《GEIA-HB-0005-1-2006 Program Management Systems Engineering Guidelines For Managing The Transition To Lead-Free Electronics《管理过渡到无铅电子产品项目管理 系统工程指引》.pdf》由会员分享,可在线阅读,更多相关《GEIA-HB-0005-1-2006 Program Management Systems Engineering Guidelines For Managing The Transition To Lead-Free Electronics《管理过渡到无铅电子产品项目管理 系统工程指引》.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、GEIA ENGINEERING BULLETIN Program Management/Systems Engineering Guidelines For Managing The Transition To Lead-Free Electronics GEIA-HB-0005-1 June 2006 GOVERNMENT ELECTRONICS AND INFORMATION TECHNOLOGY ASSOCIATION A Sector of the Electronic Industries Allianc Copyright Government Electronics 2002/
2、95/EC Restriction of Hazardous Substances (RoHS) and 2002/96/EC Waste Electrical and Electronic Equipment (WEEE) that restrict or eliminate the use of various substances in a variety of products that are produced after July 2006. One of the key materials restricted is lead (Pb), which is widely used
3、 in electronic solder and electronic piece part terminations. While these regulations may appear to only affect products for sale in the EU, due to the reduced market share of the aerospace and high performance industry in electronics, many of the lower tier suppliers will change their products beca
4、use their primary market is consumer electronics. Additionally, several U.S. states have enacted similar “green” laws and many Asian electronics manufacturers have recently announced completely green product lines. Since the aerospace industry is one of the few major industrial sectors that still re
5、pair Circuit Card Assemblies (CCAs) and since Pb-free materials and processes are relatively immature and poorly understood, an aerospace-wide approach to the transition was deemed to be highly valuable . 111 Copyright Government Electronics examples include circuit card assemblies and wire harnesse
6、s. COTS is defined as “commercial off the shelf. It can apply to a piece part, assembly, or unit. Critical item or function, if defective, will result in the systems inability to retain operational capability, meet primary objective, or affect safety. Customer refers to an entity or organization tha
7、t (a) integrates a piece part, soldered assembly, unit, or system into a higher level system, (b) operates the higher level system, or (c) certifies the system for use. For example, this may include end item users, integrators, regulatory agencies, operators, original equipment manufacturers (OEMs),
8、 and subcontractors. High Performance System or Product requires continued performance or performance on demand, or equipment down time cannot be tolerated, or end-use environment may be uncommonly harsh, and the equipment must function when required, such as life support or other critical systems L
9、ead-free is defined as less than O. 1% by weight of lead in accordance with Waste Electrical and Electronic Equipment (WEEE) guidelines Lead-free Control Plan (LFCP) refers to an aerospace or military system suppliers document that defines the processes that assure the plan owners, their customers,
10、and all other stakeholders that aerospace and high performance high-reliability electronics systems containing Pb-free solder will continue to be reliable, safe, producible, affordable, and supportable. An acceptable LFCP, per GEIA-STD-0005-1, will fulfill all intentions of the standard. ANSUASQC Q9
11、000 documentation may provide a strong basis for the control plan. Technical guidance on evaluating an adequate LFCP can be found in GEIA-HB-0005-2. May indicates a course of action that is permissible within the limits of this handbook, but not required. Pb-free Tin is defined to be pure tin or any
12、 tin alloy with pend3x B). 6.2 Additional Prime Contractor Requirements Additional prime contractor requirements need to be re-assessed with regard to a possible Pb- free transition. 6.3 Change Control The program manager should determine if any change from SnPb to Pb-free constitutes a change for w
13、hich customer approval is needed. The purpose is to assure that configuration control, traceability, and marking are properly controlled. 7 Use Environment(s) 7.1 Impact on Use Environment(s) The use environment(s) is defined by the program requirements. The program manager needs assurance from the
14、supplier that the transition from SnPb to Pb-free solder will not impact reliability of the product in the use environment. The consideration here is whether or not Pb- free solder will behave differently than SnPb solder in the use environment. 7.2 Impact on Storage and Transport The program manage
15、r or a designee should evaluate the storage and transport requirements with respect to any Pb-free implementation. The impact of SnPb versus Pb-free solder on long-term storage or transport environment could be significant and needs to be evaluated as part of the risk management plan. 8 Decision Cri
16、teria 8.1 Program Decision Concerning Pb-free The program manager must choose whether or not any Pb-free will be accepted. This decision should be based on customer feedback, risk analyses, system engineering analyses, and supplier 9 Copyright Government Electronics determine if this changes the sco
17、pe of any contracts. Assess impact on reliability of the piece part, assembly, unit and the system. Assess safety issues. Review maintainability requirements and determine the impact on frequency of maintenance. Assess impact on the components of the system that interface with the delivered product.
18、 Assess impacts on test equipment and/or test facilities. Determine any required changes in support equipment. Identification of the hardware, piece parts, and shipping containers. Determine any changes to the drawing requirements, solder callouts, process specifications and conformal coatings. Supp
19、lier Management Issues o Determine the availability of alternative suppliers. o Determine the feasibility of a lifetime buy of the old part. o Controls are in place for screeningheceiving Pb-free finishes piece parts. o Evaluate suppliers internal delivery schedule for any new parts. o Assess relati
20、onships of supplier to vendor: o Is suppliers vendor new or existing? o If new, can former vendor continue delivering the old part? o Evaluate risks due to changes of suppliers and vendors o Schedule o cost o Technical o Assess any opportunities for schedule or cost savings. Schedule Issues o Evalua
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GEIAHB000512006PROGRAMMANAGEMENTSYSTEMSENGINEERINGGUIDELINESFORMANAGINGTHETRANSITIONTOLEADFREEELECTRONICS

链接地址:http://www.mydoc123.com/p-754577.html