ITU-T E 520-1993 NUMBER OF CIRCUITS TO BE PROVIDED IN AUTOMATIC AND OR SEMIAUTOMATIC OPERATION WITHOUT OVERFLOW FACILITIES《无溢出设备时 在自动和 或半自动运营中提供的电路数》.pdf
《ITU-T E 520-1993 NUMBER OF CIRCUITS TO BE PROVIDED IN AUTOMATIC AND OR SEMIAUTOMATIC OPERATION WITHOUT OVERFLOW FACILITIES《无溢出设备时 在自动和 或半自动运营中提供的电路数》.pdf》由会员分享,可在线阅读,更多相关《ITU-T E 520-1993 NUMBER OF CIRCUITS TO BE PROVIDED IN AUTOMATIC AND OR SEMIAUTOMATIC OPERATION WITHOUT OVERFLOW FACILITIES《无溢出设备时 在自动和 或半自动运营中提供的电路数》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 % TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU4%,%0(/.%G0G0.%47/2+G0G0!.$G0G0)3$.15!,)49G0G0/ in semiautomatic operation; in both automatic and semiautomatic operations on the same group of circuits.1 General method1.1 The CCITT recommends that the numbe
2、r of circuits needed for a group should be read from tables or curvesbased on the classical Erlang B formula (see Supplements Nos. 1 and 2 at the end of this fascicle which refers to fullavailability groups). Recommended methods for traffic determination are indicated in Recommendation E.500.For sem
3、i-automatic operation the loss probability p should be based on 3% during the mean busy hour.For automatic operation the loss probability p should be based on 1% during the mean busy hour.Semiautomatic traffic using the same circuits as automatic traffic is to be added to the automatic traffic and t
4、hesame parameter value of p = 1% should be used for the total traffic.The values of 3% and 1% quoted above refer to the Erlang B formula and derived tables and curves. The 3%value should not be considered as determining a grade of service because with semiautomatic operation there will besome smooth
5、ing of the traffic peaks; it is quoted here only to determine the value of the parameter p (loss probability)to use in the Erlang B tables and curves.1.2 In order to provide a satisfactory grade of service both for the mean busy-hour traffic and for the traffic onexceptionally busy days, it is recom
6、mended that the proposed number of circuits should, if necessary, be increased toensure that the loss probability shall not exceed 7% during the mean busy hour for the average traffic estimated for thefive busiest days as specified in Recommendation E.500.1.3 For small groups of long intercontinenta
7、l circuits with automatic operation some relaxation could be made inrespect to loss probability. It is envisaged that such circuits would be operated on a both-way basis and that areasonable minimum for automatic service would be a group of six circuits. A table providing relaxation in Annex A isbas
8、ed on a loss probability of 3% for six circuits, with a smooth progression to 1% for 20 circuits. The generalprovision for exceptional days remains unchanged.For exceptional circumstances in which very small groups (less than six intercontinental circuits) are used forautomatic operation, dimensioni
9、ng of the group should be based on the loss probability of 3%.2 Time differencesTime differences at the two terminations of intercontinental circuits are likely to be much more pronouncedthan those on continental circuits. In order to allow for differences on groups containing both-way circuits it w
10、ill bedesirable to acquire information in respect to traffic flow both during the mean busy hour for both directions andduring the mean busy hour for each direction.It is possible that in some cases overflow traffic can be accepted without any necessity to increase the numberof circuits, in spite of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTE5201993NUMBEROFCIRCUITSTOBEPROVIDEDINAUTOMATICANDORSEMIAUTOMATICOPERATIONWITHOUTOVERFLOWFACILITIES

链接地址:http://www.mydoc123.com/p-795294.html