1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW14381 Exhaust-System Hanger Durability Test Copyright 2011 General Motors Company All Rights Reserved July 2011 Originating Department: GME Specification Center Page 1 of 5 1 Scope Note: Nothing in this standard supercedes applicable laws and regula
2、tions. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. Determination of the hanger dynamic strength in a bench test. 1.2 Foreword. Not applicable. 1.3 Applicability. For all vehicle and exhaust-system hanger attachmen
3、ts. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. None 2.3 Additional References. CTS/drawing specification 3 Resources 3.1 Facilities. Oscillating or hydropulse unit with
4、closed loop force control and cycle counter. The test device shall be suitable for dynamic forces of (100 to 500) N with regard to a test frequency range of (10 to 20) Hz (sine). The test facility shall have a valid ISO certificate which is noted in a test report. 3.2 Equipment. 3.2.1 Peak Value Rec
5、order. To automatically record the force/travel amplitude, with automatic shut-off for the testing machine when the force-/travel amplitude exceeds the adjusted limiting values. 3.2.2 Test Piece Mounting and Force Application. The test piece shall be mounted such that the suspension fastening/connec
6、tion is not impaired (see Figure 1 as an example). The force application shall ensure the malleability of the suspension. A link of 150 mm with a U-joint at both ends shall be installed between load cell and force application. Copyright General Motors Company Provided by IHS under license with Gener
7、al Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW14381 Copyright 2011 General Motors Company All Rights Reserved July 2011 Page 2 of 5 Figure 1: Test Piece Mounting and Force Application 3.3 Test Vehicle/Test Pi
8、ece. At least 5 new production parts shall be tested. The suspension parts shall be produced as specified in the assembly drawing. 3.4 Test Time. Not applicable. 3.5 Test Required Information. Not applicable. 3.6 Personnel/Skills. Not applicable. 4 Procedure 4.1 Preparation. 4.1.1 Test Set-up. The t
9、est set-up shall be performed using the direction of force application determined from the strain collectives for the respective vehicle type and engine, which is indicated in the CTS/drawing specification. 4.2 Conditions. 4.2.1 Environmental Conditions. The test shall be performed at (+23 5) C. 4.2
10、.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. 4.3 Instructions. The strength test shall be performed as a single-step test. 4.3.1 Test force, test frequen
11、cy, test direction, cycles of failure (N 90%), and maximum permissible dispersion (N 90% / N 10%) shall be taken from the CTS/drawing specification. F = Fm (FT + FP) = Test force at load cell FP = Test force at test piece. Shall be taken from CTS/drawing specification. Copyright General Motors Compa
12、ny Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW14381 Copyright 2011 General Motors Company All Rights Reserved July 2011 Page 3 of 5 FT = Inertia force of force appli
13、cation measured from load cell connection. The dynamic influence of the test device mass shall be taken into account for the test. Fm = static preload which shall be taken from CTS/drawing specification. 4.3.2 At least 5 parts shall be tested for each type to allow a statistical evaluation according
14、 to the logarithmic normal distribution. 4.3.3 Shut-off criterion for the test is the increase of the oscillation amplitude or the test frequency which automatically shuts off the testing machine as soon as the adjusted limiting values are exceeded. 4.3.4 The limiting values shall be 110 % maximum o
15、f the actual values measured at the beginning of the test. 4.3.5 If no first visible cracks occur, the test may be stopped at N 10%-value as specified by CTS/drawing specification. 4.3.6 A test protocol according to Appendix A shall be used for recording of test data and results and shall be added t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW143812011EXHAUSTSYSTEMHANGERDURABILITYTESTISSUE2ENGLISH 排气 系统 挂钩 耐久性 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-757484.html