GMW GMW17040-2013 Rear and Quarter Window 100 Hour Defroster Grid Test Issue 1 English.pdf
《GMW GMW17040-2013 Rear and Quarter Window 100 Hour Defroster Grid Test Issue 1 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW17040-2013 Rear and Quarter Window 100 Hour Defroster Grid Test Issue 1 English.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW17040 Rear and Quarter Window 100 Hour Defroster Grid Test Copyright 2013 General Motors Company All Rights Reserved November 2013 Page 1 of 5 1 Scope Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of c
2、onflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. This document is the GM worldwide glazing testing standard. The purpose is to establish a common test methodology for glazing materials to ensure that a high quality world class system is cons
3、istently developed and produced. This standard is for the development phase of new technologies but can be used for validation of the product. This document and any suggestions or revisions will be reviewed and/or updated annually by the Fixed Glass Global Subsystem Leadership Team (GSSLT). 1.2 Fore
4、word. This is a component/subsystem level test and should not be used for vehicle level testing. 1.3 Applicability. This standard is applicable for all passenger vehicles, Multipurpose Passenger Vehicles (MPV), and truck models with heated grid elements in fixed glass and produced by GM Worldwide. 2
5、 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3600 2.3 Additional References. Best Practice Number: 105219 (see Knowledge Set Number 1268). The supplier shall work with t
6、he GM responsible engineer to comprehend this requirement. GM Security Guidelines Subsystem Technical Specifications (SSTS) 3 Resources 3.1 Facilities. 3.1.1 Calibration. The test facilities and equipment shall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Al
7、ternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.2 Equipment. Thermal Image Camera Power Supply Direct Current (DC) Power Supply Data Acquisition/Switch
8、Unit Test Stand/Fixture Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW17040 Copyright 2013 General Motors Company All Rights Reserved N
9、ovember 2013 Page 2 of 5 3.3 Test Vehicle/Test Piece. Test samples shall be of production intent design and material for Design Validation (DV); or, production intent design and materials manufactured with production processes (home line) for Product Validation (PV). Any changes to the components or
10、 material, e.g., design, fit, form, function, properties, manufacturing process, and/or location of manufacture require revalidation. GM shall approve validation methods for product/process changes before the supplier is committed to the change. Refer to GMW3600. 3.4 Test Time. Calendar time: 6 days
11、 Test hours: 100 hours Coordination hours: 10 hours 3.5 Test Required Information. 3.5.1 GM validation is to be notified of test failures within 24 hour period of occurrence. 3.5.2 Supplier to develop five phase document for all test failures. 3.5.3 Product Security. Security protocol for the test v
12、ehicle must be followed per GM Security Guidelines. 3.6 Personnel/Skills. The test facility shall have sufficient personnel having the necessary education, training, technical knowledge, and experience for performing the required tests. 4 Procedure 4.1 Preparation. 4.2 Conditions. All conditions spe
13、cified shall be targeted toward the specified value with any given () tolerance used to compensate for variation. During testing, conditions specified shall not be readjusted within the tolerance unless it is to maintain the particular test condition within the specified tolerance. If such an adjust
14、ment is made, it shall be approved by the appropriate GM engineer prior to the start of any testing. Unless otherwise specified, perform the tests in the as received condition without any special pre-conditioning. 4.2.1 Environmental Conditions. The following conditions apply to all tests unless oth
15、erwise specified: Temperature: +23 3 C Voltage: VNOM 0.3 V at motor terminals Humidity 20 to 70% unless otherwise specified 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certifica
16、tes, reports, etc. See the GM Design Release Engineer (DRE) and/or the Subsystem Validation Engineer (SVE) for agreements. 4.3 Instructions. 4.3.1 Test Preparation. Using the thermal imaging camera take an infrared (IR) image of the glass test piece prior to running the test. Attach Thermal graphic
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW170402013REARANDQUARTERWINDOW100HOURDEFROSTERGRIDTESTISSUE1ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757973.html