GMKOREA EDS-A-1007-2008 DRAWING REVISIONS.pdf
《GMKOREA EDS-A-1007-2008 DRAWING REVISIONS.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-A-1007-2008 DRAWING REVISIONS.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards DRAWING REVISIONS Do Not Use on New Programs. Being Replaced by Global Design Standards EDS-A-1007 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 (Superceded) EDS-A-1007DRAWING REVISIONS PAGE: 1/12 IS
2、SUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project drawings generated by CATIA. It is Superceded for all future projects and replaced by Global Design Standards. 1. PURPOSE This standard aims at correc
3、tly conveying the contents of drawing revisions resulting from a variety of reasons, such as the quality improvement, productivity enhancement and cost and weight reduction, and keeping the reasons and history of drawing revision. 2. SCOPE 2.1. This standard applies to product drawings (hereinafter
4、called “drawings“) released to the Engineering Change Procedures, and may also apply to the layout and package drawings. 2.2. It applies to cases where any letters and figures in the drawing are changed, added, deleted or re-generated. 3. TYPES OF DRAWING REVISION 3.1. Revision of drawing : when the
5、 original drawing is changed as follows: 3.1.1. Change in drawing contents 3.1.2. Addition of drawing contents 3.1.3. Deletion of drawing contents 3.2. Remaking of drawing : when a drawing is redrawn while keeping the previous drawing number 3.2.1. Redrawn with change 3.2.2. Redrawn without change 4
6、. NOTES IN DRAWING REVISION 4.1. Revision shall be made in conformity with the latest drawing standards. 4.2. Relations with other parts, development, assembly, maintenance and other overall effects shall be reviewed fully and carefully. 4.3. The original drawing shall not be damaged and the un-revi
7、sed portions shall not be erased. 4.4. The type of letters and the thickness of lines shall be as similar to the original drawings as possible. 4.5. When parts drawings are revised, the related assembly, instruction or installation drawings shall also be revised. EDS-A-1007DRAWING REVISIONS PAGE: 2/
8、12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 4.6. In the following cases, the revised drawing shall have a new part number or drawing number, not the existing part number or drawing number. 4.6.1. When performance or durability is influenced to an ex
9、tent that existing parts must be scrapped in order to ensure safety or to supplement insufficient function. 4.6.2. When full compatibility with the existing part is not ensured after revision in terms of performance and mounting condition due to changes in part dimensions, material or other characte
10、ristics. 5. REVISION METHOD 5.1. Order of revision registration 5.1.1. Revisions shall be registered from the bottom to the top of the revision table. When the revisions are made frequently to fill up the revision blocks, a new drawing is to be made in principle. 5.1.2. When revisions ought to be re
11、gistered in the same drawing for special reasons, they shall be continued in new blocks just left to them from the left top to the bottom as shown in Fig. 1. Fig. 1. Order of revision registration 5.2. Drawing revision table 5.2.1. All blocks in the revision table shall be filled. Blocks not requiri
12、ng entering shall be filled with a dash or vertical line. 5.2.2. In case a number of revision items occur at the same time, or when the recording must be made through several lines, the date, sign, and ECR number are entered only at the top line and a vertical line is drawn throughout related column
13、s. EDS-A-1007DRAWING REVISIONS PAGE: 3/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Fig. 2. Example of revision 5.3. Revision record column 5.3.1. Contents of revision shall be entered in English in a simple and clear manner in principle. When requir
14、ed, both English and Koreans letters may be entered together. 5.3.2. The initial release shall be identified according to the drawing release procedure. (1) PROTO EPI RELEASE : Drawing release for preview of prototype product (2) PROTO RELEASE : Drawing release for prototype product (3) PRODUCTION E
15、PI RELEASE : Drawing release for preview of mass-production product (4) PRODUCTION RELEASE : Drawing release for mass-production product 5.3.3. In case of revision from PROTO EPI RELEASE to PROTO RELEASE, from PROTO RELEASE to PRODUCTION EPI RELEASE, and from PRODUCTION EPI RELEASE to PRODUCTION REL
16、EASE, drawings shall be released after contents of revision is arranged in the revision table in principle. Drawing revision history may be left intact for special purposes (Ex: When working method and drawing revision history are required due to production line installation, part manufacturing proc
17、edure, etc.). Note) EPI : ENGINEERING PRELIMINARY RELEASE Fig. 3. Example of revision history left by release stage EDS-A-1007DRAWING REVISIONS PAGE: 4/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Fig. 4. Example of revision history left by release s
18、tage Fig .5. Example of release after arrangement of revision history 5.3.4. Such words as CHANGED, DELETED, and ADDED shall not be used it self. (1) Record in case of adding contents of drawing REMARK ADDED PART NO ADDED DIMENSION ADDED SECT BB ADDED (2) Record in case of changing contents of drawi
19、ng WAS 750.1 WAS 96108367 MATL WAS SCP 1 CHANGED ACC TO 96000135 WAS LOCATION HOLE Note) ACC TO : ACCORDING TO (3) Record in case of deleting contents of drawing DIMENSION 750.5 DELETED 13 HOLE DELETED HARDNESS SPEC DELETED SECT CC DELETED Fig. 6. Examples of records in drawings EDS-A-1007DRAWING RE
20、VISIONS PAGE: 5/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 5.3.5. Long contents are entered in two lines bundled by s square bracket on the left. 5.3.6. When the upper and lower tolerances are changed, they shall be recorded in a line continuously,
21、 not in the top and bottom. 5.3.7. When the form tolerance is changed, it shall be recorded as follows. Ex) WAS 0.25 A B Fig.7. Drawing revision record 5.4. Authority column 5.4.1. The ECR (ENGINEERING CHANGE RECOMMENDATION) number relating to the revision shall be entered by the design engineer. 5.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDSA10072008DRAWINGREVISIONSPDF