provide for updating, as appropriate, the planning output as the design and development progresses. 2.2.1.4 Be doc
24、umented by the design organization and approved by the Manager, Facilities Management Office (FMO). 2.2.2 Assign qualified personnel, equipped with adequate resources, to each design activity. 2.2.3 Provide facility design input requirements relating to the product, including facility statutory and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMPR88231REVD2008DESIGNCONTROLOFFACILITIES 设施 设计 控制 PDF

链接地址:http://www.mydoc123.com/p-822889.html