GMKOREA EDS-T-5114-2008 CHARGING SYSTEM CAPACITY EVALUATION.pdf
《GMKOREA EDS-T-5114-2008 CHARGING SYSTEM CAPACITY EVALUATION.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-5114-2008 CHARGING SYSTEM CAPACITY EVALUATION.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards CHARGING SYSTEM CAPACITY EVALUATION Do Not Use on New Programs. Being Replaced by GMW15485 EDS-T-5114 ISSUED DATE: 1995. 11. 20 REVISED DATE: 2008. 11. 04 VERSION: 4(Superceded) EDS-T-5114CHARGING SYSTEM CAPACITY EVAL
2、UATION PAGE: 1/14 ISSUED DATE: 1995. 11. 20 REVISED DATE: 2008. 11. 04 VERSION: 4 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project (incl. M300 Program). It is Superceded for all future projects and replaced by GMW15485 1. PURPOSE This standard aims at evaluatin
3、g appropriateness of the charging system capacity of passenger cars. 2. SCOPE This standard applies only to passenger cars or MPV. 3. CHARGING CIRCUIT MILLIVOLT DROP TEST 3.1. Test equipment 3.1.1. Electrical load checker (220V 150A) 3.1.2. Millivolt meter (030V, 0.5 Level) 3.1.3. Multi-range digita
4、l voltmeter 3.1.4. Wire harness (For measuring) 3.2. Test Method (Refer to Figure 1.) 3.2.1. Test equipment shall be allocated at convenient locations to conduct tests. 3.2.2. Turn all power to OFF (Key Off) and separate Regulator Connector from Alternator. 3.2.3. Connect Electrical Load Checker to
5、+ and terminals of the battery. 3.2.4. Jump connect Alternator output (B+) terminal and Alternator Rear Frame with appropriate wire/harness for 20A capacity. 3.2.5. Connect a milli-voltmeter to voltage testing terminal at Regulator harness and Alternator B+ terminal, supply 20A load, and measure dro
6、p in milli-voltage. (VRS mv Drop) 3.2.6. Connect a milli-voltmeter to voltage testing terminal at Regular harness and Battery + terminal, supply 20A load, and measure drop in milli-voltage drop (VR mv Drop). 3.2.7. Connect a milli-voltmeter to a Battery terminal and Alternator SRE frame, supply 20A
7、load, and measure milli-voltage drop in Ground Circuit. 3.2.8. Connect a milli-voltmeter to a Battery terminal and Alternator Engine Block, supply 20A load, and measure milli-voltage drop in Ground Circuit. 3.2.9. Connect a milli-voltmeter to Alternator SRE frame and Engine Block, supply 20A load, a
8、nd measure milli-voltage drop in Ground Circuit. EDS-T-5114CHARGING SYSTEM CAPACITY EVALUATION PAGE: 2/14 ISSUED DATE: 1995. 11. 20 REVISED DATE: 2008. 11. 04 VERSION: 4 GM DAEWOO Auto & Technology 3.2.10. Upon completion of milli-voltage drop measurements, turn off power to Electrical Load Checker
9、immediately and remove jump cables that connect Alternator Output (B+) terminal and Alternator SRE frame. 3.2.11. The evaluation criteria of milli-voltage drop are VRSmv Drop(MAX0.2V) and VRmv Drop(MAX 0.2V). 4. LOAD CURRENT TEST 4.1. Test Equipment 4.1.1. Electrical load checker (220V 150A) 4.1.2.
