ITU-T M 1540-1994 Exchange of Information for Planned Outages of Transmission Systems - Maintenance Designations and Information Exchange (Study Group 4) 7 pp《输电系统计划停电信息的交换-维修 番号和信.pdf
《ITU-T M 1540-1994 Exchange of Information for Planned Outages of Transmission Systems - Maintenance Designations and Information Exchange (Study Group 4) 7 pp《输电系统计划停电信息的交换-维修 番号和信.pdf》由会员分享,可在线阅读,更多相关《ITU-T M 1540-1994 Exchange of Information for Planned Outages of Transmission Systems - Maintenance Designations and Information Exchange (Study Group 4) 7 pp《输电系统计划停电信息的交换-维修 番号和信.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU MAINTENANCE: DESIGNATIONS AND INFORMATION EXCHANGE M.1540 (1 0/94) EXCHANGE OF INFORMATION FOR PLANNED OUTAGES OF TRANSMISSION SYSTEMS ITU-T Recommendation M.1540 (Previously “CCIlT Recommendation”) ITU-T REC
2、MN*M.1540 74 4862573 O600070 760 m FOREWORD The ITU-T (Telecommunication Standardization Sector) is a permanent organ of the International Telecommunication Union (ITU). The ITU-T is responsible for studying technical, operating and tariff questions and issuing Recommen- dations on them with a view
3、to standardizing telecommunications on a worldwide basis. The World Telecommunication Standardization Conference (WTSC), which meets every four years, establishes the topics for study by the ITU-T Study Groups which, in their turn, produce Recommendations on these topics. The approval of Recommendat
4、ions by the Members of the ITU-T is covered by the procedure laid down in WTSC Resolution No. 1 (Helsinki, March 1-12, 1993). ITU-T Recommendation M.1540 was revised by ITU-T Study Group 4 (1993-1996) and was approved under the WTSC Resolution No. 1 procedure on the 15th of October 1994. NOTE In thi
5、s Recommendation, the expression ?Administration? is used for conciseness to indicate both a telecommunication administration and a recognized operating agency. O ITU 1995 All rights reserved. No part of this publication may be reproduced or utilized in any form or by any means, electronic or mechan
6、ical, including photocopying and microfilm, without permission in writing from the ITU. ITU-T RECMN*M*L540 94 48b2591 0600071 bT7 CONTENTS Page 1 General . 1 2 Planned outages of international analogue, PDH and SDH transmission systems 1 3 Planned outages of national transmission systems, which affe
7、ct international leased and special circuits 3 Reference . 3 Recommendation M.1540 (10/94) 1 ITU-T RECMN*M-I54O 911 11862573 Ob00072 533 Recommendation M.1540 EXCHANGE OF INFORMATION FOR PLANNED OUTAGES OF TRANSMISSION SYSTEMS (Published as M.221 in 1976; revised and renumbered us M.490 in 1984; rev
8、ised and renumbered as M. 1540 in 1994) 1 General Planned outages of transmission systems are required to allow planned work to be done with the minimum impairement to the service concerned. All tests, measurements, rearrangements, etc., which are not attributed directly to a failure - and are known
9、 in advance - are considered to be planned work. Such work will include installation of new equipment, routine maintenance, work on power supply equipment and in some cases, work for the clearance of faults which at first could only be remedied provisionally (mainly cable faults). In the event of pl
10、anned work which results in the complete or partial interruption in a transmission system, efforts are at first made to reroute the telecommunication traffic as required. If special restoration plans exist for cases of faults, these pians can also be used in the event of planned outages. Should rero
11、uting be impossible, planned work is generally carried out during periods of light traffic, e.g. at night. To allow appropriate measures to be taken, all stations affected by the planned outage must be informed in good time. 2 Planned outages of international analogue, PDH and SDH transmission syste
12、ms When an Administration plans the outage of an international transmission system, it should inform all other Administrations in whose territories the links terminate. This information should be given by telex, fax, etc. at least three working days in advance.l) When an outage is expected to affect
13、 QOS to a customer, it is deemed necessary to notify the Administrations at least 17 days in advance. An example is given in Figure 1. There are cases in which more than three days are necessary, such as those involving extensive rearrangements. If, in exceptional cases, a three-day notice cannot be
14、 given, advice should be given by telephone so as to ensure that the Administrations Concerned still have sufficient time to take the appropriate steps. Planned outages should not be carried out if notice cannot be given and received at least 24 hours in advance. In practice, Administrations have en
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTM15401994EXCHANGEOFINFORMATIONFORPLANNEDOUTAGESOFTRANSMISSIONSYSTEMSMAINTENANCEDESIGNATIONSANDINFORMATIONEXCHANGESTUDYGROUP47PP

链接地址:http://www.mydoc123.com/p-799752.html