《GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf》由会员分享,可在线阅读,更多相关《GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 1 von 7LBSP GME PVS 1 09/97ENGINEERINGSTANDARDSEUROPEaTEST SPECIFICATIONPRFVORSCHRIFTPassenger Car - Heating - Ventilation and Air ConditioningPart 7, Heater CoreGME 13003Part/Teil 7Fahrzeug - Heizung - Belf
2、tung und Klimatisierung,Teil 7, WrmetauscherNote: This standard may be applied only for current projects incl. Global Epsilon (37#). It isSuperceded for all future projects and replaced by GMW14322.Hinweis: Diese Spezifikation darf nur noch fr laufende Projekte einschlielich Global Epsilon (37#)ange
3、wendet werden und ist fr alle zuknftigen Projekte ungltig und ersetzt durch GMW14322.Revisions/nderungenDate/Datum Description/Beschreibung Approved/Genehmigt23/JAN/2008 was issue 1, date of issue 06/95 / set to Supersededwar Ausgabe 1, Ausgabedatum 06/95 / Status auf Superseded“ gesetzt.Approved/Ge
4、nehmigtVolker Weber 21/JAN/2008 Jrg Kruse 23/JAN/2008Adam Opel GmbHGME VS ThermalAdam Opel GmbHGME Requirements EngineeringDespite spot checks possibly performed by the receiver, it is the suppliers responsibility that the delivered parts are in line with thesespecifications. Deliveries of samples,
5、first off-tool parts and parts, the performance of which has been changed, must be accompanied by a testreport showing the test results in terms of figures./Unbeschadet etwaiger durch den Abnehmer erfolgenden Stichprobenprfungen trgt der Lieferant die Verantwortung dafr, da die gelieferteWare diese
6、Vorschriften erfllt. Ein Prfbericht mit zahlenmigen Ergebnissen aus Prfungen der Lieferung selbst, ist bei jeder Bemusterung,Erstbelieferung und Ausfhrungsnderung mitzugeben.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Part/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08
7、Prepared/Ausgefertigt: K. MasanPage ofSeite 2 von 71 Test Methods and Requirements1.1 General1.1.1Heater cores must fulfill the requirements according to part 1.1.1.2If not otherwise specified, test samples shall be tested with production hoses. The hoses shall beconnected as in the vehicle applicat
8、ion. The connection shall be evaluated at the same time as theheater cores.1.2 Key CharacteristicsThe heater core must fulfill key characteristics (airside heat transfer, airside pressure drop, coolant sidepressure drop) as specified on the drawing or in the specification. Testing shall be performed
9、 accordingto GME L-13D-2.1.3 Odour TestIn the as received condition, after 5 min of usage and after completion of testing according to clauses 1.7and 1.12 the heater core must fulfill the requirements as specified in part 1, clause 7.1.7 of thisspecification (no objectionable odour permitted).1.4 Ti
10、ghtnessThe heater core and assembled connections must be tight. For verification the heater core shall becharged with air at a static pressure of 320 5 kPa gauge. No air bubbles may occur if heater core issubmerged in a water bath for 1 min. No visible deformation may occur after test.1.5 Internal T
11、ightnessTo verify internal tightness (between coolant inlet and outlet) of the heater core the test sample shall beinstalled in equipment (as described in specification GME L-13D-2). The inlet pipe of the heater coreshall be connected to the reservoir (content 3 l). The reservoir shall be filled wit
12、h water up to theoverflow outlet ( at 2/3 of its height). Within the test period of 1 h no water may drop out of the heatercore outlet.1.6 Tightness Under VacuumThe heater core shall provide sufficient strength and tightness under vacuum. The heater core shall beexposed for 3 min to an internal stat
13、ic pressure of -20 kPa gauge. Following this test the heater coremust fulfill the requirements according to clause 1.4.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Part/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 3 von 71 Pr
14、fverfahren und Anforderungen1.1 Allgemein1.1.1Wrmetauscher mssen die Anforderungen nach Teil 1 erfllen.1.1.2Wenn nicht anders gefordert, werden die Prfungen an den Wrmetauschern mit serienmigangeschlossenen Originalschluchen durchgefhrt und diese Verbindungen mitbeurteilt.1.2 KenndatenDer Wrmetausch
15、er mu bezglich der Kenndaten (Wrmeleistung luftseitig, Druckabfall Luft,Druckabfall Khlmittel) die Anforderungen nach Zeichnung bzw. Prfvorschrift erfllen. Die Prfungerfolgt nach GME L-13D-2.1.3 GeruchsprfungIm Anlieferungszustand, nach 5 min Betriebszeit und nach Abschlu der Prfungen 1.7 und 1.12,
16、muder Wrmetauscher die Anforderungen nach Teil 1, Pos. 7.1.7, dieser Spezifikation erfllen (keinstrender Geruch).1.4 DichtheitDer Wrmetauscher und die montierten Verbindungen mssen dicht sein. Zur Prfung wird derWrmetauscher in ein Wasserbad getaucht und ein statischer berdruck von 320 kPa 5 kPaaufg
17、ebaut. Innerhalb der Prfzeit von 1 min darf keine Blasenbildung auftreten. Nach der Prfung darfder Wrmetauscher keine erkennbare Verformung aufweisen.1.5 Innere DichtheitZur Prfung der inneren Dichtheit (zwischen Vor- und Rcklauf) des Wrmetauschers wird dieser in eineVorrichtung aufgebaut (wie in GM
18、E L-13D-2) dargestellt. Der Vorlauf des Wrmetauschers wird mit demWasserbehlter (Inhalt 3 l) verbunden und dieser bis zum berlauf ( auf 2/3 seiner Hhe) mit Wasserbefllt. Innerhalb der Prfzeit von 1 h darf am Rcklauf des Wrmetauschers kein Wasserheraustropfen.1.6 Dichtheitsprfung mit UnterdruckDer Wr
19、metauscher mu bei Unterdruck ausreichende Festigkeit und Dichtheit aufweisen. Auf denWrmetauscher wird 3 min lang ein statischer Druck von -20 kPa aufgebracht. Anschlieend mu derWrmetauscher die Anforderungen nach Pos. 1.4 erfllen.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Par
20、t/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 4 von 71.7 Temperature Cycle TestThe heater core shall be resistant against temperature cycles. For testing the heater core shall bemounted on a test stand and tested according to the following proce
21、dure:Cold coolant: 7 min coolant flow: (-10 C 3 K)then change within 10 s toHot coolant: 5 min coolant flow: (+100 C 2,5 K)Flow rate: 1000 l/h 50 l/hPressure gauge: +150 kPa 10 kPaNumber of cycles: 10001.8 Long-term Heat AgeingThe heater core shall be long term temperature resistant.For testing the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME13003PART72008PASSENGERCARHEATINGVENTILATIONANDAIRCONDITIONINGPART7HEATERCOREENGLISHGERMANTHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROJECTSINCLGLOBFUTPDF

链接地址:http://www.mydoc123.com/p-754863.html