ITU-T HDBK VOL IX TMM-1989 Testing Methods and Measuring Apparatus (Volume IX)《测试方法和测量装置 第15册》.pdf
《ITU-T HDBK VOL IX TMM-1989 Testing Methods and Measuring Apparatus (Volume IX)《测试方法和测量装置 第15册》.pdf》由会员分享,可在线阅读,更多相关《ITU-T HDBK VOL IX TMM-1989 Testing Methods and Measuring Apparatus (Volume IX)《测试方法和测量装置 第15册》.pdf(280页珍藏版)》请在麦多课文档分享上搜索。
1、9Bb2573 0683567 7Yb m INTERNATIONAL TELECOMMUNICATION UNION CCITT THE INTERNATIONAL TELEGRAPH AND TELEPHONE CON SU LTATIVE COM M IlTEE DIRECTIVES concerning the protection of telecommunication lines against harmful effects from electric power and electrified railway lines VOLUME IX TESTING METHODS A
2、ND M EASU RI NG APPARATUS Geneva 1989 4862591 0683570 468 INTERNATIONAL TELECOMMUNICATION UNION CCITT THE INTERNATIONAL TELEGRAPH AND TELEPHONE CONSULTATIVE COMMITTEE DIRECTIVES concerning the protection of telecommunication lines against harmful effects from electric power and electrified railway l
3、ines VOLUME IX TESTING METHODS AND M EASU RI NG APPARATUS Geneva 1989 ISBN 92-61 -04101 -9 0 I.T.U. PREFACE The rapid development of new technologies in telecommunications, electric power transmission and distrib- ution, and electric railway systems has made the earlier issue of the Directives (1960
4、 edition) out-of-date and this former issue is therefore being replaced completely. The present Directives (1988 edition) have been established by the International Telegraph and Telephone Consultative Committee (CCIIT) to give clear advice on how adverse electromagnetic effects on telecommunication
5、s lines from nearby electric power or electric railway installations may be minimized. The Directives have been based on the latest information that is available. The new Directives have been prepared in close cooperation with the following international organizations : - the International Union of
6、Railways (UIC) - the International Conference on Large High Voltage Electric Systems (CIGRE). Representatives from these organizations have participated in preparation of the text of the Directives. The two organizations support the underlying principles from which these texts have been derived, and
7、 the guidelines in the Directives which have been given. Such guidelines normally relate to general cases which are described. It is left to national organizations to establish more detailed regulations which apply to particular cases. The new Directives are divided into a series of separate volumes
8、, each dealing with a particular part of the complete subject. Each volume can be used independently. Modern calculation methods which are suitable for compu- ter techniques have been incorporated. Numerical values are used to define desirable limits which should be followed when the recommended tec
9、hnical measures are taken. In general, it should not be necessary to exceed these limits, although some special cases may arise where it is either uneconomical or impractical to do so (e.g. in narrow valleys). In such cases, mutual agree- ment based on the principles set out in the Directives should
10、 be reached. Guidance on administration, economic and particularly legislation matters have been omitted deliberately since they are considered to be outside the technical scope of the advice given in the new Directives. In consequence, the rules of procedure which should be followed by telecommunic
11、ations operators, and electric power and electric rail- way authorities have not been covered. Nevertheless, the three international organizations which have worked together to produce the new Direc- tives, CCIT, UIC and CIGRE, recommend that : “Telecommunications, electric power and electric railwa
12、y authorities should work together closely and fol- low the new Directives when seeking solutions to mutual problems. The solutions chosen should be those most accept- able and economical overall, and should not confer undue advantages to any participant. We, the undersigned, representing the three
