GMKOREA EDS-A-1010-2008 DRAWING TITLE BLOCK.pdf
《GMKOREA EDS-A-1010-2008 DRAWING TITLE BLOCK.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-A-1010-2008 DRAWING TITLE BLOCK.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards DRAWING TITLE BLOCK Do Not Use on New Programs. Being Replaced by Global Design Standards EDS-A-1010 ISSUED DATE: 1996. 03. 19 REVISED DATE: 2008. 05. 31 VERSION: 4 (Superceded) EDS-A-1010DRAWING TITLE BLOCK PAGE: 1/8
2、 ISSUED DATE: 1996. 03. 19 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project drawings generated by CATIA. It is Superceded for all future projects and replaced by Global Design Standards. 1. PURPOSE This standard aims at des
3、cribing the method of generating the title block in drawings to enable designers to understand and make use of it for improved work efficiency. 2. SCOPE This standard applies to generation of the title block in all drawings prepared by the GM DAEWOO Auto & Technology Company (hereinafter referred to
4、 as the “GMDAT“) engineering department. 3. APPLICABLE LETTERS All letters in the title block shall be in language that generates engineering drawing by authorized nation (hereinafter referred to as “Nation language”) or English, and the numeral letter shall be Arabic numeral in principle. National
5、language is used for the title of drawings and only in (13), (14) and (15) of Fig. 1. Further details shall confirm to EDS-A-1006(Letters Used in Drawings) 4. GENERATION METHOD 4.1. How to make title blocks. The following describes how to enter each item of the title block in GMDAT drawings. EDS-A-1
6、010DRAWING TITLE BLOCK PAGE: 2/8 ISSUED DATE: 1996. 03. 19 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Fig.1. 4.1.1. (1) DATE (ECR/EDS issuing date) (1) The ECR/EDS issuing date is entered by the designer in the order of day (two figures), month (two English alphabets) and year
7、 (last two figures). (2) Abbreviation for month January: JA, February: FE, March: MR, April: AP, May: MA, June: JU, July : JL, August: AU, September: SE, October: OC, November: NO, December: DE. 4.1.2. (2) SYM (Symbol) The symbol represents the changed position in the drawing. Further details shall
8、confirm to the clause 5.6 in EDS-A-1007. Initially released symbol is indicated using “-“. 4.1.3. (3) ZONE (Change zone) For easy identification of revision symbols on a drawing, the width and length zone numbers, which are marked along the drawing border, are entered in a way that the width letter
9、(alphabets) precedes the length number. Further details shall confirm to the clause 5.7 in EDS-A-1007. Initially released change zone is indicated using “-“. 4.1.4. (4) REVISION RECORD (Contents of revision) Contents of revision shall be entered in English in a simple and clear manner in principle.
10、In initial drawing release, EDS-A-1010DRAWING TITLE BLOCK PAGE: 3/8 ISSUED DATE: 1996. 03. 19 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology the following is entered. Further details shall confirm to the clause 5.3 in EDS-A-1007 1) PROTO EPI RELEASE Initial release of drawings for
11、 preliminary review of prototype products 2) PROTO RELEASE Initial release of confirmed drawings of prototype products 3) PRODUCTION EPI RELEASE Initial release of drawings for preliminary review of mass-production products 4) PRODUCTION RELEASE Initial release of confirmed drawings of mass-producti
12、on products. 4.1.5. (5) AUTHORITY The ECR(Engineering Change Recommendation)/EDR(Engineering Deviation Recommendation) number relating to the revision shall be entered by the design engineer. In case an ECR/EDR involves several drawing revisions, the ECR/EDR number is entered in the top line, and a
13、vertical line is drawn downwards. 4.1.6. (6), (7), (8) Signature column In each of signature columns, the following responsible persons shall put their signatures after confirming the contents DS: designer CK: reviewer AP: approver In case an ECR/EDR involves several drawing revisions, the signature
14、 columns is entered in the top line only one, and a vertical line is drawn downwards. 4.1.7. (9) GENERAL TOLERANCE (1) General tolerance of parts in the drawings is entered. (2) In case the part in the drawing requires a separate tolerance, it is entered along with dimensions of the part. In case of
15、 dimensions without specific tolerance, the general tolerance procedure(EDS-A-1101) is applied. (3) In installation, instruction, chart, layout and skin drawings, where general tolerance does not apply, it is indicated in “-“. 4.1.8. (10) PROJECT NO. (1) The project number to which drawings are appl
16、ied is entered. 4 digits that mixed with English and Arabic numeral is entered in principle.(Ex. T100, V200, -) (2) In case there are several applicable projects, the representative or the first applied project number is entered. (3) In case of special standard parts, - is entered instead of the pro
17、ject number. 4.1.9. (11) DWG. DATE (drawing generation date) The date of drawing preparation is entered in the order of day, month and year as follows. In case of month, for details see clause 4.1.1. EDS-A-1010DRAWING TITLE BLOCK PAGE: 4/8 ISSUED DATE: 1996. 03. 19 REVISED DATE: 2008. 05. 31 VERSION
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDSA10102008DRAWINGTITLEBLOCKPDF
