FORD WSK-M6J162-A-1991 PRIMER REPAIR AIR DRYING《晾干式修复底漆》.pdf
《FORD WSK-M6J162-A-1991 PRIMER REPAIR AIR DRYING《晾干式修复底漆》.pdf》由会员分享,可在线阅读,更多相关《FORD WSK-M6J162-A-1991 PRIMER REPAIR AIR DRYING《晾干式修复底漆》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATIONMaterial Name Specification NumberDate Release No. Release/Revision1991-02-01 C01089481000 Released KW conc. J.SchultWP 3948-a Page 1 of 6 PRIMER, REPAIR, AIR DRYING WSK-M6J162-A1. SCOPEThe mat erial defined by this specification is a solvent borne air dryingrepair
2、 primer surfacer.2. APPLICATIONThis specification was originally released for material used as spot repairprimer on interior and exterior surfaces of vehicle bodies.The primer is used over current production primer surfacer and on areassanded through to bare metal.The prim er is suitable for use wit
3、h either solvent borne topcoats orwaterborne basecoats.The material is suitable for electrostatic spray application.3. REQUIREMENTS3.1 STATISTICAL PROCESSSupplie rs must conform to the requirements of Ford Quality SystemStanda rd Q-101. A mutually acceptable Control Plan as describedth erein is requ
4、ired for material/source approval. Appropriatestatist ical tools must be used to analyze process/product data sothat variation in the final product is continuously reduced.3.2 INFRARED SPECTROPHOTOMETRY AND/OR THERMAL ANALYSISFord Motor Company, at its option, may conduct infrared and/ortherma l ana
5、lysis of material/parts supplied to this specification.The IR spectra and thermograms established for i nitial approval shallconst itute the reference standard and shall be kept on file at thedesignated material lab oratory. All samples shall produce IR spectraand thermograms that correspond to the
6、reference standard when testedunder the same conditions.3.3 CONDITIONINGAll test values indicated herein are based on ma terial conditioned ina control led atmosphere of 23 +/- 2 C and 50 +/- 5 % relativehumidity for not less than 24 h prior to testing and tested under thesame conditions unless othe
7、rwise specified.ENGINEERING MATERIAL SPECIFICATIONWSK-M6J162-AWP 3948-b Page 2 of 6 3.4 COMPOSITION3.4.1 Resin: Synthetic resins.3.4.2 Pigments: Pigments to obtain the desiredco lour, mecanical resistance andcorrosion protection.3.4.3 Solvent Emissions see Initial Sample +/- 1 %(ASTM D 3960)This r e
8、quirement is as determined by the United StatesEnvironmental Protection Agency Reference Method #24 and isonly applicable to materials used in the USA.3.5 MATERIAL PROPERTIES3.5.1 Non-volatile see Initial Sample +/- 1 %;(FLTM BI 102-01) min 25 %The n on-volatile content shall be determined at a spra
9、yviscosity of 30 s according to para 3.5.4.3.5.2 Density see Initial Sample +/- 0,02 g/mL(ASTM D 1475)3.5.3 Viscosity as supplied see Initial Sample +/- 5 s(FLTM BI 111-01)3.5.4 Spray Viscosity as specified by the supplier(FLTM BI 111-01, FC #3)The primer can be reduced with Xylene (WSK-M14J239-A).3
10、.5.5 Storage Stability: 90 daysDuri ng a storage of 90 days between 5 and 32 C temperaturethe m aterial as supplied shall not settle up or cakeinsol uble. After the storage the material must pass allspecification requirements.3.6 PREPARATION OF TEST SPECIMEN3.6.1 Preparation of Test Panels(FLTM BI 1
11、03-02, Method A)Substrate: Standard Steel Panels UMA18005.Primer:Dry film thickness: 20 - 25 micrometreAir drying: 15 minutesSanding:After air drying, the primer shall be sanded and wiped offwith cleaning petrol ENGINEERING MATERIAL SPECIFICATIONWSK-M6J162-AWP 3948-b Page 3 of 6 Top Coat:Application
12、 of Ford Engineering approved current productiontop coat materials, film thickness and baking as specified inthe relevant Material specification.Colours: Two coat silve r metallic and solid colour black andwhite.3.6.2 Preparation of Repair Panels:Sta ndard Steel Panels, zinc phosphated according toW
13、SK-M 3P1-C shall be electrocoated with current approvedelect rocoat primer and primed with current approved primersurf acer. Film thickness and baking as specified in therelevant Material Specifications.The Test panels shall b e sanded through to bare metal in thecentre in a spot of 30 mm diameter u
14、sing P400 sanding paperand cleaning petrol. After wipe off with cleani ng petrol thepanels are primed and painted as shown in 3.6.1.3.6.3 AgeingTest panels prepared under this specification shall be agedfor at least 72 h at 23 +/- 2 C or 16 h at 45 +/- 1 C beforetesting for resistance properties.3.7
15、 APPEARANCE (Primer only)Col our, gloss and surface finish shall match master Trim Sampleand/or Master Appearance Sample as approved by Design.3.7.1 Colour light grey or(FLTM BI 109-01) beige3.7.2 Gloss, visual matt3.8 PAINT FILM PROPERTIES3.8.1 LevelingThe sur face of the primer shall be smooth wit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSKM6J162A1991PRIMERREPAIRAIRDRYING 晾干 修复 底漆 PDF

链接地址:http://www.mydoc123.com/p-750988.html