10、Millivolt meter (030V, 0.5 Level) 4.1.3. Multi-range digital voltmeter 4.1.4. Wire harness (For measuring) 4.2. Test preparation 4.2.1. Test shall be conducted in a laboratory of the constant temperature and humidity. 4.2.2. Test vehicle (1) Prepare the electric wiring diagram of the test vehicle. (
11、2) Identify normal operation of each load based on the electric wiring diagram of the test vehicle. (3) Record various data of the vehicle (engine & mission type, alternator & battery charging volume, etc) (4) Record the engine rpm and alternator rpm in idling. 4.2.3. Test equipment setting (1) Arra
12、nge the test equipment in a convenient place for test. (2) Remove the battery (+) (-) poles from the terminal. (3) Separate Alternator B+ terminal and Regulator Connector of the test vehicle from Alternator. (4) Connect Electrical Load Checker to wiring disconnected from the vehicles battery. 4.3. T
13、est procedure (See the Fig. 2) 4.3.1. Measurement of individual load (1) Turn on the P/S power, and measure the electric load indicated in Table 1. (2) When measuring the electric load, change the voltage from 12.2V, 12.6V and 13.5V to 14.5V and get the load to record it in Table 1. (3) Measure the
14、electric load in the order of B+ accessory ignition on engine run based on the needed power. (4) In engine run, be sure to remove the electrical load checker (+, -) and connect the battery cable to the battery and then separate them after start. (5) When measuring widely varying loads such as for wi
15、ndshield wipers, measure their peak values. (6) When measuring loads for Direction Indicators and Emergency Lamps, measure their peak values. EDS-T-5114CHARGING SYSTEM CAPACITY EVALUATION PAGE: 3/14 ISSUED DATE: 1995. 11. 20 REVISED DATE: 2008. 11. 04 VERSION: 4 GM DAEWOO Auto & Technology (7) When
16、measuring light switch load, the Instrument Panels illumination lamp shall be at its maximum brightness. 4.3.2. Measurement of combined load (1) Remove the electrical load checker (+, -) and connect the battery cable to the battery and then separate them after start. (2) In the engine idle state, sw
17、itch on the electric load of the mode designated in Table 2 (Night 1 or Night 2) in the vehicle. (3) When measuring the electric load checker, change the voltage from 12.2V, 12.6V and 13.5V to 14.5V and get the load to record it in Table 2. (4) Upon completion of test, make sure to reconnect Alterna
18、tor Voltage Regulator and Output B+ terminal to their original positions. 5. CHARGE/DISCHARGE LAB TEST 5.1. Test equipment 5.1.1. CR-7 (Data Acquisition System: Data logger that can be interfaced with PC). Use equipment that can measure temperature, voltage, and pulse. 5.1.2. Thermocouple (K & T Typ
19、e) & Electric wire 5.1.3. Laptop PC (RAM: 16MB min, HARD: 500MB min) 5.1.4. Multi digital voltage meter 5.1.5. Shunt (100A/50mv, 150A/50mv, 200A/50mv) 5.1.6. Inverter: Source DC 12V, Output AC 100V / 0.5 min. 5.1.7. Battery: 2EA (SOC 80% 1EA: for test, SOC 100% 1EA : for power supply to measuring in
20、struments) 5.1.8. Gravity meter: For measurement of battery gravity 5.2. Test place 5.2.1. Wind tunnel (hot chamber) (1) Temperature rise shall be allowed up to 38 & 40% RH (domestic) / 45 & 35% RH (hot climatic). (2) The chassis dynamo shall be furnished. (3) Measurement of the vehicle speed and en
21、gine rpm shall be ensured. (4) Sun load shall be possible. 5.3. Test preparation 5.3.1. Test vehicle (1) Test vehicle shall have traveled at least 3,000Km in principle. (2) Check each load and operating condition of the engine and transmission of the test vehicle. EDS-T-5114CHARGING SYSTEM CAPACITY
22、EVALUATION PAGE: 4/14 ISSUED DATE: 1995. 11. 20 REVISED DATE: 2008. 11. 04 VERSION: 4 GM DAEWOO Auto & Technology (3) Record various data of the vehicle (alternator & battery capacity, engine & transmission, etc.) (4) Check for specified oil and coolant and measure their amounts. (5) Record the engi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST51142008CHARGINGSYSTEMCAPACITYEVALUATIONPDF

链接地址:http://www.mydoc123.com/p-757108.html