1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 - TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU-!).4%.!.#%G0 ).4%2.!4)/.!,G0G042!.3-)33)/.G0G03934%-3!.!,/5%G9“2).).G0G0!G0G0.%7G0G0).4%2.!4)/.!,42!.3-)33)/.G0G03934%-G0G0).4/3%26)#%)45G134G0G0RecommendationG0G0- (Extract from the “LUEG0“OOK)NOTES1 ITU-T
2、Recommendation M.450 was published in Fascicle IV.1 of the Blue Book. This file is an extract fromthe Blue Book. While the presentation and layout of the text might be slightly different from the Blue Book version, thecontents of the file are identical to the Blue Book version and copyright conditio
3、ns remain unchanged (see below).2 In this Recommendation, the expression “Administration” is used for conciseness to indicate both atelecommunication administration and a recognized operating agency. ITU 1988, 1993All rights reserved. No part of this publication may be reproduced or utilized in any
4、form or by any means, electronic ormechanical, including photocopying and microfilm, without permission in writing from the ITU.Fascicle IV.1 - Rec. M.450 1Recommendation M.450Fascicle IV.1 - Rec. M.450BRINGING A NEW INTERNATIONAL TRANSMISSIONSYSTEM INTO SERVICE1 Preliminary exchange of informationA
5、s soon as Administrations have decided to bring a new international transmission system into service, thenecessary contacts are made between their technical services1)for the exchange of information. Those services jointlyselect the control and sub-control stations for the new system (see Recommenda
6、tions M.80 and M.90).The technical service of each Administration is responsible for the setting-up and lining-up of the line sectionson its territory and for arranging that the adjustments and tests required are made by the repeater station staff concerned.To set up a line section which crosses a f
7、rontier, Administrations should arrive at bilateral arrangements on thebasis of CCITT Recommendations and, for radio-relay sections, the Recommendations of the CCIR.2 Setting up sections crossing a frontier2.1 Radio-relay sectionDetails of the following points will have been settled by a bilateral a
8、greement between the technical services ofAdministrations: geographical position of the radio-relay station nearest to the frontier; contour of the terrain of the radio section crossing the frontier, with details of the height of the antennaeabove normal level; directivity characteristic and gain of
9、 the antennae; radio-frequency channel arrangement (centre frequency, polarization, intermediate frequency); provision of supervisory system; radio equipment line-regulating pilots (if any); continuity pilots, used for supervising the radio-relay link, in accordance with theCCIR Recommendations on t
10、he frequency and frequency deviation of this signal, each countrytransmitting the pilot required by the system in the receiving country; noise measurement channels outside the transmitted baseband; total noise for the radio-relay section; frequency deviation of the telephony channel the level of whi
11、ch at the centre frequency is unaffected bypre-emphasis (either of the telephony channel itself or of the radio-frequency channel of the system); pre-emphasis characteristics of the radio-frequency channel; service, supervisory and remote channel circuits; level, frequency and coding of the signals
12、transmitted over these lines; protective switching equipment; interconnection points T, R, T, R (see Figure 1/M.450) defined in Recommendation G.213 1 (seealso 2 and especially the return loss at points R and R if required (see CCIR Recommendation 380 3for values)._1)The technical service represents
13、 the appropriate authorities within the international maintenance organization of an Administrationwhich have the responsibility for making international agreements on engineering provision and maintenance matters, specifyingprovision and maintenance facilities, determining engineering and maintenan
14、ce policy and overseeing its implementation.2 Fascicle IV.1 - Rec. M.450FIGURE 1/M.450Interconnection points T, R, T , Rd01-scw2.2 Coaxial-pair line sectionDetails of the following points will have been settled by bilateral agreement between the technical services ofthe Administrations: the choice o
15、f the frequency arrangement to be adopted; the pilot signals to be used for regulating the line, in accordance with CCITT Recommendations on thefrequency and level of such signals, each country transmitting the pilot signals required by the equipmentof the other country (see the table in Recommendat
16、ion M.540 indicating the pilot frequencies for varioussystems); service, supervisory and remote control circuits; repeater identification method and frequencies for fault location and monitoring on transistorized systems; provisions for remote power feeding, where a section of the supply line crosse
17、s the frontier; the regulation systems used by each country; the nominal level at various frequencies, at the output of the frontier repeater.Concerning this last item, at the incoming point, each Administration should as far as possible accept theconditions usual for the system of the other country
18、.During the lining-up tests, the relative power level measured at the output of the repeater in the unburiedrepeater station nearest to the frontier should not differ, for any frequency, by more than 2 dB from the nominal value(as defined by a graph drawn up beforehand and based on the characteristi
19、cs of the system in question).The frequencies used in lining up the line are determined by agreement between the Administrationsconcerned. Experience shows that, provided the number of test frequencies required is not too large, it is useful to makethese tests at frequencies lying very close to each
20、 other at the edges of the frequency band, or at points whereirregularities have to be corrected, and at frequencies less close to each other elsewhere in the band.If the necessary test equipment is available sweep measurements can substantially facilitate the line-upprocedure. But in this case also
21、, some test frequencies have to be agreed upon to obtain reference values for later in-service maintenance measurements.Fascicle IV.1 - Rec. M.450 32.3 Symmetric-pair line sectionThe following points will have been settled by bilateral agreement between the Administrations: frequency allocation; pil
22、ots (see the table in Recommendation M.540 indicating the pilot frequencies for various systems); service, supervisory or remote control lines, etc.; repeater identification method and frequencies for fault location and monitoring on transistorized systems; provisions for remote power feeding, where
23、 a section of the supply line crosses the frontier.When a symmetric-pair line section crossing a frontier section is first set up, tests should be made at clearlydefined frequencies to determine the insertion loss/frequency characteristics. For example, frequencies spaced at thefollowing intervals c
24、ould be used, except at the edges of the band, where more closely spaced measuring frequencies aredesirable.4 kHz between 12 kHz and 60 kHz,8 kHz between 60 kHz and 108 kHz,12 kHz between 108 kHz and 252 kHz,24 kHz between 288 kHz and 552 kHz.The conditions for making measurements at line-pilot freq
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTM4501988BRINGINGANEWINTERNATIONALTRANSMISSIONSYSTEMINTOSERVICE 一个 国际 传输 系统 投入 业务 PDF

链接地址:http://www.mydoc123.com/p-799817.html