FORD WSS-M15P27-G-2016 PERFORMANCE HEADLINING FORMED TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD WSS-M15P27-G-2016 PERFORMANCE HEADLINING FORMED TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M15P27-G-2016 PERFORMANCE HEADLINING FORMED TO BE USED WITH FORD WSS-M99P1111-A .pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 2 2016 04 06 Editorial See Summary of Revisions A. Wagenhals, NA 2015 10 16 Editorial See Summary of Revisions A. Wagenhals, NA 2015 08 12 Released A.Wagenhals, D. Murtonen, FNA Controlled document at www.MATS Copyright 2016, Ford Global
2、 Technologies, LLC Page 1 of 11 PERFORMANCE, HEADLINING, FORMED WSS-M15P27-G 1. SCOPE The material defined by this specification is a fully finished, unitized formed headlining assembly consisting of a face material (un-laminated or laminated with foam) and substrate layers. Specific tests may requi
3、re all PIA (Part in Assembly) components to be included. 2. APPLICATION This unitized composite assembly is used as a headlining for all vehicles or as specified on the Engineering Drawing. PEC/FEC/PV testing must be conducted in compliance with program milestones unless otherwise specified by Ford
4、Engineering. Each substrate configuration must be tested including all fabric types as the requirement is form/shape dependent. (For example Steel Roof, M/R, Panoramic Roof, Fixed Glass Roof, etc.). If manufacturing localization occurs each regional/global program must be tested (See table 1 for add
5、itional reference). The following components used in the headlining system must meet the following requirements if present in the system: Interior Plastic Parts WSS-M15P4-F/latest Integral Air Duct WSB-M15P38-A/latest Label Performance WSS-M99P41-A10/A72/latest Roof Systems Fabric Performance WSS-M8
6、P27-A1/latest Head Impact Countermeasures (HIC) Material: Energy Absorbing Foam - WSS-M99P29-B/latest Thermoformed Polypropylene WSS-M4D1028-A2/latest Interior NVH Material - WSS-M99P32-D1/latest Foam Stuffers WSS-M99P48-A1/latest Additionally, the following components/materials should conform to th
7、eir respective active Ford Material/Performance Specifications as documented by the Engineering Drawing. Wire harness, washer hose, etc. 3. REQUIREMENTS 3.1 APPROVED SOURCES This specification is performance based and does not have approved sources. 3.2 CONDITIONING AND TEST CONDITIONS All test valu
8、es are based on material conditioned for not less than 24 h prior to testing in a controlled environment of 23 +/- 2 C and 50 +/- 5% relative humidity. Testing of the material should occur in the conditioning environment or soon after removal. ENGINEERING MATERIAL SPECIFICATION WSS-M15P27-G Copyrigh
9、t 2016, Ford Global Technologies, LLC Page 2 of 11 3.3 DV/PV TEST PLAN PEC/FEC/PV testing must be conducted in compliance with program milestones unless otherwise specified by Ford Engineering. See Table 1 for DV/PV testing. 3.4 VEHICLE INTERIOR ENVIRONMENTAL PERFORMANCE Materials used in interior a
10、pplications must meet the requirements outlined in WSS-M99P2222-D1/latest, Performance, Vehicle Interior Environmental Quality Material/Component Requirements. Data must be included in material submission package. 3.5 FOGGING (SAE J1756, 3 h at 100 C, 21 C cooling plate, post-test conditioning 16 h)
11、 Test substrate with fabric or fabric/foam composite. PIA (Part in Assembly) components shall meet fogging requirements according to the appropriate specification as listed in section 2.0 or the appropriate specification as called out on the Engineering Drawing. Fog Number 70 min Formation of clear
12、film, droplets or crystals is cause for rejection. 3.6 ODOR Rating 3 max (FLTM BO 131-03-Variant C) 3.7 FLAMMABILITY (ISO 3795/SAE J369) Burn Rate 100 mm/minute max Headliner substrate with fabric composite/non-woven shall be tested as one unit 100% fully bonded. PIA (Part in Assembly) bolt on compo
13、nents must meet flammability requirements for their respective performance or material specification unless 100% bonded to the substrate, such as over head consoles (OHC), finishers, etc. 3.8 CONSTRUCTION PROPERTIES 3.8.1 Transverse Strength 20 N min (SAE J949, average of maximum loads on 5 samples
14、in each direction, headliner thickness must be reported). Cut ten samples, five samples each machine direction (typical, fore-aft) and against machine direction (typical, cross car) as directed from Ford D therefore, each transition period will vary in length of time. Total test time should exceed H
15、eadliner Substrate Roof Metal Z dimension Z dimension Headliner edge near Moon roof/ sun roof opening. Headliner edge near door X/Y dimension: Measure total span of opening at mandatory check center points to adjacent check points. Left side of section not shown. ENGINEERING MATERIAL SPECIFICATION W
16、SS-M15P27-G Copyright 2016, Ford Global Technologies, LLC Page 8 of 11 38 h due to time required to transition from level to level. Test Criteria Visually evaluate the part before and after the test. Measure the part and record data at all specified locations at room temperature before and after cyc
17、ling on test buck or fixture. Depth and or gap measurements for each checkpoint location are to be noted prior to and at the end of the environmental cycle. The test criterion is to be applied 24 hours after completion of the Environmental test. The following requirements must be met both pre and po
18、sttest: No excessive deformation, irregularities in shape or contour should be observed causing perceived craftsmanship issues. The attachment system and any other PIA component that is attached to the back side of the substrate shall not show any evidence of delamination or separation from the head
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM15P27G2016PERFORMANCEHEADLININGFORMEDTOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-751283.html