1、 WORLDWIDE ENGINEERING STANDARDS General Specification GMW16530 Summary Document for GM Powertrain Requirements Copyright 2011 General Motors Company All Rights Reserved October 2011 Originating Department: North American Engineering Standards Page 1 of 13 1 Introduction Note: Nothing in this standa
2、rd supercedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Scope. This standard is a summary of the requirements for the GM Powertrain Statement of Requirements (SOR) describing the engineer
3、ing processes, tasks, events, and deliverables required of the Supplier to provide a Product/Commodity for the GM Powertrain Program(s). The SOR takes effect at the time of Supplier selection and continues through the phases of the Program(s) identified in 1.5. 1.2 Mission/Theme. Not applicable. 1.3
4、 Classification. Not applicable. 1.4 Complete Bill of Material with Cost. The Supplier shall provide completed price breakdowns on forms GM1810 Production Tooling Cost Line-up Form and GM1804 Piece Cost Breakdown Worksheet to the GM Buyer when the Supplier quotation is submitted. 1.5 Phases of the P
5、rogram. This SOR will apply throughout the design, development, validation, pre-production, production, and service life phases of the program(s) as described in the SOR appendices. The program(s) schedule(s) will be monitored through the Advanced Product Quality Planning and Control Plan (APQP proc
6、ess) and reviewed at meetings between representatives of GM and Supplier. Refer to all applicable programs, model years and duration for a Product/Commodity as described in SOR appendices. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External S
7、tandards/Specifications. ISO 1629 SAE J2332 ISO 11469 SAE/USCAR-25 ISO/TS 16949 VDA 260 2.2 GM Standards/Specifications. GMW3059 GMW14089 GMW15010 GMW15923 GMW3116 GMW14234 GMW15049 GMW16037 GMW3172 GMW14573 GMW15862 GMW16331 2.3 Additional References. Automotive Industry Action Group (AIAG) Potenti
8、al Failure Mode such as circuit boards, processors, Application Specific Integrated Circuits (ASIC) discrete electronic components, switches, relays, etc.; or devices with embedded software, shall adhere to the requirements specified in GMW15923 Statement of Requirements for All Electrical and Elect
9、ronic Systems and Components, unless otherwise specified. 3.12.1 All electrical and electronic systems or components shall be validated utilizing GMW3172 as the basis for the validation procedure unless otherwise specified. Additionally, design and packaging of electrical connectors shall comply wit
10、h ergonomic requirements specified in SAE/USCAR-25 Electrical Connector Assembly Ergonomic Design Criteria. 4 Program Support 4.1 Program Management. Supplier management and administration tasks are described in the following paragraphs. 4.1.1 Program Plan. Supplier shall prepare a Program Plan that
11、 encompasses the Advanced Product Quality Planning (APQP) expectations and identifies: 4.1.1.1 Program deliverables, requirements, and objectives and schedules. 4.1.1.2 The completion of each on a timing chart which conforms to the program milestones, including and comprehending any regional timing
12、differences on global programs. 4.1.1.3 The first draft of the Program Plan shall be submitted during the sourcing phase for the Product/Commodity to be supplied. 4.1.1.4 This plan, approved by the Buyer, shall be periodically reviewed and shall contain sufficient detail to enable GM to measure prog
13、ress of the Program. 4.1.1.5 This will be done in relation to the desired objectives. 4.1.1.6 Identify specific problem areas; assess the progress of the Program(s) in relation to the desired objectives; and determine a means for adjusting program efforts and resources to keep the Program(s) on trac
14、k toward the objectives. 4.1.1.7 Supplier shall publish periodic Program Plan updates showing the status of the Program activities. 4.1.1.8 The Program Plan shall be a summary of the specific individual plans required by this SOR and shall address all of the required Supplier plan deliverables, incl
15、uding the Resource Plan, Engineering Plan, Analysis Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16530 Copyright 2011 General Motors Company All Rights Reserved October 2011 Page 5 of 13 Development Validation
16、 Plan (ADV Plan), Reliability Program Plan, Build Plan, Mass Reduction Plan, and Service Readiness Plan. 4.1.1.9 Each of these plans shall be prepared by Supplier and submitted to GM for review and approval, per the summary of deliverables schedule. 4.1.1.10 Supplier shall execute and maintain all p
17、rogram management initiatives for the Program(s) (e.g, Gantt charts on tool timing). 4.1.1.11 Additionally, Supplier shall be the Program Manager for all Tiered Suppliers. 4.1.1.12 Additional information, including the following, shall be made available to GM as specified or upon request: Program ex
18、pense summaries shall be submitted monthly to GM Buyer (i.e., engineering spending curve). Supplier Status on the following major program imperatives shall be provided to GM Design Responsible Engineer on a monthly basis. Mass Piece Cost Investment Timing Product Performance Buildability Recyclabili
19、ty Design Status/Schedule Engineering Cost 4.1.2 Engineering Plan. Supplier shall develop an Engineering Plan (a subset of the Program Plan), approved by the Buyer and GM Design Responsible Engineer, consistent with each partys responsibilities, that describes how the requirements of the SOR will be
20、 achieved and that provides an overview of how the engineering tasks are going to be accomplished. 4.1.2.1 The Plan shall answer the questions of who, what, when, where, and how each of the required tasks will be accomplished. 4.1.2.2 The plan shall include Task Timing Schedule (chart) which identif
21、ies all tasks to be accomplished and shall show the start and completion time for each task with respect to the program(s) timing milestones. 4.1.2.3 The Engineering Plan shall also describe the design, materials, and manufacturing processes recommended or necessary to meet the requirements of this
22、SOR. 4.1.2.4 The Plan is to also define all open issues (such as unapproved materials requiring approval, interfacing part requirements necessary to execute the program, unspecified data, and tolerances) with an identified required completion date and responsible individual(s). 4.1.2.5 The Engineeri
23、ng Plan will serve as a record to GM and Supplier of the product development and execution phases of the Program(s) and the final Program(s) directions. 4.1.3 Advanced Product Quality and Planning (APQP). Advanced quality planning is a rigorous and structured method of defining and establishing the
24、steps necessary to assure that a product satisfies the customers needs. Requirements can be found in GM Global Supplier Quality Manual, (GM1927). There are also individual documents identifying specific areas that require additional quality information. These documents are available from GM Supply P
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW165302011SUMMARYDOCUMENTFORGMPOWERTRAINREQUIREMENTSENGLISHISSUE1 通用汽车 动力 系统 要求 总结 文件 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-757775.html