1、 International Telecommunication Union ITU-T A.8TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (10/2008) SERIES A: ORGANIZATION OF THE WORK OF ITU-T Alternative approval process for new and revised ITU-T Recommendations Recommendation ITU-T A.8 Rec. ITU-T A.8 (10/2008) i Recommendation ITU-T A.8 Al
2、ternative approval process for new and revised ITU-T Recommendations Summary This Recommendation provides working methods and procedures for approving draft new and revised ITU-T Recommendations using the alternative approval process. Source Recommendation ITU-T A.8 was prepared by TSAG (2005-2008)
3、and approved by the World Telecommunication Standardization Assembly (Johannesburg, 21-30 October 2008). ii Rec. ITU-T A.8 (10/2008) FOREWORD The International Telecommunication Union (ITU) is the United Nations specialized agency in the field of telecommunications, information and communication tec
4、hnologies (ICTs). The ITU Telecommunication Standardization Sector (ITU-T) is a permanent organ of ITU. ITU-T is responsible for studying technical, operating and tariff questions and issuing Recommendations on them with a view to standardizing telecommunications on a worldwide basis. The World Tele
5、communication Standardization Assembly (WTSA), which meets every four years, establishes the topics for study by the ITU-T study groups which, in turn, produce Recommendations on these topics. The approval of ITU-T Recommendations is covered by the procedure laid down in WTSA Resolution 1. In some a
6、reas of information technology which fall within ITU-Ts purview, the necessary standards are prepared on a collaborative basis with ISO and IEC. NOTE In this Recommendation, the expression “Administration“ is used for conciseness to indicate both a telecommunication administration and a recognized o
7、perating agency. Compliance with this Recommendation is voluntary. However, the Recommendation may contain certain mandatory provisions (to ensure e.g. interoperability or applicability) and compliance with the Recommendation is achieved when all of these mandatory provisions are met. The words “sha
8、ll“ or some other obligatory language such as “must“ and the negative equivalents are used to express requirements. The use of such words does not suggest that compliance with the Recommendation is required of any party. INTELLECTUAL PROPERTY RIGHTS ITU draws attention to the possibility that the pr
9、actice or implementation of this Recommendation may involve the use of a claimed Intellectual Property Right. ITU takes no position concerning the evidence, validity or applicability of claimed Intellectual Property Rights, whether asserted by ITU members or others outside of the Recommendation deve
10、lopment process. As of the date of approval of this Recommendation, ITU had not received notice of intellectual property, protected by patents, which may be required to implement this Recommendation. However, implementers are cautioned that this may not represent the latest information and are there
11、fore strongly urged to consult the TSB patent database at http:/www.itu.int/ITU-T/ipr/. ITU 2009 All rights reserved. No part of this publication may be reproduced, by any means whatsoever, without the prior written permission of ITU. Rec. ITU-T A.8 (10/2008) iii CONTENTS Page 1 General . 1 2 Proces
12、s . 1 3 Prerequisites . 1 4 Last call and additional review. 2 5 Procedure at study group meetings 3 6 Notification 4 7 Correction of defects 5 8 Deletion of Recommendations. 5 8.1 Deletion of Recommendations by WTSA 5 8.2 Deletion of Recommendations between WTSAs . 5 Rec. ITU-T A.8 (10/2008) 1 Reco
13、mmendation ITU-T A.8 Alternative approval process for new and revised ITU-T Recommendations (2000; 2004; 2006; 2008) 1 General 1.1 Recommendations of the ITU Telecommunication Standardization Sector (ITU-T) will be approved using this alternative approval process (AAP), except Recommendations that h
14、ave policy or regulatory implications, which will be approved using the traditional approval process (TAP) found in Resolution 1 of the World Telecommunication Standardization Assembly (WTSA). The competent study group may also seek approval at a WTSA. 1.2 In accordance with the ITU Convention, the
15、status of Recommendations approved is the same for both AAP and TAP methods of approval. 2 Process 2.1 Study groups should apply the AAP described below for seeking the approval of draft new and revised Recommendations as soon as they have been developed to a sufficiently mature state. See Figure 1
16、for the sequence of events. 3 Prerequisites 3.1 Upon request of the study group chairman, the Director of the Telecommunication Standardization Bureau (TSB) shall announce the intention to apply AAP and to initiate the last call set out in this Recommendation (see clause 4 below). Such action shall
17、be based upon consent at a study group or working party meeting or, exceptionally, at a WTSA, that a draft Recommendation is sufficiently mature for such action. At this stage, the draft Recommendation is considered to have “CONSENT“. The Director shall include a summary of the draft Recommendation
18、in the announcement. Reference shall be provided to the documentation where the text of the draft new or revised Recommendation to be considered may be found. This information shall be made available to all Member States and Sector Members. 3.2 The text of the draft new or revised Recommendation mus
19、t be available to TSB in a final edited form at the time that the Director makes the announcement of the intended application of the AAP set out in this Recommendation. Any associated electronic material included in the Recommendation (e.g., software, test vectors, etc.) must also be made available
20、to TSB at the same time. A summary that reflects the final edited text of the draft Recommendation must also be provided to TSB, in accordance with clause 3.3 below. 3.3 Such a summary should be prepared in accordance with the Authors Guide for drafting ITU-T Recommendations. This summary is a brief
21、 outline of the purpose and content of the new or revised draft Recommendation and, where appropriate, the intent of the revisions. No Recommendation shall be considered as complete and ready for approval without this summary statement. 3.4 Approval may only be sought for a draft new or revised Reco
22、mmendation within the study groups mandate as defined by the Questions allocated to it, in accordance with No. 192 of the Convention. Alternatively, or additionally, approval may be sought for amendment of an existing Recommendation within the study groups responsibility and mandate. 2 Rec. ITU-T A.
23、8 (10/2008) 3.5 Where a draft new or revised Recommendation falls within the mandate of more than one study group, the chairman of the study group proposing the approval should consult and take into account the views of any other study group chairmen concerned before proceeding with the application
24、of this approval procedure. 3.6 Recommendations are to be elaborated in accordance with the Common Patent Policy for ITU-T/ITU-R/ISO/IEC available at http:/www.itu.int/ITU-T/ipr/. For example: 3.6.1 Any party participating in the work of ITU-T should, from the outset, draw the attention of the Direc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTA82008ALTERNATIVEAPPROVALPROCESSFORNEWANDREVISEDITUTRECOMMENDATIONS 对于 修订 建议 可选 批准 过程 PDF

链接地址:http://www.mydoc123.com/p-794310.html