13、organizations, CCIT, UIC and CIGRE, support the work done jointly on behalf of our organizations in producing these Directives. We recommend these Directives to members of CCIIT, UIC and CIGRE who seek solutions to mutual disturbance problems.” Th. IRMER Director of the CCIT J. BOULEY Secretary-Gene
14、ral of UIC G. LEROY Secreta ry-General of CIGRE n 6 - - LtBb2591 Ob3181573 177 - TABLE OF CONTENTS Page CHAPTER 1 . INTRODUCTION . 1.1 1.2 Aim and scope of the Directives Structure of the Directives . 1.2.1 Content of individual volumes . 1.2.2 Use of the Directives 1.2.2.1 1.2.2.2 1.2.2.3 When stud
15、ying coupling processes in general . When establishing standards or similar regulations . When dealing with danger and disturbance problems in practice . Introduction to Volume IX 1.3 CHAFE% 2 - MEASURING APPARATUS Pulse generators for load testing (voltage, current or energy) 2.1 2.1.1 2.1.2 2.1.3
16、2.1.4 Fundamental aspects Generators for insulation testing . 2.1.2.1 Generator having the voltage shape 12/50 p for simulating overvoltages 2.1.2.2 Generator having the voltage shape 10/100 ps for simulating lightning 2.1.2.3 Generator having a constant voltage slope for testing gas-discharge tube
17、and spark gaps according to Recommendation K.12 Generators for testing the current loading capacity with defined current shapes at low- impedance load 2.1.3.1 Generators for testing the current loading capacity of gas discharge tub es . 2.1.3.2 Generators for testing semiconductor limiting devices s
18、uch as varistors and Zener diodes . Generators for testing the energy loading capacity of test items with different load resistances 2.1.4.1 Testing the loading capacity of communications equipment with a 2.1.4.2 Generator for simulating lightning surges in indoor lines 2.1.4.3 Generator for simulat
19、ing overvoltages in the low-voltage supply system . 2.1.4.4 Generator for simulating destructive switching surges for testing relays due to lightning . surges of lengthy duration . generator according to Recommendation K . 17 . 2.2 Generators for testing interference rejection 2.2.1 Fundamental aspe
20、cts 2.2.2 Generator for simulating disturbance caused by the disconnection of electrical equipment (“burst“ generator) 1 1 2 2 3 3 3 3 5 7 7 7 8 14 15 15 17 21 22 22 24 26 28 29 31 31 37 Volume M . Table of Contents V Previous page is blank . 48b2591 Ob81574 003 2.2.3 Generator for simulating static
21、 discharges 2.2.4 Test generator developed for testing electronic relays (protection circuit) in high- voltage installations according to IEC Publication 255-4 2.2.5 Test generators for special cases . Noise measurements and noise meters . 2.3.1 Introduction . 2.3.2 Weighted noise measurements . 2.3
22、.2.1 Definitions and general remarks 2.3.2.2 Broadband noise meters 2.3.2.3 Measurements with selective voltmeters . 2.3.3 Impulsive noise measurements . 2.3.4 Quantizing distortion noise measurements 2.3.4.1 General aspects . 2.3.4.2 Measurement procedures . Measurement of bit error ratio . 2.4.1 M
23、easuring principles 2.4.2 Measuring practice . Instruments for field strength measurement . 2.5.1 Electromagnetic radio frequency fields 2.5.1.1 Frequency range 2.5.1.2 Propagation . 2.5.1.3 Relationship between E and H Measurement of interfering fields . 2.5.2.1 Use of interference field strength m
24、easurements for EMC . Measurement of magnetic field strength H . 2.5.3.1 Open-circuit voltage of the untuned loop antenna . 2.5.3.2 Short-circuit cmnt of loop antenna . 2.5.3.3 Tuned loop antenna . 2.5.3.4 Calibration of the tuned antenna . 2.5.3.5 Protection against electric fields Measurement of t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTHDBKVOLIXTMM1989TESTINGMETHODSANDMEASURINGAPPARATUSVOLUMEIX 测试 方法 测量 装置 15 PDF

链接地址:http://www.mydoc123.com/p-798029.html