GMW GMW14731-2012 Stress-Corrosion Cracking of Copper Based Alloys Issue 2 English.pdf
《GMW GMW14731-2012 Stress-Corrosion Cracking of Copper Based Alloys Issue 2 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW14731-2012 Stress-Corrosion Cracking of Copper Based Alloys Issue 2 English.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、WORLDWIDEENGINEERINGSTANDARDSTest Procedure GMW14731Stress-Corrosion Cracking of Copper Based Alloys Copyright 2012 General Motors Company All Rights ReservedOctober 2012 Originating Department: North American Engineering Standards Page 1 of 41 ScopeNote: Nothing in this standard supercedes applicab
2、le laws and regulations.Note: In the event of conflict between the English and domestic language, the English language shall takeprecedence.1.1 Purpose. Stress-corrosion cracking (or, as it is alternatively known, season cracking) is failure by crackingunder the combined action of corrosion and stre
3、ss - either external (applied stress) or internal (residual stress).1.2 Foreword. Not applicable.1.3 Applicability. This test method shall be used to determine the susceptibility of formed components andsemi-finished products made from copper based alloys, especially copper-zinc alloys, to stress-co
4、rrosioncracking.This test is carried out by exposing sample components to suitable corrosive media under controlled conditionsfor specified time periods and subsequently examining for induced cracking.Two alternative methods are described:x Method A using an atmosphere of ammonia as the corrosive me
5、dium.x Method B using acidic mercurous nitrate as the corrosive medium.2 ReferencesNote: Only the latest approved standards are applicable unless otherwise specified.2.1 External Standards/Specifications.None2.2 GM Standards/Specifications.None2.3 Additional References.Guidance Note EH17 from the He
6、alth and Safety Executive3 Resources3.1 Facilities. Not applicable.3.2 Equipment.3.2.1 Apparatus. Test vessel made of glass and of suitable size to contain test piece and requisite volume oftest medium.In the case of Method A, the test vessel (approximately 150 mm high) must be fitted with a gas tig
7、ht sealedglass lid and a suitable glass grid or frame to allow suspension of the test piece above the test medium.Laboratory hot plate or oven fitted with an efficient extraction system (for Method B).Suitable magnifying aid giving magnification of 10x.3.2.2 Test Solution. For preparing the test sol
8、ution reagent grade constituents are required and distilled ordeionized water shall be used.3.2.2.1 Method A Solution. Ammonia solution, 25% by weight, shall be diluted with water to volume relation1 + 1 (density at +20 C = 0.946 g/cm3 to 0.950 g/cm3).Copyright General Motors Company Provided by IHS
9、 under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW14731 Copyright 2012 General Motors Company All Rights ReservedOctober 2012 Page 2 of 43.2.2.2 Method B Solution. Mercurous nitrate solut
10、ion containing 10 g HgNO3 and 10 mL HNO3 (specificgravity of 1.421) per liter is used.Prepared as follows: Dissolve either 11.4 g of HgNO3*2H2O or 10.7 g of HgNO3*H2O (equivalent to 10.7 g Hg2(NO3)2 x 2H2O) in approximately 40 mL of water acidified with 10 mL HNO3 (specific gravity of 1.421). Whencr
11、ystals have completely dissolved, dilute the solution with water to 1000 mL.Sulphuric acid, approximately 10% by weight.Nitric acid, approximately 30% by weight.3.3 Test Vehicle/Test Piece. The test piece wherever possible shall be the finished part. If thee size, shape,etc. of the finished part be
12、impracticable, then a suitable section should be taken from the part for testingpurposes. This section must be representative of maximum deformation encountered in forming of the part,and sectioning must be conducted in such a manner so as to minimize any relaxation of internal stresscontained withi
13、n the part.In the case of testing semi-finished products, suitable sections shall be used.For initial sample approval and arbitration purposes, at least three test pieces shall be tested. For routinequality control at least one test piece shall be tested.3.4 Test Time.3.4.1 Method A Test Time.Calend
14、ar time: 1 to 3 daysTest hours: 24 hours (maximum)Coordination hours: 2 hours3.4.2 Method B Test Time.Calendar time: 1 dayTest hours: 30 minutesCoordination hours: 2 hours3.5 Test Required Information. Not applicable.3.6 Personnel/Skills. Not applicable.4 Procedure4.1 Preparation.4.1.1 Test Piece Pr
15、eparation. The test piece shall be cleaned by degreasing in a suitable alkaline cleaner ororganic solvent and, if necessary, immersed for approximately 30 s in either sulphuric acid or nitric acid andsubsequently washed in clean running water to remove any adhered oxides and prior to test shall be d
16、ried.Surface coatings when present on test pieces shall be removed by suitable means before testing.For testing of semi-finished products or semi-finished product parts, the test piece, wherever possible, shall bepre-stressed such that the magnitude and direction of the applied stress shall equal th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW147312012STRESSCORROSIONCRACKINGOFCOPPERBASEDALLOYSISSUE2ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757554.html