GMKOREA EDS-T-2705-2010 J-Car Rear Transmission Mounts Fatigue Test.pdf
《GMKOREA EDS-T-2705-2010 J-Car Rear Transmission Mounts Fatigue Test.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-2705-2010 J-Car Rear Transmission Mounts Fatigue Test.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、 GMDAT ENGINEERING STANDARDS Test Procedures Chassis SUPERCEDED EDS-T-2705 J-Car Rear Transmission Mounts Fatigue Test This standard may be applied only for current project (incl. 200 Series). It is Superceded for all future projects and replaced by GMW14116. J-Car Rear Transmission Mounts Fatigue T
2、est Note: 8 E:48t G8 =9 (200 SeriesE F ) 7 FF7 957%L+ , FG P-P Program .Bd# GMW14116 ) $4=F7 957F$ . Copyright 2010 General Motors Company All Rights Reserved November 2010 Originating Department: GMDAT Engineering Standards Page 1 of 2 Version : 4 1 Introduction Note: Nothing in this standard super
3、sedes applicable laws and regulations. Note: In the event of conflict between the Korean and English language, the Korean language shall take precedence. 1.1 Purpose. To determine the fatigue life of the product population by specifying laboratory fatigue test procedures for the engine and transmiss
4、ion mounts. 1.2 Applicability. This standard applies to the laboratory fatigue test of all engine and transmission mounts fitted to J100 & J150 in section 3.2 below. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications
5、. None. 2.2 GM Standards/Specifications. None. 3 Test Requirements 3.1 Test Equipment Must Consist of the Following. 3.1.1 Hydraulic Supply. 3.1.2 Double Acting Hydraulic Actuator capable of applying load in the range +/- 10.0 kN and with a stroke not less than 50.0 mm. 3.1.3 10.0 kN Tension/Compres
6、sion Load Cell. 3.1.4 Displacement Transducer. 3.1.5 Single Channel PIDF Servocontroller with AC and DC signal conditioning. 3.1.6 Fixturing suitable to locate the component and test equipment such that loading is in the direction specified on component drawing. 3.2 Parts Applicable. 96308813 BRKT A
7、-TRANS MTG, REAR 96308100 BRKT A-TRANS MTG, REAR 96300692 BRKT A-TRANS MTG, REAR J150 96271523 BRKT A-TRANS MTG, REAR 4 Test Conditions 4.1 Procedure. 4.1.1 Ensure that the load cell and LVDT and correctly calibrated. The test is run in load control and the displacement amplitude is monitored to ens
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST27052010JCARREARTRANSMISSIONMOUNTSFATIGUETESTPDF

链接地址:http://www.mydoc123.com/p-756983.html